Fuzzy AHP Model for Prequalification of Engineering Consultants in the Iranian Public Procurement System

AbstractPrequalification of engineering consultants in the Iranian public procurement system is suffering from arbitrary processes and criteria that cannot effectively shortlist the increasing number of potential bidders. This study aims to develop a prequalification model that can serve as the basis for revising the existing regulations and criteria. The authors conducted interviews among experts to localize a framework of prequalification criteria. Fuzzy analytical hierarchy process (FAHP), accompanied by a survey among industry participants, was used to determine the importance level of decision criteria. The results confirmed that the existing guidelines cannot meet the expectations of the industry due to the overemphasis on the past performance of consultants and disregarding their current capabilities. For the international audience, this study clarifies that (1) the working culture of industry participants impacts their judgments on the importance level of intangible and tangible criteria used for ...

[1]  Huseyin Basligil,et al.  Pre-selection of suppliers through an integrated fuzzy analytic hierarchy process and max-min methodology , 2010 .

[2]  Franco K.T. Cheung,et al.  Multi-criteria evaluation model for the selection of architectural consultants , 2002 .

[3]  Jeffrey S. Russell,et al.  QUALIFIER-1: CONTRACTOR PREQUALIFICATION MODEL , 1990 .

[4]  T. Stewart A CRITICAL SURVEY ON THE STATUS OF MULTIPLE CRITERIA DECISION MAKING THEORY AND PRACTICE , 1992 .

[5]  Sadi Assaf,et al.  Causes of Delay in Large Building Construction Projects , 1995 .

[6]  Sangwook Lee,et al.  Determination of Priority Weights under Multiattribute Decision-Making Situations: AHP versus Fuzzy AHP , 2015 .

[7]  Remon Fayek Aziz,et al.  Exploring delay causes of road construction projects in Egypt , 2016 .

[8]  Leentje Volker,et al.  Deciding about Design Quality: Value judgements and decision making in the selection of architects by public clients under European tendering regulations , 2011 .

[9]  Lotfi A. Zadeh,et al.  Fuzzy Sets , 1996, Inf. Control..

[10]  D. Chang Applications of the extent analysis method on fuzzy AHP , 1996 .

[11]  Hamid Abdirad,et al.  Barriers to effective implementation of quality management systems in public design projects in Iran , 2015 .

[12]  S. Thomas Ng,et al.  EQUAL: a case-based contractor prequalifier , 2001 .

[13]  Yawei Li,et al.  Fuzzy Approach to Prequalifying Construction Contractors , 2007 .

[14]  Edyta Plebankiewicz A fuzzy sets based contractor prequalification procedure , 2012 .

[15]  Edyta Plebankiewicz,et al.  Contractor prequalification model using fuzzy sets , 2010 .

[16]  Thomas L. Saaty,et al.  DECISION MAKING WITH THE ANALYTIC HIERARCHY PROCESS , 2008 .

[17]  Gary David Holt,et al.  Prequalification and multi-criteria selection: a measure of contractors' opinions , 1998 .

[18]  Miroslaw J. Skibniewski,et al.  DECISION CRITERIA IN CONTRACTOR PREQUALIFICATION , 1988 .

[19]  Khaled Nassar,et al.  Prequalification of Egyptian construction contractors using fuzzy‐AHP models , 2013 .

[20]  Lotfi A. Zadeh,et al.  The concept of a linguistic variable and its application to approximate reasoning-III , 1975, Inf. Sci..

[21]  Josefin Sporrong,et al.  Criteria in consultant selection: Public procurement of architectural and engineering services , 2011 .

[23]  Martin Skitmore,et al.  Assessment and evaluation of contractor data against client goals using PERT approach , 1997 .

[24]  Ekambaram Palaneeswaran,et al.  Recent advances and proposed improvements in contractor prequalification methodologies , 2001 .

[25]  R. Hämäläinen,et al.  An Experiment on the Numerical Modelling of Verbal Ratio Statements , 1997 .

[26]  Jeffrey S. Russell,et al.  Model for Owner Prequalification of Contractors , 1990 .

[27]  M. M. Rahman Cost of Prequalification: A Pilot Study , 2015 .

[28]  R. Edward Minchin,et al.  Quality-Based Contractor Rating Model for Qualification and Bidding Purposes , 2005 .

