Auditing the indirect consequences of rework in construction: a case based approach
暂无分享,去创建一个
[1] T. Jick. Mixing Qualitative and Quantitative Methods: Triangulation in Action. , 1979 .
[2] R. Yin. Case Study Research: Design and Methods , 1984 .
[3] Peter J. Frost,et al. Organizational Reality: Reports from the Firing Line , 1986 .
[4] Catherine Hakim,et al. Research Design: Strategies and Choices in the Design of Social Research , 1987 .
[5] W. B. Ledbetter,et al. MEASURING DESIGN AND CONSTRUCTION QUALITY COSTS , 1989 .
[6] Paul Fazio,et al. Impact of change orders on construction productivity , 1991 .
[7] Stuart E. Madnick,et al. Software Project Dynamics: An Integrated Approach , 1991 .
[8] W. B. Ledbetter,et al. Causes of Quality Deviations in Design and Construction , 1992 .
[9] Jens Knocke. Post-construction liability and insurance , 1993 .
[10] H. Abdul-Rahman. The cost of non-conformance during a highway project: a case study , 1995 .
[11] Karl-Olof Nylén,et al. Cost of failure in a major civil engineering project , 1996 .
[12] Mohan M. Kumaraswamy,et al. A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .
[13] J. Campanella. Principles of Quality Costs: Principles, Implementation and Use , 1999 .
[14] Robert J. Chapman,et al. The likelihood and impact of changes of key project personnel on the design process , 1999 .
[15] J. H. Rogerson,et al. A quantitative study of post contract award design changes in construction , 1999 .
[16] P.-E Josephson,et al. The causes and costs of defects in construction. A study of seven building projects , 1999 .
[17] A. K. Munns,et al. Estimating using cost significant global cost models , 2000 .
[18] Peter E.D. Love,et al. Overcoming the problems associated with quality certification , 2000 .
[19] Peter E.D. Love,et al. Quantifying the causes and costs of rework in construction , 2000 .
[20] Peter E. D. Love,et al. Construction business performance measurement: the SPM alternative , 2000, Bus. Process. Manag. J..
[21] Peter E.D. Love,et al. Modelling the dynamics of design error induced rework in construction , 2000 .
[22] Mike Hoxley,et al. Are competitive fee tendering and construction professional service quality mutually exclusive? , 2000 .
[23] C. Tomkins,et al. Quality failure costs in civil engineering projects , 2000 .
[24] G. D. Holt,et al. The learning organisation: toward a paradigm for mutually beneficial strategic construction alliances , 2000 .
[25] J. L. Ashford,et al. The Management of Quality in Construction , 2002 .
[26] Peter E.D. Love,et al. Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .