Spatial-temporal hedging coordination in prefabricated housing production
暂无分享,去创建一个
[1] George Q. Huang,et al. Buffer space hedging and coordination in prefabricated construction supply chain management , 2018, International Journal of Production Economics.
[2] Xu Chen,et al. Channel coordination through subsidy contract design in the mobile phone industry , 2016 .
[3] Bin Shen,et al. Service supply chain management: A review of operational models , 2015, Eur. J. Oper. Res..
[4] Christophe Bérenguer,et al. Optimal Buffer Inventory and Opportunistic Preventive Maintenance Under Random Production Capacity Availability , 2008 .
[5] Jennifer Shang,et al. Contract design for two-stage supply chain coordination: Integrating manufacturer-quality and retailer-marketing efforts , 2013 .
[6] G. D. Eppen. Note---Effects of Centralization on Expected Costs in a Multi-Location Newsboy Problem , 1979 .
[7] Yongpei Guan,et al. Production , Manufacturing and Logistics Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games , 2010 .
[8] H. V. Landeghem,et al. Robust planning: a new paradigm for demand chain planning , 2002 .
[9] T. Cheng,et al. Joint supply chain risk management: An agency and collaboration perspective , 2015 .
[10] Ray Y. Zhong,et al. Production lead-time hedging and coordination in prefabricated construction supply chain management , 2017, Int. J. Prod. Res..
[11] Noor Amila Wan Abdullah Zawawi,et al. Coordination process in construction projects management , 2016 .
[12] Tsan-Ming Choi,et al. Coordinating supply chains with stochastic demand by crashing lead times , 2016, Comput. Oper. Res..
[13] Low Sui Pheng,et al. Just‐in‐time management in precast concrete construction: a survey of the readiness of main contractors in Singapore , 2001 .
[14] Tsan-Ming Choi,et al. Launching the right new product among multiple product candidates in fashion: Optimal choice and coordination with risk consideration , 2018, International Journal of Production Economics.
[15] Geoffrey Qiping Shen,et al. Critical review of the research on the management of prefabricated construction , 2014 .
[16] Yao Zhao,et al. Project-driven supply chains: integrating safety-stock and crashing decisions for recurrent projects , 2016, Ann. Oper. Res..
[17] Llewellyn Tang,et al. Simulating Construction Duration for Multistory Buildings with Controlling Activities , 2013 .
[18] Tsan-Ming Choi,et al. Impacts of lead time reduction on fabric sourcing in apparel production with yield and environmental considerations , 2020, Ann. Oper. Res..
[19] Ray Y. Zhong,et al. Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction , 2017 .
[20] Gérard P. Cachon. Supply Chain Coordination with Contracts , 2003, Supply Chain Management.
[21] Kannan Govindan,et al. The Impact of Contractual Governance and Trust on EPC Projects in Construction Supply Chain Performance , 2015 .
[22] Paijit Pawan,et al. A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects , 2016 .
[23] G. Shen,et al. Stakeholder management studies in mega construction projects: A review and future directions , 2015 .
[24] Alvin W. Drake,et al. Fundamentals of Applied Probability Theory , 1967 .
[25] George Q. Huang,et al. Operational Hedging and Coordination in Prefabrication Construction Industry , 2017 .
[26] R. J. Tersine. Principles of inventory and materials management , 1982 .
[27] Albert P.C. Chan,et al. Critical Analysis of Partnering Research Trend in Construction Journals , 2012 .
[28] Geoffrey Qiping Shen,et al. An Internet of Things-enabled BIM platform for on-site assembly services in prefabricated construction , 2018 .
[29] Yue Zhai,et al. Operational hedging and coordination for prefabricated construction supply chain management , 2017 .
[30] Z. K. Weng,et al. THE DESIGN OF A JIT SUPPLY CHAIN: THE EFFECT OF LEADTIME UNCERTAINTY ON SAFETY STOCK , 1999 .
[31] Bon-Gang Hwang,et al. Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore , 2017 .
