Identifying factors affecting resource availability for post‐disaster reconstruction: a case study in China

The availability of resources allows for the rapid and cost‐effective delivery of a construction project. For rebuilding programmes after a disaster, the need for better understanding of factors affecting resource availability and their potential impacts on resourcing outcomes can be of crucial importance to effective reconstruction performance. Drawing on an empirical survey in China following the 2008 Wenchuan earthquake, the critical factors affecting resource availability for post‐quake reconstruction of housing are identified. Resource availability in a post‐disaster situation is not only associated with (1) project‐related factors such as quantity of resources required, project schedule, project resourcing plan, and resource procurement lead time; and (2) factors related to the reconstruction practitioners, including competency of resourcing manager and qualification of contractor; but is also related to (3) factors external to reconstruction projects including legislation and policy, general economic environment, and resource transportation cost and method. To address these factors, a multi‐sector approach is needed for reconstruction decision makers and practitioners. A planned procurement strategy in the implementing contractors, a range of training initiatives for small and medium businesses, along with augmented regulatory, economic and transport infrastructure systems are likely to improve resource availability for post‐disaster rebuilding projects.

[1]  Robert W. McGee An economic and ethical analysis of the Katrina disaster , 2008 .

[2]  Kaori Yoshida,et al.  Determinants of Small Business Hazard Mitigation , 2005 .

[3]  Mohan Raj Manavazhi,et al.  Material and equipment procurement delays in highway projects in Nepal , 2002 .

[4]  E. J. Kaiser,et al.  Natural Hazard Mitigation: Recasting Disaster Policy And Planning , 1998 .

[5]  Walid Belassi,et al.  A new framework for determining critical success/failure factors in projects , 1996 .

[6]  Navin Peiris,et al.  The 2008 Wenchuan Earthquake : Risk Management Lessons and Implications , 2008 .

[7]  James Schwab,et al.  Planning for post-disaster recovery and reconstruction , 1998 .

[8]  Suzanne Wilkinson,et al.  RECONSTRUCTION PROCUREMENT SYSTEMS: THE 2005 MATATA FLOOD RECONSTRUCTION EXPERIENCE , 2005 .

[9]  A. Agapiou,et al.  The changing role of builders merchants in the construction supply chain , 1998 .

[10]  R. Weaving,et al.  World Bank Operations Evaluation Department , 2003 .

[11]  Tony Jackson Natural Hazard Mitigation: Recasting Disaster Policy and Planning , 2001 .

[12]  K. T. Yeo,et al.  Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects , 2002 .

[13]  Jack Hirshleifer,et al.  Some Thoughts on the Social Structure After a Bombing Disaster , 1956, World Politics.

[14]  Eddy M. Rojas,et al.  Labor Productivity Drivers and Opportunities in the Construction Industry , 2003 .

[15]  Rajib Shaw,et al.  Indian Ocean tsunami and aftermath: Need for environment‐disaster synergy in the reconstruction process , 2006 .

[16]  Florian Steinberg,et al.  Housing reconstruction and rehabilitation in Aceh and Nias, Indonesia—Rebuilding lives☆ , 2007 .

[17]  Stephen Pryke,et al.  Analysing construction project coalitions: exploring the application of social network analysis , 2004 .

[18]  Jennifer Duyne Barenstein,et al.  Housing reconstruction in post-earthquake Gujarat: A comparative analysis. , 2006 .

[19]  Derek S. Reiners Lessons of Disaster: Policy Change after Catastrophic Events , 2007, Perspectives on Politics.

[20]  Abhas K. Jha,et al.  Safer Homes, Stronger Communities: A Handbook for Reconstructing After Natural Disasters , 2010 .

[21]  J. Frame Book Review: Procurement Systems: A Cross-Industry Project Management Perspective , 2008 .

[22]  Budi,et al.  Livelihoods and forest resources in Aceh and Nias for sustainable forest resource management and economic progress: report of the project identification study , 2007 .

[23]  C. B. Tatum Building Better: Technical Support for Construction , 2005 .

[24]  K. Krippendorff Krippendorff, Klaus, Content Analysis: An Introduction to its Methodology . Beverly Hills, CA: Sage, 1980. , 1980 .

[25]  H. Ping Tserng,et al.  Developing a resource supply chain planning system for construction projects , 2006 .

