Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated

This paper addresses the m-machine no-wait flowshop problem where the set-up time of a job is separated from its processing time. The performance measures considered are the total flowtime and makespan. The scheduling problem for makespan reduces to the travelling salesman problem (TSP), and the scheduling problem for total flowtime reduces to the time-dependent travelling salesman problem (TDTSP). Non-polynomial time solution methods are presented, along with a polynomial heuristic.

[1]  Keld Helsgaun,et al.  An effective implementation of the Lin-Kernighan traveling salesman heuristic , 2000, Eur. J. Oper. Res..

[2]  E. Lawler,et al.  Erratum: The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization , 1986 .

[3]  J Bentner,et al.  Optimization of the time-dependent traveling salesman problem with Monte Carlo methods. , 2001, Physical review. E, Statistical, nonlinear, and soft matter physics.

[4]  S. M. Johnson,et al.  Optimal two- and three-stage production schedules with setup times included , 1954 .

[5]  E.L. Lawler,et al.  Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .

[6]  Stephen C. Graves,et al.  Technical Note - An n-Constraint Formulation of the (Time-Dependent) Traveling Salesman Problem , 1980, Oper. Res..

[7]  Vitaly A. Strusevich,et al.  On non-permutation solutions to some two machine flow shop scheduling problems , 1994, Math. Methods Oper. Res..

[8]  Hans Röck,et al.  The Three-Machine No-Wait Flow Shop is NP-Complete , 1984, JACM.

[9]  Brian W. Kernighan,et al.  An Effective Heuristic Algorithm for the Traveling-Salesman Problem , 1973, Oper. Res..

[10]  George L. Nemhauser,et al.  Handbooks in operations research and management science , 1989 .

[11]  Ali Allahverdi,et al.  Total flowtime in no-wait flowshops with separated setup times , 1998, Comput. Oper. Res..

[12]  R. Gomory,et al.  Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .

[13]  Teofilo F. Gonzalez,et al.  Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..

[14]  J. Piehler,et al.  Ein Beitrag zum Reihenfolgeproblem , 1960, Unternehmensforschung.

[15]  N. Biggs THE TRAVELING SALESMAN PROBLEM A Guided Tour of Combinatorial Optimization , 1986 .

[16]  Christos H. Papadimitriou,et al.  Flowshop scheduling with limited temporary storage , 1980, JACM.

[17]  Katsundo Hitomi,et al.  Optimal Two-Stage Production Scheduling with Setup Times Separated , 1979 .

[18]  Ali Allahverdi,et al.  Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times , 2000, Comput. Oper. Res..

[19]  Jatinder N. D. Gupta,et al.  A review of scheduling research involving setup considerations , 1999 .

[20]  Chelliah Sriskandarajah,et al.  A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..

[21]  Eugene L. Lawler,et al.  Sequencing and scheduling: algorithms and complexity , 1989 .