Spatial-temporal hedging coordination in prefabricated housing production

Abstract This paper studies the spatial-temporal hedging coordination problem. In the prefabricated housing production, the heavy double handling cost is the major reason that causes profit loss of project manager. The spatial-temporal method is capable of mitigating this double handling cost by reducing assembly time uncertainty and on-site congestion probability substantially. However, adopting hedging methods adds extra cost and pressure to the adopters. To encourage the building contractor who makes the temporal hedging decision to choose a larger assembly time hedging (ATH) amount, a hedging effort-sharing (HES) mechanism is proposed. In this research, we built an analytical model to investigate how HES mechanism affects spatial-temporal hedging decisions, the performance of the building contractor, project manager as well as the whole supply chain. Three scenarios with fixed HES terms under decentralized setting are examined: (I) Nash model, (II) Building contractor led Stackelberg model, and (III) Project manager led Stackelberg model. Closed-form results regarding the optimal spatial-temporal hedging decisions are obtained. Besides, we derive the threshold of the HES terms, under which a win-win coordination can be achieved. Furthermore, an integrated setting with negotiable HES terms is explored. We derive the optimal values of HES terms, which incents the individual optimal spatial-temporal hedging decisions identical with that obtained in the centralized setting. By conducting numerical studies, it is found that a higher site congestion probability and a lower demand uncertainty encourage the project manager to share more ATH effort, while a lower unit ATH cost and higher site space hedging effort-sharing rate entice the building contractor to burden more ATH effort. Surprisingly, in the proposed HES mechanism, the building contractor's profit is increasing in site congestion probability and the project manager's profit increases in the demand uncertainty.

[1]  George Q. Huang,et al.  Buffer space hedging and coordination in prefabricated construction supply chain management , 2018, International Journal of Production Economics.

[2]  Xu Chen,et al.  Channel coordination through subsidy contract design in the mobile phone industry , 2016 .

[3]  Bin Shen,et al.  Service supply chain management: A review of operational models , 2015, Eur. J. Oper. Res..

[4]  Christophe Bérenguer,et al.  Optimal Buffer Inventory and Opportunistic Preventive Maintenance Under Random Production Capacity Availability , 2008 .

[5]  Jennifer Shang,et al.  Contract design for two-stage supply chain coordination: Integrating manufacturer-quality and retailer-marketing efforts , 2013 .

[6]  G. D. Eppen Note---Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem , 1979 .

[7]  Yongpei Guan,et al.  Production , Manufacturing and Logistics Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games , 2010 .

[8]  H. V. Landeghem,et al.  Robust planning: a new paradigm for demand chain planning , 2002 .

[9]  T. Cheng,et al.  Joint supply chain risk management: An agency and collaboration perspective , 2015 .

[10]  Ray Y. Zhong,et al.  Production lead-time hedging and coordination in prefabricated construction supply chain management , 2017, Int. J. Prod. Res..

[11]  Noor Amila Wan Abdullah Zawawi,et al.  Coordination process in construction projects management , 2016 .

[12]  Tsan-Ming Choi,et al.  Coordinating supply chains with stochastic demand by crashing lead times , 2016, Comput. Oper. Res..

[13]  Low Sui Pheng,et al.  Just‐in‐time management in precast concrete construction: a survey of the readiness of main contractors in Singapore , 2001 .

[14]  Tsan-Ming Choi,et al.  Launching the right new product among multiple product candidates in fashion: Optimal choice and coordination with risk consideration , 2018, International Journal of Production Economics.

[15]  Geoffrey Qiping Shen,et al.  Critical review of the research on the management of prefabricated construction , 2014 .

[16]  Yao Zhao,et al.  Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects , 2016, Ann. Oper. Res..

[17]  Llewellyn Tang,et al.  Simulating Construction Duration for Multistory Buildings with Controlling Activities , 2013 .

[18]  Tsan-Ming Choi,et al.  Impacts of lead time reduction on fabric sourcing in apparel production with yield and environmental considerations , 2020, Ann. Oper. Res..

[19]  Ray Y. Zhong,et al.  Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction , 2017 .

[20]  Gérard P. Cachon Supply Chain Coordination with Contracts , 2003, Supply Chain Management.

[21]  Kannan Govindan,et al.  The Impact of Contractual Governance and Trust on EPC Projects in Construction Supply Chain Performance , 2015 .

[22]  Paijit Pawan,et al.  A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects , 2016 .

[23]  G. Shen,et al.  Stakeholder management studies in mega construction projects: A review and future directions , 2015 .

[24]  Alvin W. Drake,et al.  Fundamentals of Applied Probability Theory , 1967 .

[25]  George Q. Huang,et al.  Operational Hedging and Coordination in Prefabrication Construction Industry , 2017 .

