Risk Analysis of Completion and Production Systems
暂无分享,去创建一个
[1] A. F. Veneruso,et al. Towards Truly Permanent Intelligent Completions: Lifelong System Survivability Through a Structured Reliability Assurance Process , 2003 .
[2] Antonio Borri,et al. Strengthening of Historic Masonry Structures with Composite Materials , 2015 .
[3] S Miguel Torrealba,et al. A Software Tool to support Risks Analysis about what Should or Should Not go to the Cloud , 2013 .
[4] Tero Päivärinta,et al. Genre-Based Approach to Assessing Information and Knowledge Security Risks , 2014, Int. J. Knowl. Manag..
[5] Stefano Lenci,et al. On the Assessment of the Seismic Vulnerability of Ancient Churches: The Case of “San Francesco ad Alto” in Ancona (Italy) , 2015 .
[6] L. S. Al-Samarraie,et al. An Integrated Approach To Well Integrity Evaluation Via Reliability Assessment Of Well Integrity Tools And Methods: Results From Dukhan Field, Qatar , 2012 .
[7] Endre Willmann,et al. Application of Reliability Analysis Techniques to Intelligent Wells , 2001 .
[8] Ekwere J. Peters,et al. Influence of Compound Grease on the Performance of Premium Connections , 1990 .
[9] Amin Mohebkhah,et al. Numerical Modeling of Historic Masonry Structures , 2015 .
[10] A. Shafaghi. Equipment failure rate updating-Bayesian estimation. , 2008, Journal of hazardous materials.
[11] B. Stahl,et al. Design Methodology for Offshore Platform Conductors , 1983 .
[12] I. Mamaghani. Application of Discrete Finite Element Method for Analysis of Unreinforced Masonry Structures , 2016 .
[13] Simon Dean,et al. Blowout Risk Analysis of Gas-Lift Completions , 1992 .
[14] Alexander. Koutamanis,et al. Computer-Mediated Briefing for Architects , 2013 .
[15] J. L. Thorogood,et al. Casing System Risk Analysis Using Structural Reliability , 1993 .
[16] J. R. Roche,et al. System Safety Analysis Of Well Control Equipment , 1993 .
[17] L. D. Patton,et al. Well completion and workover. Part 3. Selecting the best well completion , 1979 .
[18] C. Baumgarte,et al. A Soil Mechanics Approach To Predict Cement Sheath Behavior , 1998 .
[19] L. B. Hilbert,et al. Evaluation of Premium Threaded Connections Using Finite-Element Analysis and Full-Scale Testing , 1992 .
[20] Alfred Strauss,et al. Lifecycle Assessment of Structures and Probabilistic Performance Approaches , 2015 .
[21] John Rogers,et al. Reliability Assurance, Managing The Growth Of Intelligent Completion Technology , 2003 .
[22] D. R. Davies,et al. Sand Production Prediction Review: Developing an Integrated Approach , 1991 .
[23] Albert R. McSpadden,et al. Analysis of Complex Wellhead Load Events for Conductor and Surface Casing Strings , 2009 .
[24] K. J. Goodwin,et al. Cement Sheath Stress Failure , 1992 .
[25] Paloma Pineda. Ancient Materials and Singular Constructions: Numerical, Experimental, and Heritage Strategies to Preserve Masonry Structures in Seismic Areas , 2015 .
[26] Axel-Pierre Bois,et al. Use of a Mechanistic Model To Forecast Cement-Sheath Integrity , 2012 .
[27] G. V. Uma,et al. ONTO-KMS-TEC: An Ontology-Based Knowledge Management Framework to Teach Engineering Courses , 2015 .
[28] Michael J. Jellison,et al. A Service-Life Model for Casing Strings , 1983 .
[29] Julio Flórez-López,et al. Fracture and Damage Mechanics for Structural Engineering of Frames: State-of-the-Art Industrial Applications , 2014 .
[30] David D. Grassick,et al. Risk Analysis of Single- and Dual-String Gas-Lift Completions , 1990 .
[31] Veronique Barlet-Gouedard,et al. Mitigation strategies for the risk of CO2 migration through wellbores , 2006 .
[32] Brock Williams,et al. Adopting Reliability Practices from the Space Industry into Intelligent Wells , 2001 .
[33] Edwin Forero,et al. Development of a System for Detecting Weld Failures , 2015 .
[34] Panagiotis G. Asteris,et al. Handbook of Research on Seismic Assessment and Rehabilitation of Historic Structures , 2015 .
[35] Stephane Hiron,et al. Reliability Qualification Testing for Permanently Installed Wellbore Equipment , 2000 .
[36] P. B. Jackson,et al. Effect of Casing Pressure on Gas Flow Through a Sheath of Set Cement , 1993 .
[37] Jaedong Lee,et al. A Well-Centric Approach to Closing the Production Optimization Loop , 2006 .
[38] J. M. Busch,et al. Subsurface safety valves: safety asset or safety liability , 1983 .
[39] C. Teodoriu,et al. Investigations on Casing-Cement interaction with application to Gas and CO2 Storage Wells , 2010 .
[40] M. L. Payne,et al. Tubular Design Optimization For Arco China's Yacheng 13-1 Development , 1995 .
[41] Mike Payne,et al. Application of probabilistic reliability methods to tubular designs , 1990 .