Modeling risk based maintenance using fuzzy analytic network process
暂无分享,去创建一个
[1] W. J. Moore,et al. An intelligent maintenance system for continuous cost-based prioritisation of maintenance activities , 2006, Comput. Ind..
[2] Madan G. Singh,et al. Fuzzy analytic network process and its application to the development of decision support systems , 2003, IEEE Trans. Syst. Man Cybern. Part C.
[3] J. Moubray. Reliability-Centered Maintenance , 1991 .
[4] F. Partovi. An analytic model to quantify strategic service vision , 2001 .
[5] T. Saaty. Fundamentals of Decision Making and Priority Theory With the Analytic Hierarchy Process , 2000 .
[6] Jonathan S. Tan. A quantitative approach for continuous improvement in process safety and reliability , 1995 .
[7] Faisal Khan,et al. Risk-based maintenance (RBM): a quantitative approach for maintenance/inspection scheduling and planning , 2003 .
[8] N. S. Arunraj,et al. Risk-based maintenance policy selection using AHP and goal programming. , 2010 .
[9] Gerald M. Knapp,et al. Determining the most important criteria in maintenance decision making , 1997 .
[10] A. T. de Almeida,et al. Decision theory in maintenance decision making , 1995 .
[11] Mustafa Yurdakul,et al. Measuring long-term performance of a manufacturing firm using the Analytic Network Process (ANP) approach , 2003 .
[12] Albert H. C. Tsang,et al. Condition-based maintenance: tools and decision making , 1995 .
[13] D. Chang. Applications of the extent analysis method on fuzzy AHP , 1996 .
[14] Wen Lea Pearn,et al. Product Mix Optimization for Semiconductor Manufacturing Based on AHP and ANP Analysis , 2005 .
[15] J Maiti,et al. Risk-based maintenance--techniques and applications. , 2007, Journal of hazardous materials.
[16] S. K. Yang,et al. A condition-based failure-prediction and processing-scheme for preventive maintenance , 2003, IEEE Trans. Reliab..
[17] Marcello Braglia,et al. The analytic hierarchy process applied to maintenance strategy selection , 2000, Reliab. Eng. Syst. Saf..
[18] Wei-Wen Wu,et al. Selecting knowledge management strategies by using the analytic network process , 2007, Expert Syst. Appl..
[19] Faisal I Khan,et al. Risk-based maintenance of ethylene oxide production facilities. , 2004, Journal of hazardous materials.
[20] Cengiz Kahraman,et al. Multi-attribute comparison of catering service companies using fuzzy AHP: The case of Turkey , 2004 .
[21] Maurizio Bevilacqua,et al. A combined goal programming - AHP approach to maintenance selection problem , 2006, Reliab. Eng. Syst. Saf..
[22] Fariborz Y. Partovi,et al. An analytic model for locating facilities strategically , 2006 .
[23] Basim Al-Najjar,et al. Selecting the most efficient maintenance approach using fuzzy multiple criteria decision making , 2003 .
[24] Gülçin Büyüközkan,et al. A fuzzy optimization model for QFD planning process using analytic network approach , 2006, Eur. J. Oper. Res..
[25] Jesús Carretero,et al. Applying RCM in large scale systems: a case study with railway networks , 2003, Reliab. Eng. Syst. Saf..
[26] J. Buckley,et al. Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).
[27] Sevin Sozer,et al. Product planning in quality function deployment using a combined analytic network process and goal programming approach , 2003 .
[28] Thomas L. Saaty,et al. Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .
[29] Iain Le May,et al. Risk-Based Hazardous Release Protection and Prevention by Inspection and Maintenance , 2000 .
[30] Wen Lea Pearn,et al. Analytic network process (ANP) approach for product mix planning in semiconductor fabricator , 2005 .
[31] W. Pedrycz,et al. A fuzzy extension of Saaty's priority theory , 1983 .
[32] C G Vassiliadis,et al. Maintenance-based strategies for environmental risk minimization in the process industries. , 2000, Journal of hazardous materials.
[33] S. Luce,et al. Choice criteria in conditional preventive maintenance , 1999 .
[34] Ali Fuat Guneri,et al. A fuzzy ANP approach to shipyard location selection , 2009, Expert Syst. Appl..
[35] Adrien Presley,et al. R&D project selection using the analytic network process , 2002, IEEE Trans. Engineering Management.