An Approach for Risk Prioritization in Construction Projects Using Analytic Network Process and Decision Making Trial and Evaluation Laboratory

Construction projects always deal with different types of risks such as financial problems, legal factors, availability of resources and other issues during the project lifecycle. According to the type, size and complexity of the project, the number and intensity of risks could be different and many projects cannot reach the project goals due to exposure to multiple risks. This study aims to propose a hybrid DEMATEL-ANP model for risk prioritization in construction projects and the originality of the work comes from its ability to consider interdependencies between risk factors. The first stage of model applied Delphi method to use experts’ judgments for risk identification. The second stage used Decision-Making Trial and Evaluation Laboratory (DEMATEL) method to define the interdependencies’ relative intensity among the risks. Afterwards, Analytic Network Process (ANP) method is used in the third stage to assess the relative importance of the risk factors to define risk priorities in project. A case study of oil pipeline project is reported to indicate efficiency and performance of the proposed model. The results indicated that the proposed methodology could successfully reveal the important risk factors and define the interdependencies between them in the case study. On the whole, the proposed methodology can be considered as an efficient approach for risk assessment in construction projects.

[1]  Adiel Teixeira de Almeida,et al.  A multicriteria model for risk sorting of natural gas pipelines based on ELECTRE TRI integrating Utility Theory , 2010, Eur. J. Oper. Res..

[2]  Gholamreza Abdollahzadeh,et al.  Risk Assessment in Bridge Construction Projects Using Fault Tree and Event Tree Analysis Methods Based on Fuzzy Logic , 2015 .

[3]  Robert J. Chapman,et al.  The controlling influences on effective risk identification and assessment for construction design management , 2001 .

[4]  Martin Schieg Risk management in construction project management , 2006 .

[5]  David Baccarini,et al.  The risk ranking of projects: a methodology , 2001 .

[6]  Murat Gunduz,et al.  Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects. , 2013, Journal of safety research.

[7]  Zhen Chen,et al.  An Analytical Network Process model for risks prioritisation in megaprojects , 2015 .

[8]  Abbas Mardani,et al.  A fuzzy analytic network process method for risk prioritization in freeway PPP projects: an Iranian case study , 2015 .

[9]  Terje Aven,et al.  Risk assessment and risk management: Review of recent advances on their foundation , 2016, Eur. J. Oper. Res..

[10]  G. Wu,et al.  Risk Assessment for Construction Joint Ventures in China , 2001 .

[11]  Hangseok Choi,et al.  Risk analysis using fault-tree analysis (FTA) and analytic hierarchy process (AHP) applicable to shield TBM tunnels , 2015 .

[12]  S. Meysam Mousavi,et al.  Construction-project risk assessment by a new decision model based on De-Novo multi-approaches analysis and hesitant fuzzy sets under uncertainty , 2018, J. Intell. Fuzzy Syst..

[13]  Yu Yang,et al.  A Study on Management Risk Evaluation System of Large-Scale Complex Construction Projects , 2011, Modeling Risk Management in Sustainable Construction.

[14]  Andrew D.F. Price,et al.  Modelling global risk factors affecting construction cost performance , 2003 .

[15]  Zong-Han Wu,et al.  Identifying and assessing critical risk factors for BIM projects: Empirical study , 2014 .

[16]  Aminah Robinson Fayek,et al.  Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP , 2010 .

[17]  Patrick X.W. Zou,et al.  Understanding the key risks in construction projects in China , 2007 .

[18]  S. El-Sayegh Risk assessment and allocation in the UAE construction industry , 2008 .

[19]  Anthony Mills,et al.  A systematic approach to risk management for construction , 2001 .

[20]  N. Kartam,et al.  Risk and its management in the Kuwaiti construction industry: a contractors’ perspective , 2001 .

[21]  Desheng Dash Wu,et al.  Modeling Risk Management in Sustainable Construction , 2011 .

[22]  Tarek Zayed,et al.  Assessing risk and uncertainty inherent in Chinese highway projects using AHP , 2008 .

[23]  Adiel Teixeira de Almeida,et al.  Multi-attribute risk assessment for risk ranking of natural gas pipelines , 2009, Reliab. Eng. Syst. Saf..

[24]  Yohay Carmel,et al.  Uses and Misuses of Multicriteria Decision Analysis (MCDA) in Environmental Decision Making , 2009, Risk analysis : an official publication of the Society for Risk Analysis.

[25]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .

[26]  Reza Kiani Mavi,et al.  Crude oil supply chain risk management with DEMATEL–ANP , 2015, Oper. Res..

[27]  Nigel J. Smith,et al.  Application of a fuzzy based decision making methodology to construction project risk assessment , 2007 .