[26]  John Kelsey,et al.  What do construction project planners do , 2005 .

[27]  Paul K. Freeman,et al.  Allocation of post-disaster reconstruction financing to housing , 2004 .

[28]  Suzanne Wilkinson,et al.  Building resilience by focusing on legal and contractual frameworks for disaster reconstruction , 2008 .

[29]  T. E. Russell The humanitarian relief supply chain : analysis of the 2004 South East Asia earthquake and Tsunami , 2005 .

[30]  Sisira Jayasuriya,et al.  Reconstruction after a major disaster: Lessons from the post-Tsunami experience in Indonesia, Sri Lanka, and Thailand , 2008 .

[31]  S. Huq,et al.  Disasters and development , 2013 .

[32]  Khaled A El-Rayes,et al.  Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .

[33]  Khaled A El-Rayes,et al.  Trade-off between Safety and Cost in Planning Construction Site Layouts , 2005 .

[34]  Klaus Krippendorff,et al.  Content Analysis: An Introduction to Its Methodology , 1980 .

[35]  David A. McEntire,et al.  A Comparison of Disaster Paradigms: The Search for a Holistic Policy Guide , 2002 .

[36]  R. Olshansky Planning After Hurricane Katrina , 2006 .

[37]  Gary David Holt,et al.  Factors influencing craftsmen's productivity in Indonesia , 1997 .

[38]  Mark Considine,et al.  Governance at ground level: The frontline bureaucrat in the age of markets and networks , 1999 .

[39]  R. Burby Hurricane Katrina and the Paradoxes of Government Disaster Policy: Bringing About Wise Governmental Decisions for Hazardous Areas , 2006 .

[40]  Robert Deward Mason,et al.  Essentials of statistics , 1981 .

[41]  Joseph Ashmore,et al.  The Meaning of Build Back Better: Evidence from Post-Tsunami Aceh and Sri Lanka , 2008 .

[42]  Shu-Shun Liu,et al.  Optimization model for resource assignment problems of linear construction projects , 2007 .

[43]  Low Sui Pheng,et al.  Environmental factors and work performance of project managers in the construction industry , 2006 .

[44]  Walter O. Rom,et al.  Analysis of the characteristics of projects in diverse industries , 1998 .

[45]  David Alexander,et al.  Principles of Emergency Planning and Management , 2002 .

[46]  Suahasil Nazara,et al.  Aceh-Nias Reconstruction and Rehabilitation: Progress and Challenges at the End of 2006 , 2007 .

[47]  Chris Skelcher,et al.  The Dynamics of Multi‐organizational Partnerships: an Analysis of Changing Modes of Governance , 1998 .

[48]  Robert E. Spekman Competitive procurement strategies: Building strength and reducing vulnerability , 1985 .

[49]  Francis Tekyi Edum-Fotwe,et al.  Developing project management competency: perspectives from the construction industry , 2000 .

[50]  Andrew D.F. Price,et al.  Building a conceptual framework for measuring business performance in construction: an empirical evaluation , 2005 .

[51]  James Olabode Bamidele Rotimi,et al.  Comparison between routine construction and post-disaster reconstruction with case studies from New Zealand , 2006 .

[52]  Peter W. G. Morris,et al.  The Anatomy of Major Projects , 1987 .

[53]  S. Kenny Reconstruction in Aceh: Building Whose Capacity? , 2007 .

[54]  Suzanne Wilkinson,et al.  Resourcing challenges for post-disaster housing reconstruction: a comparative analysis , 2010 .

[55]  Masanobu Shinozuka,et al.  Integrating Transportation Network and Regional Economic Models to Estimate the Costs of a Large Urban Earthquake , 2001 .

[56]  Maggie Stephenson,et al.  The challenges of reconstruction after the October 2005 Kashmir earthquake , 2008 .

[57]  Dennis J. Osborne,et al.  Reconstruction after the 2004 tsunami: ecological and cultural considerations from case studies , 2006, Landscape and Ecological Engineering.

[58]  Y. C. Kog,et al.  Critical Success Factors for Different Project Objectives , 1999 .

[59]  Jaideep Motwani,et al.  Measuring construction productivity: a practical approach , 1995 .

[60]  Adedeji Badiru,et al.  Essentials of Project and Systems Engineering Management , 1997 .