Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information
暂无分享,去创建一个
[1] R. Güllü. On the value of information in dynamic production/inventory problems under forecast evolution , 1996 .
[2] Lawrence M. Wein,et al. Optimal Control of a Two-Station Tandem Production/Inventory System , 1994, Oper. Res..
[3] Fangruo Chen,et al. Market Segmentation, Advanced Demand Information, and Supply Chain Performance , 2000, Manuf. Serv. Oper. Manag..
[4] Yves Dallery,et al. The Value of Advance Demand Information in Production/Inventory Systems , 2004, Ann. Oper. Res..
[5] Yves Dallery,et al. Extended kanban control system: combining kanban and base stock , 2000 .
[6] John A. Buzacott,et al. Stochastic models of manufacturing systems , 1993 .
[7] Lawrence M. Wein,et al. Setting base stock levels using product-form queueing networks , 1996 .
[8] J. A. Buzacott,et al. Queueing models of Kanban and MRP controlled production systems , 1989 .
[9] Yves Dallery,et al. A unified framework for pull control mechanisms in multi‐stage manufacturing systems , 2000, Ann. Oper. Res..
[10] Yves Dallery,et al. Comparative modelling of multi-stage production-inventory control policies with lot sizing , 2003 .
[11] Yves Dallery,et al. Production/Inventory Control with Advance Demand Information , 2003 .
[12] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[13] Özalp Özer,et al. Integrating Replenishment Decisions with Advance Demand Information , 2001, Manag. Sci..
[14] Yves Dallery,et al. Integrating advance order information in make-to-stock production systems , 2002 .
[15] Paul H. Zipkin,et al. Customer-order information, leadtimes, and inventories , 1995 .
[16] G. F. Newell,et al. A relation between stationary queue and waiting time distributions , 1971, Journal of Applied Probability.
[17] Vijay S. Mookerjee,et al. Purchasing demand information in a stochastic-demand inventory system , 1997 .
[18] Refik Gll,et al. On the value of information in dynamic production/inventory problems under forecast evolution , 1996 .
[19] Yves Dallery,et al. A performance comparison of pull type control mechanisms for multi-stage manufacturing , 2000 .
[20] J. George Shanthikumar,et al. Stochastic modeling and optimization of manufacturing systems and supply chains , 2003 .
[21] John A. Buzacott,et al. Safety stock versus safety time in MRP controlled production systems , 1994 .
[22] J. Wijngaard,et al. The effect of foreknowledge of demand in case of a restricted capacity: The single-stage, single-product case , 2004, Eur. J. Oper. Res..
[23] Mark L. Spearman,et al. Customer Service in Pull Production Systems , 1992, Oper. Res..
[24] Maria Di Mascolo,et al. On the design of generalized kanban control systems , 1995 .
[25] George Liberopoulos,et al. Unified Modelling Framework of Multi-Stage Production-Inventory Control Policies with Lot Sizing and Advance Demand Information , 2003 .
[26] Yves Dallery,et al. An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems , 1996, Oper. Res..
[27] Stephen M. Gilbert,et al. Supply chain benefits from advanced customer commitments , 1999 .
[28] Asbjoern M. Bonvik,et al. A comparison of production-line control mechanisms , 1997 .
[29] Paul R. Milgrom,et al. Communication and Inventory as Substitutes in Organizing Production , 1988 .
[30] Marc Wouters,et al. The use of advance demand information in a project-based supply chain , 2001, Eur. J. Oper. Res..
[31] G. Liberopoulos,et al. Base stock versus WIP cap in single-stage make-to-stock production–inventory systems , 2002 .
[32] Christos H. Papadimitriou,et al. On the Value of Information , 1996 .
[33] David L. Woodruff,et al. CONWIP: a pull alternative to kanban , 1990 .
[34] David F. Pyke,et al. Exploiting timely demand information to reduce inventories , 1996 .
[35] Yannick Frein,et al. Comparison among three pull control policies: kanban, base stock, and generalized kanban , 2000, Ann. Oper. Res..