[28]  Hao-Tien Liu,et al.  A fuzzy risk assessment approach for occupational hazards in the construction industry , 2012 .

[29]  Desheng Dash Wu,et al.  Introduction to the Special Issue on "Operational Research and Asia Risk Management" , 2011, Asia Pac. J. Oper. Res..

[30]  Colin Duffield,et al.  Risk management in the Chinese construction industry , 2007 .

[31]  Joseph H. M. Tah,et al.  A proposal for construction project risk assessment using fuzzy logic , 2000 .

[32]  Mladen Radujković,et al.  Internal and external risk based assesment and evaluation for the large infrastructure projects , 2016 .

[33]  Wanda Curlee,et al.  Going beyond the Project Management Body of Knowledge (PMBOK®) Guide , 2010 .

[34]  Ibsen Chivatá Cárdenas,et al.  Using Prior Risk‐Related Knowledge to Support Risk Management Decisions: Lessons Learnt from a Tunneling Project , 2014, Risk analysis : an official publication of the Society for Risk Analysis.

[35]  Maruf Pasha,et al.  A Critical Analysis of Software Risk Management Techniques in Large Scale Systems , 2018, IEEE Access.

[36]  Osman Taylan,et al.  Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies , 2014, Appl. Soft Comput..

[37]  Ana Nieto-Morote,et al.  A fuzzy approach to construction project risk assessment , 2011 .

[38]  T. Saaty,et al.  The Analytic Hierarchy Process , 1985 .

[39]  G. Büyüközkan,et al.  An integrated DEMATEL-ANP approach for renewable energy resources selection in Turkey , 2016 .

[40]  Matthew R. Hallowell,et al.  Construction Safety Risk Modeling and Simulation , 2016, Risk analysis : an official publication of the Society for Risk Analysis.

[41]  Gwang-Hee Kim,et al.  Comparison of Risk Assessment for a Nuclear Power Plant Construction Project Based on Analytic Hierarchy Process and Fuzzy Analytic Hierarchy Process , 2016 .

[42]  Kyungmo Park,et al.  Project Risk Factors Facing Construction Management Firms , 2019 .

[43]  Onur Behzat Tokdemir,et al.  Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation , 2019 .

[44]  Ibsen Chivatá Cárdenas,et al.  Capturing and Integrating Knowledge for Managing Risks in Tunnel Works , 2013, Risk analysis : an official publication of the Society for Risk Analysis.

[45]  A. Gabus,et al.  World Problems, An Invitation to Further Thought within the Framework of DEMATEL , 1972 .

[46]  Rafael M. Gasca,et al.  Automatic Verification and Diagnosis of Security Risk Assessments in Business Process Models , 2019, IEEE Access.

[47]  Gülçin Büyüközkan,et al.  A novel fuzzy multi-criteria decision framework for sustainable supplier selection with incomplete information , 2011, Comput. Ind..

[48]  T. Saaty Risk-Its Priority and Probability: The Analytic Hierarchy Process , 1987 .

[49]  Aviad Shapira,et al.  AHP-based analysis of the risk potential of safety incidents: Case study of cranes in the construction industry , 2017 .

[50]  Thomas L. Saaty,et al.  Rank from comparisons and from ratings in the analytic hierarchy/network processes , 2006, Eur. J. Oper. Res..

[51]  Mohsen Ahmadi,et al.  Comprehensive Risk Management using Fuzzy FMEA and MCDA Techniques in Highway Construction Projects , 2016 .

[52]  Intensitas,et al.  Analytical Hierarchy Process , 2017 .

[53]  Desheng Dash Wu,et al.  Enterprise Risk Management in Projects , 2010 .

[54]  Edmundas Kazimieras Zavadskas,et al.  Risk assessment of construction projects , 2010 .

[55]  Özer Uygun,et al.  An integrated DEMATEL and Fuzzy ANP techniques for evaluation and selection of outsourcing provider for a telecommunication company , 2015, Comput. Ind. Eng..

[56]  Terry Lyons,et al.  Project risk management in the Queensland engineering construction industry : a survey , 2004 .

[57]  Yao-Chen Kuo,et al.  Using fuzzy multiple criteria decision making approach to enhance risk assessment for metropolitan construction projects , 2013 .

[58]  Duangpun Kritchanchai,et al.  DEMATEL-modified ANP to evaluate internal hospital supply chain performance , 2016, Comput. Ind. Eng..

[59]  Luis Guillermo Garzón Ospina,et al.  A Methodological Proposal for Risk Analysis in the Construction of Tunnels , 2019 .

[60]  Gang Kou,et al.  Analytic network process in risk assessment and decision analysis , 2014, Comput. Oper. Res..