Study on the identification of main drivers affecting the performance of human operators during low power and shutdown operation
暂无分享,去创建一个
[1] Ali Mosleh,et al. Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents: Part 1: Overview of the IDAC Model , 2007, Reliab. Eng. Syst. Saf..
[2] Ali Mosleh,et al. Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents: Part 5: Dynamic probabilistic simulation of the IDAC model , 2007, Reliab. Eng. Syst. Saf..
[3] F. Paul Wilson,et al. Root Cause Analysis : A Tool for Total Quality Management , 1993 .
[4] W. Luckas,et al. An analysis of operational experience during low power and shutdown and a plan for addressing human reliability assessment issues , 1994 .
[5] Harold S. Blackman,et al. INTENT: a method for estimating human error probabilities for decisionbased errors , 1992 .
[6] R. L. Brune,et al. Peer-review study of the draft handbook for human-reliability analysis with emphasis on nuclear-power-plant applications, NUREG/CR-1278 , 1983 .
[7] Ronald Laurids Boring. A review of human reliability needs in the U.S. nuclear industry , 2015, 2015 Resilience Week (RWS).
[8] Wondea Jung,et al. A taxonomy of performance influencing factors for human reliability analysis of emergency tasks , 2003 .
[9] A. D. Swain,et al. Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report , 1983 .
[10] J.C. Williams,et al. A data-based method for assessing and reducing human error to improve operational performance , 1988, Conference Record for 1988 IEEE Fourth Conference on Human Factors and Power Plants,.
[11] Erik Hollnagel,et al. Cognitive reliability and error analysis method , 1998 .
[12] Barry Kirwan,et al. The development of a nuclear chemical plant human reliability management approach: HRMS and JHEDI☆ , 1997 .
[13] Poong Hyun Seong,et al. ADVANCED MMIS TOWARD SUBSTANTIAL REDUCTION IN HUMAN ERRORS IN NPPS , 2013 .