[26]  R. J. Tersine Principles of inventory and materials management , 1982 .

[27]  Albert P.C. Chan,et al.  Critical Analysis of Partnering Research Trend in Construction Journals , 2012 .

[28]  Geoffrey Qiping Shen,et al.  An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction , 2018 .

[29]  Yue Zhai,et al.  Operational hedging and coordination for prefabricated construction supply chain management , 2017 .

[30]  Z. K. Weng,et al.  THE DESIGN OF A JIT SUPPLY CHAIN: THE EFFECT OF LEADTIME UNCERTAINTY ON SAFETY STOCK , 1999 .

[31]  Bon-Gang Hwang,et al.  Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore , 2017 .

[32]  George Q. Huang,et al.  Multi-period hedging and coordination in a prefabricated construction supply chain , 2019 .

[33]  Geoffrey Qiping Shen,et al.  Barriers to promoting prefabricated construction in China : a cost-benefit analysis , 2018 .

[34]  Jafar Heydari,et al.  Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination , 2014 .

[35]  Tsan-Ming Choi,et al.  Online-offline fashion franchising supply chains without channel conflicts: Choices on postponement and contracts , 2017, International Journal of Production Economics.

[36]  Graham K. Rand,et al.  Decision Systems for Inventory Management and Production Planning , 1979 .

[37]  Amanda J. Schmitt,et al.  A Quantitative Analysis of Disruption Risk in a Multi-Echelon Supply Chain , 2011 .

[38]  Low Sui Pheng Project Life Cycles, Stakeholders and Organizations , 2018 .

[39]  George Q. Huang,et al.  Towards operational hedging for logistics uncertainty management in prefabrication construction , 2015 .

[40]  Gabriel A. Barraza,et al.  Probabilistic Control of Project Performance Using Control Limit Curves , 2007 .

[41]  Davide Aloini,et al.  Key antecedents and practices for Supply Chain Management adoption in project contexts , 2015 .

[42]  Stuart X. Zhu,et al.  Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain , 2015 .

[43]  Mani Poshdar,et al.  Characterization of Process Variability in Construction , 2014 .

[44]  Alexandre Dolgui,et al.  Optimization of multi-period supply planning under stochastic lead times and a dynamic demand , 2019, International Journal of Production Economics.

[45]  Panos Kouvelis,et al.  Supply Chain Management Research and Production and Operations Management: Review, Trends, and Opportunities , 2006 .

[46]  Margaret K.Y. Mok,et al.  Schedule risks in prefabrication housing production in Hong Kong: a social network analysis , 2016 .

[47]  Weisheng Lu,et al.  An Internet of Things-enabled BIM platform for modular integrated construction: A case study in Hong Kong , 2019, Adv. Eng. Informatics.

[48]  Yuan Fang,et al.  Enhancing the logistics of construction materials through activity‐based simulation approach , 2009 .

[49]  Alexandre Dolgui,et al.  Supply planning under uncertainties in MRP environments: A state of the art , 2007, Annu. Rev. Control..

[50]  Christoph H. Glock,et al.  Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand , 2012 .

[51]  Samar K. Mukhopadhyay,et al.  Supply chain coordination under uncertainty , 2011 .

[52]  Mingming Leng,et al.  Side-payment contracts in two-person nonzero-sum supply chain games: Review, discussion and applications , 2009, Eur. J. Oper. Res..

[53]  Geoffrey Qiping Shen,et al.  Schedule risk modeling in prefabrication housing production , 2017 .

[54]  Moueen K. Salameh,et al.  Optimal just-in-time buffer inventory for regular preventive maintenance , 2001 .

[55]  Syed M. Ahmed,et al.  Construction Coordination Activities: What Is Important and What Consumes Time , 2001 .

[56]  Ulrich Wilhelm Thonemann,et al.  Reference points in revenue sharing contracts - How to design optimal supply chain contracts , 2016, Eur. J. Oper. Res..

[57]  Roberto Cigolini,et al.  Linking product modularity to supply chain integration in the construction and shipbuilding industries , 2015 .

[58]  Stephen G. Powell,et al.  Manufacturer incentives to improve retail service levels , 1998 .

[59]  Gyöngyi Kovács,et al.  Investigating the effects of lead-time uncertainties and safety stocks on logistical performance in a border-crossing JIT supply chain , 2018, Comput. Ind. Eng..

[60]  C. M. Tam,et al.  Mapping Approach for Examining Waste Management on Construction Sites , 2004 .

[61]  Pius J. Egbelu,et al.  Planning and design models for construction industry: A critical survey , 2012 .

[62]  Shu-Lu Hsu,et al.  Replenishment and Lead Time Decisions in Manufacturer-Retailer Chains , 2009 .