[32] George Q. Huang,et al. Multi-period hedging and coordination in a prefabricated construction supply chain , 2019 .
[33] Geoffrey Qiping Shen,et al. Barriers to promoting prefabricated construction in China : a cost-benefit analysis , 2018 .
[34] Jafar Heydari,et al. Lead time variation control using reliable shipment equipment: An incentive scheme for supply chain coordination , 2014 .
[35] Tsan-Ming Choi,et al. Online-offline fashion franchising supply chains without channel conflicts: Choices on postponement and contracts , 2017, International Journal of Production Economics.
[36] Graham K. Rand,et al. Decision Systems for Inventory Management and Production Planning , 1979 .
[37] Amanda J. Schmitt,et al. A Quantitative Analysis of Disruption Risk in a Multi-Echelon Supply Chain , 2011 .
[38] Low Sui Pheng. Project Life Cycles, Stakeholders and Organizations , 2018 .
[39] George Q. Huang,et al. Towards operational hedging for logistics uncertainty management in prefabrication construction , 2015 .
[40] Gabriel A. Barraza,et al. Probabilistic Control of Project Performance Using Control Limit Curves , 2007 .
[41] Davide Aloini,et al. Key antecedents and practices for Supply Chain Management adoption in project contexts , 2015 .
[42] Stuart X. Zhu,et al. Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain , 2015 .
[43] Mani Poshdar,et al. Characterization of Process Variability in Construction , 2014 .
[44] Alexandre Dolgui,et al. Optimization of multi-period supply planning under stochastic lead times and a dynamic demand , 2019, International Journal of Production Economics.
[45] Panos Kouvelis,et al. Supply Chain Management Research and Production and Operations Management: Review, Trends, and Opportunities , 2006 .
[46] Margaret K.Y. Mok,et al. Schedule risks in prefabrication housing production in Hong Kong: a social network analysis , 2016 .
[47] Weisheng Lu,et al. An Internet of Things-enabled BIM platform for modular integrated construction: A case study in Hong Kong , 2019, Adv. Eng. Informatics.
[48] Yuan Fang,et al. Enhancing the logistics of construction materials through activity‐based simulation approach , 2009 .
[49] Alexandre Dolgui,et al. Supply planning under uncertainties in MRP environments: A state of the art , 2007, Annu. Rev. Control..
[50] Christoph H. Glock,et al. Lead time reduction strategies in a single-vendor–single-buyer integrated inventory model with lot size-dependent lead times and stochastic demand , 2012 .
[51] Samar K. Mukhopadhyay,et al. Supply chain coordination under uncertainty , 2011 .
[52] Mingming Leng,et al. Side-payment contracts in two-person nonzero-sum supply chain games: Review, discussion and applications , 2009, Eur. J. Oper. Res..
[53] Geoffrey Qiping Shen,et al. Schedule risk modeling in prefabrication housing production , 2017 .
[54] Moueen K. Salameh,et al. Optimal just-in-time buffer inventory for regular preventive maintenance , 2001 .
[55] Syed M. Ahmed,et al. Construction Coordination Activities: What Is Important and What Consumes Time , 2001 .
[56] Ulrich Wilhelm Thonemann,et al. Reference points in revenue sharing contracts - How to design optimal supply chain contracts , 2016, Eur. J. Oper. Res..
[57] Roberto Cigolini,et al. Linking product modularity to supply chain integration in the construction and shipbuilding industries , 2015 .
[58] Stephen G. Powell,et al. Manufacturer incentives to improve retail service levels , 1998 .
[59] Gyöngyi Kovács,et al. Investigating the effects of lead-time uncertainties and safety stocks on logistical performance in a border-crossing JIT supply chain , 2018, Comput. Ind. Eng..
[60] C. M. Tam,et al. Mapping Approach for Examining Waste Management on Construction Sites , 2004 .
[61] Pius J. Egbelu,et al. Planning and design models for construction industry: A critical survey , 2012 .
[62] Shu-Lu Hsu,et al. Replenishment and Lead Time Decisions in Manufacturer-Retailer Chains , 2009 .