Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated
暂无分享,去创建一个
[1] Keld Helsgaun,et al. An effective implementation of the Lin-Kernighan traveling salesman heuristic , 2000, Eur. J. Oper. Res..
[2] E. Lawler,et al. Erratum: The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization , 1986 .
[3] J Bentner,et al. Optimization of the time-dependent traveling salesman problem with Monte Carlo methods. , 2001, Physical review. E, Statistical, nonlinear, and soft matter physics.
[4] S. M. Johnson,et al. Optimal two- and three-stage production schedules with setup times included , 1954 .
[5] E.L. Lawler,et al. Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey , 1977 .
[6] Stephen C. Graves,et al. Technical Note - An n-Constraint Formulation of the (Time-Dependent) Traveling Salesman Problem , 1980, Oper. Res..
[7] Vitaly A. Strusevich,et al. On non-permutation solutions to some two machine flow shop scheduling problems , 1994, Math. Methods Oper. Res..
[8] Hans Röck,et al. The Three-Machine No-Wait Flow Shop is NP-Complete , 1984, JACM.
[9] Brian W. Kernighan,et al. An Effective Heuristic Algorithm for the Traveling-Salesman Problem , 1973, Oper. Res..
[10] George L. Nemhauser,et al. Handbooks in operations research and management science , 1989 .
[11] Ali Allahverdi,et al. Total flowtime in no-wait flowshops with separated setup times , 1998, Comput. Oper. Res..
[12] R. Gomory,et al. Sequencing a One State-Variable Machine: A Solvable Case of the Traveling Salesman Problem , 1964 .
[13] Teofilo F. Gonzalez,et al. Flowshop and Jobshop Schedules: Complexity and Approximation , 1978, Oper. Res..
[14] J. Piehler,et al. Ein Beitrag zum Reihenfolgeproblem , 1960, Unternehmensforschung.
[15] N. Biggs. THE TRAVELING SALESMAN PROBLEM A Guided Tour of Combinatorial Optimization , 1986 .
[16] Christos H. Papadimitriou,et al. Flowshop scheduling with limited temporary storage , 1980, JACM.
[17] Katsundo Hitomi,et al. Optimal Two-Stage Production Scheduling with Setup Times Separated , 1979 .
[18] Ali Allahverdi,et al. Minimizing mean flowtime in a two-machine flowshop with sequence-independent setup times , 2000, Comput. Oper. Res..
[19] Jatinder N. D. Gupta,et al. A review of scheduling research involving setup considerations , 1999 .
[20] Chelliah Sriskandarajah,et al. A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process , 1996, Oper. Res..
[21] Eugene L. Lawler,et al. Sequencing and scheduling: algorithms and complexity , 1989 .