Reprint of: Production scheduling of a lignite mine under quality and reserves uncertainty

Abstract The effect of uncertainty sources to the stochastic optimization of the combined project of a new surface lignite mine exploitation and power plant operation for electricity generation is investigated. Major sources of uncertainty that were considered are the reserves and the quality of the lignite. Since probability distribution functions for these uncertainties were estimated during the detailed exploration phase of the deposit, the overall goal is then to determine the optimal capacity of the power plant and consequently the optimal production rate of the mine over the time. The optimization objective that was selected is the maximization of the net present value of the project. Emphasis is placed on the sensitivity analysis for the investigation of the effect of quality and reserves uncertainty on project optimization, on the mathematical formulation of risk attitude strategy and on increasing the efficiency of the optimization process by creating a limited set of feasible solutions applying empirical rules. The developed methodology was applied for the determination of the optimal annual production rate of a new surface lignite mine in the area of Ptolemais–Amynteon in Northern Greece.

[1]  M. Galetakis,et al.  Quality Characteristics of Greek Brown Coals and Their Relation to the Applied Exploitation and Utilization Methods , 2005 .

[2]  Michael Galetakis,et al.  Prediction of the Performance of On-line Ash Analyzers Used in the Quality Control Process of a Coal Mining System , 2009 .

[3]  E. Borgonovo Measuring Uncertainty Importance: Investigation and Comparison of Alternative Approaches , 2006, Risk analysis : an official publication of the Society for Risk Analysis.

[4]  Misgana K. Muleta,et al.  Sensitivity and uncertainty analysis coupled with automatic calibration for a distributed watershed model , 2005 .

[5]  D. Vamvuka,et al.  Carbon Dioxide Emissions from Coal-Fired Power Plants in Greece in Relation to Mined Lignite Quality , 2010 .

[6]  Jon C. Helton,et al.  Survey of sampling-based methods for uncertainty and sensitivity analysis , 2006, Reliab. Eng. Syst. Saf..

[7]  Donald A. Singer,et al.  A simplified economic filter for open-pit mining and heap-leach recovery of copper in the United States , 2001 .

[8]  Stefano Tarantola,et al.  Sensitivity Analysis in Practice: A Guide to Assessing Scientific Models , 2004 .

[9]  L. Durlofsky,et al.  Optimization of nonconventional wells under uncertainty using statistical proxies , 2006 .

[10]  F. Pavloudakis,et al.  The effect of lignite quality variation on the efficiency of on-line ash analyzers , 2009 .

[11]  Michael Galetakis,et al.  Lignite Quality Uncertainty Estimation for the Assessment of CO2 Emissions , 2009 .

[12]  Michael Galetakis,et al.  Selective mining of multiple-layer lignite deposits. A fuzzy approach , 2010, Expert Syst. Appl..