[29]  Miroslaw J. Skibniewski,et al.  Qualifier-2: Knowledge-Based System for Contractor Prequalification , 1990 .

[30]  V. Belton A comparison of the analytic hierarchy process and a simple multi-attribute value function , 1986 .

[31]  Abdulaziz A. Bubshait,et al.  Contractor Prequalification in Saudi Arabia , 1996 .

[32]  Keith R. Molenaar,et al.  Analysis of Causes of Delay and Time Performance in Construction Projects , 2014 .

[33]  Alexandra Van den Abbeele,et al.  Public procurement of consulting services: Evidence and comparison with private companies , 2006 .

[34]  R. W. Saaty,et al.  The analytic hierarchy process—what it is and how it is used , 1987 .

[35]  Daniel Kubek,et al.  Multicriteria Selection of the Building Material Supplier Using AHP and Fuzzy AHP , 2016 .

[36]  Sadi Assaf,et al.  A multi‐criterion decision‐making model for contractor prequalification selection , 1994 .

[37]  David Eaton,et al.  Contractor pre-qualification model: State-of-the-art , 2007 .

[38]  Weld Coxe,et al.  Success Strategies for Design Professionals: SuperPositioning for Architecture and Engineering Firms , 1987 .

[39]  W. Newton Suter,et al.  Introduction to Educational Research: A Critical Thinking Approach , 2005 .

[40]  Gary David Holt,et al.  Achieving quality construction projects based on harmonious working relationships: clients' and architects' perceptions of contractor performance , 2001 .

[41]  W. Curnow,et al.  Unsustainable bidding costs: a critical issue for the public private partnerships , 2005 .

[42]  Victor Sanvido,et al.  Design/Build Prequalification System , 1994 .

[43]  Zhongsheng Hua,et al.  On the extent analysis method for fuzzy AHP and its applications , 2008, Eur. J. Oper. Res..

[44]  S. Thomas Ng,et al.  Evaluating engineering consultants' general capabilities during the pre‐selection process – a Hong Kong study , 2004 .

[45]  Ying-Ming Wang,et al.  An approach to avoiding rank reversal in AHP , 2006, Decis. Support Syst..

[46]  Martin Skitmore,et al.  Contractor selection using multi criteria utility theory: an additive mode , 1998 .

[47]  Yean Yng Ling,et al.  A conceptual model for selection of architects by project managers in Singapore , 2003 .

[48]  S. T Ng,et al.  Client and consultant perspectives of prequalification criteria , 1999 .

[49]  Ahmad Hadavi,et al.  Effects of high prequalification requirements , 1999 .

[50]  Robert Eadie,et al.  Pre-Selection of Construction Consultants based on Attributes of Trust , 2012 .

[51]  Gary David Holt,et al.  Evaluating prequalification criteria in contractor selection , 1994 .

[52]  Cengiz Kahraman,et al.  Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey , 2004 .

[53]  Ana Nieto-Morote,et al.  A fuzzy multi-criteria decision making model for construction contractor prequalification , 2012 .

[54]  Sai On Cheung,et al.  Towards an organizational culture framework in construction , 2011 .

[55]  Kamal M. Al‐Subhi Al‐Harbi,et al.  Application of the AHP in project management , 2001 .

[56]  Nazmul Siddique,et al.  Computational Intelligence: Synergies of Fuzzy Logic, Neural Networks and Evolutionary Computing , 2013 .

[57]  Nii Ankrah,et al.  Architects and contractors: a comparative study of organizational cultures , 2005 .

[58]  Jeffrey S. Russell,et al.  CONTRACTOR PREQUALIFICATION USING FUZZY SETS , 1994 .

[59]  Metin Celik,et al.  Application of fuzzy extended AHP methodology on shipping registry selection: The case of Turkish maritime industry , 2009, Expert Syst. Appl..

[60]  Mostafa Khanzadi,et al.  Fuzzy adaptive decision making model for selection balanced risk allocation , 2012 .

[61]  Jiří Franek,et al.  Judgment Scales and Consistency Measure in AHP , 2014 .

[62]  Ka Chi Lam,et al.  Decision support system for contractor pre-qualification : artificial neural network model , 2000 .