Employing Data Warehouse for Contract Administration : e-Dispute Resolution Prototype 31 32

Although data warehouse is very practical for decision making, its application in contract 33 administration is rather limited due to the complicated legal issues and the voluminous data involved. This 34 research attempts to bridge this gap in two ways. First, conceptual models of data warehouse are developed 35 to explain the contents and overall features of the system which were verified by twelve experts in 36 Malaysia. Second, a template, e-Dispute Resolution (e-DR), is prototyped using Microsoft Access based on 37 the guidelines of contractual variations agreed by the experts. Subsequently, the prototype is evaluated by 38 sixteen professional quantity surveyors from an established consulting firm. The prototype was organized 39 based on a systematic breakdown of issues and incorporated a Boolean keyword search feature. The results 40 show that the concept of data warehouse is applicable to contract administration and is well received by 41 practitioners. Overall, this article renders significant theoretical and practical contributions where the 42 resulting e-DR does not only lead toward a more informed decision making, but is also able to mitigate or 43 prevent contractual disputes in the construction industry where such a phenomenon seems to be inevitable. 44 45

[1]  Kwok-wing Chau,et al.  Application of a PSO-based neural network in analysis of outcomes of construction claims , 2007 .

[2]  Jonathan Jingsheng Shi,et al.  A project-oriented data warehouse for construction , 2006 .

[3]  Wenhong Luo,et al.  A framework for selecting business process modeling methods , 1999 .

[4]  Lucio Soibelman,et al.  Factor selection for delay analysis using Knowledge Discovery in Databases , 2008 .

[5]  James E. Diekmann,et al.  Discon: an expert system for construction contract disputes , 1988 .

[6]  Inderpal Singh Mumick,et al.  Selection of Views to Materialize in a Data Warehouse , 2005, IEEE Trans. Knowl. Data Eng..

[7]  Binshan Lin,et al.  An Ecological Model for Organizational Knowledge Management , 2010, J. Comput. Inf. Syst..

[8]  Raufdeen Rameezdeen,et al.  Contract interpretation: the impact of readability , 2007 .

[9]  Jaideep Srivastava,et al.  Warehouse Creation - A Potential Roadblock to Data Warehousing , 1999, IEEE Trans. Knowl. Data Eng..

[10]  Sai On Cheung,et al.  Construction Negotiation Online , 2004 .

[11]  Essam Zaneldin,et al.  Construction claims in United Arab Emirates: Types, causes, and frequency , 2006 .

[12]  Jieh-Haur Chen,et al.  KNN based knowledge-sharing model for severe change order disputes in construction , 2008 .

[13]  Charles T. Jahren,et al.  Investigation Into Construction Disputes , 1990 .

[14]  S. Cheung,et al.  A study of construction mediator tactics—Part I: Taxonomies of dispute sources, mediator tactics and mediation outcomes , 2007 .

[15]  Jon C. Broome,et al.  A comparison of the clarity of traditional construction contracts and of the New Engineering Contract , 1997 .

[16]  Victor B. Kreng,et al.  The application of Fuzzy Delphi Method and Fuzzy AHP in lubricant regenerative technology selection , 2010, Expert Syst. Appl..

[17]  Mustafa Alshawi,et al.  Augmented process model for e-tendering: Towards integrating object models with document management systems , 2010 .

[18]  Amr A. Oloufa,et al.  Model for Quantifying the Impact of Change Orders on Project Cost for U.S. Roadwork Construction , 2010 .

[19]  Keith R. Molenaar,et al.  Prediction of Construction Disputes in Change Issues , 2000 .

[20]  Rosli Mohamad Zin,et al.  A case study into the language structure of construction standard form in Malaysia , 2010 .

[21]  Mark I. Hwang,et al.  A Structural Model of Data Warehousing Success , 2008, J. Comput. Inf. Syst..

[22]  Robert A. Perkins,et al.  Sources of Changes in Design – Build Contracts for a Governmental Owner , 2009 .

[23]  Ying-Feng Kuo,et al.  Constructing performance appraisal indicators for mobility of the service industries using Fuzzy Delphi Method , 2008, Expert Syst. Appl..

[24]  Richard D. Hackathorn,et al.  Using the Data Warehouse , 1994 .

[25]  Keith W. Hipel,et al.  Conflict resolution in construction disputes using the graph model , 2006 .

[26]  Nayem Rahman Refreshing Data Warehouses with near Real-Time Updates , 2007, J. Comput. Inf. Syst..

[27]  Alan Richard,et al.  New Trends and Bad Results in Construction Contracts, Part I , 2004 .

[28]  Kwok-wing Chau,et al.  Application of data warehouse and Decision Support System in construction management , 2003 .

[29]  Tanaya Korde,et al.  Visual representation of construction management data , 2009 .

[30]  Mandar Mitra,et al.  Information Retrieval from Documents: A Survey , 2000, Information Retrieval.

[31]  Timos K. Sellis,et al.  Dynamic Data Warehouse Design , 1999, DaWaK.

[32]  W. H. Inmon,et al.  Building the Data Warehouse,3rd Edition , 2002 .

[33]  H. Randolph Thomas,et al.  Interpretation of Construction Contracts , 1994 .

[34]  Min-Yuan Cheng,et al.  Fuzzy case-based reasoning for coping with construction disputes , 2009, Expert Syst. Appl..

[35]  Shing-Ko Liang,et al.  Determinants of the Assignment of Managers to Foreign Branches by Banks, Using the Fuzzy Delphi Method , 2006 .

[36]  Alberto Abelló,et al.  A framework for multidimensional design of data warehouses from ontologies , 2010, Data Knowl. Eng..

[37]  Khaled El-Rayes,et al.  Change Orders Impact on Labor Productivity , 2005 .

[38]  Francis T. Hartman,et al.  Construction Claims and Disputes: Causes and Cost/Time Overruns , 1994 .