Tradeoffs between base stock levels, numbers of kanbans, and planned supply lead times in production/inventory systems with advance demand information

Abstract We numerically investigate tradeoffs between near-optimal base stock levels, numbers of kanbans, and planned supply lead times in base stock policies and hybrid base stock/kanban policies with advance demand information used for the control of multi-stage production/inventory systems. We report simulation-based computational experience regarding such tradeoffs and the managerial insights behind them for single-stage and two-stage production/inventory systems.

[1]  R. Güllü On the value of information in dynamic production/inventory problems under forecast evolution , 1996 .

[2]  Lawrence M. Wein,et al.  Optimal Control of a Two-Station Tandem Production/Inventory System , 1994, Oper. Res..

[3]  Fangruo Chen,et al.  Market Segmentation, Advanced Demand Information, and Supply Chain Performance , 2000, Manuf. Serv. Oper. Manag..

[4]  Yves Dallery,et al.  The Value of Advance Demand Information in Production/Inventory Systems , 2004, Ann. Oper. Res..

[5]  Yves Dallery,et al.  Extended kanban control system: combining kanban and base stock , 2000 .

[6]  John A. Buzacott,et al.  Stochastic models of manufacturing systems , 1993 .

[7]  Lawrence M. Wein,et al.  Setting base stock levels using product-form queueing networks , 1996 .

[8]  J. A. Buzacott,et al.  Queueing models of Kanban and MRP controlled production systems , 1989 .

[9]  Yves Dallery,et al.  A unified framework for pull control mechanisms in multi‐stage manufacturing systems , 2000, Ann. Oper. Res..

[10]  Yves Dallery,et al.  Comparative modelling of multi-stage production-inventory control policies with lot sizing , 2003 .

[11]  Yves Dallery,et al.  Production/Inventory Control with Advance Demand Information , 2003 .

[12]  Paul H. Zipkin,et al.  Foundations of Inventory Management , 2000 .

[13]  Özalp Özer,et al.  Integrating Replenishment Decisions with Advance Demand Information , 2001, Manag. Sci..

[14]  Yves Dallery,et al.  Integrating advance order information in make-to-stock production systems , 2002 .

[15]  Paul H. Zipkin,et al.  Customer-order information, leadtimes, and inventories , 1995 .

[16]  G. F. Newell,et al.  A relation between stationary queue and waiting time distributions , 1971, Journal of Applied Probability.

[17]  Vijay S. Mookerjee,et al.  Purchasing demand information in a stochastic-demand inventory system , 1997 .

[18]  Refik Gll,et al.  On the value of information in dynamic production/inventory problems under forecast evolution , 1996 .

[19]  Yves Dallery,et al.  A performance comparison of pull type control mechanisms for multi-stage manufacturing , 2000 .

[20]  J. George Shanthikumar,et al.  Stochastic modeling and optimization of manufacturing systems and supply chains , 2003 .

[21]  John A. Buzacott,et al.  Safety stock versus safety time in MRP controlled production systems , 1994 .

[22]  J. Wijngaard,et al.  The effect of foreknowledge of demand in case of a restricted capacity: The single-stage, single-product case , 2004, Eur. J. Oper. Res..

[23]  Mark L. Spearman,et al.  Customer Service in Pull Production Systems , 1992, Oper. Res..

[24]  Maria Di Mascolo,et al.  On the design of generalized kanban control systems , 1995 .

[25]  George Liberopoulos,et al.  Unified Modelling Framework of Multi-Stage Production-Inventory Control Policies with Lot Sizing and Advance Demand Information , 2003 .

[26]  Yves Dallery,et al.  An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems , 1996, Oper. Res..

[27]  Stephen M. Gilbert,et al.  Supply chain benefits from advanced customer commitments , 1999 .

[28]  Asbjoern M. Bonvik,et al.  A comparison of production-line control mechanisms , 1997 .

[29]  Paul R. Milgrom,et al.  Communication and Inventory as Substitutes in Organizing Production , 1988 .

[30]  Marc Wouters,et al.  The use of advance demand information in a project-based supply chain , 2001, Eur. J. Oper. Res..

[31]  G. Liberopoulos,et al.  Base stock versus WIP cap in single-stage make-to-stock production–inventory systems , 2002 .

[32]  Christos H. Papadimitriou,et al.  On the Value of Information , 1996 .

[33]  David L. Woodruff,et al.  CONWIP: a pull alternative to kanban , 1990 .

[34]  David F. Pyke,et al.  Exploiting timely demand information to reduce inventories , 1996 .

[35]  Yannick Frein,et al.  Comparison among three pull control policies: kanban, base stock, and generalized kanban , 2000, Ann. Oper. Res..