Development of a maintenance performance measurement framework—using the analytic network process (ANP) for maintenance performance indicator selection

Abstract The competitiveness and performance of manufacturing companies depend on the availability, reliability and productivity of their production equipment. This recognition has led to a drastic change of perception on maintenance over the past decades, evolving from a “necessary evil” to a “value adding” activity. In order to ensure a good performance of the production plant, maintenance managers need a good overview of maintenance processes and achievements. This can be attained by a rigorously defined maintenance performance measurement (MPM) system and maintenance performance indicators (MPI). Many performance measurement frameworks and indicators are presented in literature; however some major issues remain unresolved. Many papers discuss the development of generic maintenance performance frameworks and corresponding indicators; however none of the publications considers the selection of relevant MPI for a specific business context and consequently in relation with the company's maintenance objectives. Moreover, the link with the manufacturing and corporate strategy should be established in order to establish an MPM system useable throughout the entire company. In this way, maintenance performance measurement should be defined on all management levels (i.e. strategic, tactical and operational). To overcome these problems, the objective of this paper is to develop an MPM framework that aligns the maintenance objectives on all management levels with the relevant MPI used. In order to assist the maintenance manager on selection of the relevant MPI, an analytic network process (ANP) model and methodology is presented which is based on the designed MPM framework. The methodology is applied to several case studies considering companies from different types of industry. The results illustrate the applicability and capability of the presented MPM framework and ANP model to assist maintenance managers in the definition and selection of MPI in line with the maintenance and corporate objectives and strategy. The ANP approach enables the decision maker to better understand the complex relationships in the decision problem, which improves the reliability of the corresponding decisions.

[1]  Joseph H. Saleh,et al.  Beyond its cost, the value of maintenance: An analytical framework for capturing its net present value , 2009, Reliab. Eng. Syst. Saf..

[2]  Dan M. Frangopol,et al.  Multiobjective Maintenance Planning Optimization for Deteriorating Bridges Considering Condition, Safety, and Life-Cycle Cost , 2005 .

[3]  Basim Al-Najjar,et al.  The lack of maintenance and not maintenance which costs: A model to describe and quantify the impact of vibration-based maintenance on company's business , 2007 .

[4]  R. Kaplan,et al.  Transforming the Balanced Scorecard from Performance Measurement to Strategic Management: Part II , 2001 .

[5]  Philip A. Scarf,et al.  On the application of mathematical models in maintenance , 1997 .

[6]  Ernest H. Forman,et al.  Group decision support with the Analytic Hierarchy Process , 1992, Decis. Support Syst..

[7]  Rommert Dekker,et al.  Applications of maintenance optimization models : a review and analysis , 1996 .

[8]  José Telhada,et al.  Maintenance decision making , 2012 .

[9]  J. Barzilai Deriving weights from pairwise comparison matrices , 1997 .

[10]  Andrej Atrens,et al.  Strategic maintenance management , 2002 .

[11]  Zahir Irani,et al.  A framework for managing maintenance using performance measurement systems , 2001 .

[12]  Peter Muchiri,et al.  Maintenance optimization models and criteria , 2010, Int. J. Syst. Assur. Eng. Manag..

[13]  Liliane Pintelon,et al.  Empirical analysis of maintenance performance measurement in Belgian industries , 2010 .

[14]  T. Saaty How to Make a Decision: The Analytic Hierarchy Process , 1990 .

[15]  Ravi Shankar,et al.  Selection of logistics service provider: An analytic network process (ANP) approach , 2007 .

[16]  S S Stevens,et al.  On the Theory of Scales of Measurement. , 1946, Science.

[17]  Sofía Carlos,et al.  Simultaneous and multi-criteria optimization of TS requirements and maintenance at NPPs , 2002 .

[18]  Uday Kumar,et al.  Maintenance performance measurement (MPM): issues and challenges , 2006 .

[19]  J. Fichtner On deriving priority vectors from matrices of pairwise comparisons , 1986 .

[20]  Semra Tunali,et al.  Joint optimization of spare parts inventory and maintenance policies using genetic algorithms , 2007 .

[21]  Fariborz Y. Partovi,et al.  An analytic model for locating facilities strategically , 2006 .

[22]  Andy Neely,et al.  Implementing performance measurement systems: a literature review , 2003 .

[23]  U. Kumar Development and Implementation of Maintenance Performance Measurement System: Issues and Challenges , 2006 .

[24]  Adolfo Crespo Márquez,et al.  Contemporary maintenance management: process, framework and supporting pillars , 2006 .

[25]  L. Swanson Linking maintenance strategies to performance , 2001 .

[26]  Ludo Gelders,et al.  Development of maintenance function performance measurement framework and indicators , 2011 .

[27]  Ana Sánchez,et al.  RAMS+C informed decision-making with application to multi-objective optimization of technical specifications and maintenance using genetic algorithms , 2005, Reliab. Eng. Syst. Saf..

[28]  Aditya Parida,et al.  Development of a multi‐criteria hierarchical framework for maintenance performance measurement (MPM) , 2007 .

[29]  G. D. Silveira,et al.  Exploring the trade‐off concept , 2001 .

[30]  Mahmoud M. Yasin,et al.  A literature review of maintenance performance measurement: A conceptual framework and directions for future research , 2011 .

[31]  Liliane Pintelon,et al.  A maintenance management tool , 1990 .

[32]  C. Zopounidis,et al.  Strategic performance measurement in a healthcare organisation: A multiple criteria approach based on balanced scorecard , 2012 .

[33]  Garrison W. Greenwood,et al.  Searching for multiobjective preventive maintenance schedules: Combining preferences with evolutionary algorithms , 2007, Eur. J. Oper. Res..

[34]  Raúl Rodríguez-Rodríguez,et al.  A multi-criteria approach for managing inter-enterprise collaborative relationships , 2012 .

[35]  J. Moubray Reliability-Centered Maintenance , 1991 .

[36]  T. Saaty,et al.  Ranking by Eigenvector Versus Other Methods in the Analytic Hierarchy Process , 1998 .

[37]  Dan M. Frangopol,et al.  Optimization of lifetime maintenance strategies for deteriorating structures considering probabilities of violating safety, condition, and cost thresholds , 2006 .

[38]  A. K. S. Jardine,et al.  Maintenance, Replacement, and Reliability , 2021 .

[39]  Thomas L. Saaty,et al.  Decision making with dependence and feedback : the analytic network process : the organization and prioritization of complexity , 1996 .