Lot-sizing rules and freezing the master production schedule in material requirements planning systems

Abstract Freezing the master production schedule (MPS) is one of the frequently used methods for reducing schedule instability in multilevel material requirements planning (MRP) systems. The selection of lot sizing rule and the selection of MPS freezing parameters have been shown to significantly influence MRP performance. This study examines the impact of lot-sizing rule selection on the selection of MPS freezing parameters under rolling time horizons under deterministic demand. A model is built to simulate the Master Production Scheduling and Material Requirements Planning operations in a make-to-order environment. The results show that the selection of lot-sizing rules significantly influences the selection of MPS freezing parameters.

[1]  R. C. Carlson,et al.  Less Nervous MRP Systems: A Dynamic Economic Lot-Sizing Approach , 1979 .

[2]  Urban Wemmerlöv,et al.  Lot-sizing under uncertainty in a rolling schedule environment , 1984 .

[3]  H Mather,et al.  Reschedule the reschedules you just rescheduled - Way of life for MRP? , 1977 .

[4]  Dean H. Kropp,et al.  A Lot-Sizing Algorithm for Reducing Nervousness in MRP Systems , 1984 .

[5]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Demand Uncertainty , 1990 .

[6]  Dean H. Kropp,et al.  HEURISTIC LOT‐SIZING APPROACHES FOR DEALING WITH MRP SYSTEM NERVOUSNESS , 1983 .

[7]  Gerard M. Campbell Master Production Scheduling Under Rolling Planning Horizons with Fixed Order Intervals , 1992 .

[8]  Joseph D. Blackburn,et al.  HEURISTIC LOT‐SIZING PERFORMANCE IN A ROLLING‐SCHEDULE ENVIRONMENT* , 1980 .

[9]  Dean H. Kropp,et al.  THE EFFECTIVENESS OF EXTENDING THE HORIZON IN ROLLING PRODUCTION SCHEDULING , 1982 .

[10]  Dean H. Kropp,et al.  MRP system nervousness: Causes and cures , 1985 .

[11]  Roberta J Minifie,et al.  Survey of MRP nervousness issues , 1986 .

[12]  Kenneth R. Baker,et al.  AN EXPERIMENTAL STUDY OF THE EFFECTIVENESS OF ROLLING SCHEDULES IN PRODUCTION PLANNING , 1977 .

[13]  Xiande Zhao,et al.  Lot-sizing rules and freezing the master production schedule in material requirements planning systems under demand uncertainty , 1995 .

[14]  Xiande Zhao,et al.  Freezing the master production schedule in multilevel material requirements planning systems under deterministic demand , 1996 .

[15]  Dean H. Kropp,et al.  A comparison of strategies to dampen nervousness in MRP systems , 1986 .

[16]  Neng-Pai Lin,et al.  A Model for Master Production Scheduling in Uncertain Environments , 1992 .

[17]  William L. Berry,et al.  MEASURING MASTER PRODUCTION SCHEDULE STABILITY UNDER ROLLING PLANNING HORIZONS , 1988 .

[18]  Joseph D. Blackburn,et al.  Improved heuristics for multistage requirements planning systems , 1982 .

[19]  Joseph A. Orlicky,et al.  Material Requirements Planning: The New Way of Life in Production and Inventory Management , 1975 .

[20]  V. Sridharan,et al.  Freezing the Master Production Schedule Under Rolling Planning Horizons , 1987 .