Auditing the indirect consequences of rework in construction: a case based approach

There is little known about the indirect consequences of rework in construction projects, especially the financial costs. Therefore, this paper uses examples from a case study to demonstrate the potential indirect consequences and costs that are associated with undertaking rework in building construction projects. A novel taxonomy for categorising the indirect consequences at an individual level, organisational level and project level is presented. Based on the findings from examples derived from the case study, it is suggested that the incidence of rework can have a multiplier effect of up to six times the actual (direct) cost of rectification. To reduce these costs it is concluded that design and construction organisations must improve their quality management systems by including a quality system for continuously auditing, analysing and presenting direct as well as indirect rework costs.

[1]  T. Jick Mixing Qualitative and Quantitative Methods: Triangulation in Action. , 1979 .

[2]  R. Yin Case Study Research: Design and Methods , 1984 .

[3]  Peter J. Frost,et al.  Organizational Reality: Reports from the Firing Line , 1986 .

[4]  Catherine Hakim,et al.  Research Design: Strategies and Choices in the Design of Social Research , 1987 .

[5]  W. B. Ledbetter,et al.  MEASURING DESIGN AND CONSTRUCTION QUALITY COSTS , 1989 .

[6]  Paul Fazio,et al.  Impact of change orders on construction productivity , 1991 .

[7]  Stuart E. Madnick,et al.  Software Project Dynamics: An Integrated Approach , 1991 .

[8]  W. B. Ledbetter,et al.  Causes of Quality Deviations in Design and Construction , 1992 .

[9]  Jens Knocke Post-construction liability and insurance , 1993 .

[10]  H. Abdul-Rahman The cost of non-conformance during a highway project: a case study , 1995 .

[11]  Karl-Olof Nylén,et al.  Cost of failure in a major civil engineering project , 1996 .

[12]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[13]  J. Campanella Principles of Quality Costs: Principles, Implementation and Use , 1999 .

[14]  Robert J. Chapman,et al.  The likelihood and impact of changes of key project personnel on the design process , 1999 .

[15]  J. H. Rogerson,et al.  A quantitative study of post contract award design changes in construction , 1999 .

[16]  P.-E Josephson,et al.  The causes and costs of defects in construction. A study of seven building projects , 1999 .

[17]  A. K. Munns,et al.  Estimating using cost significant global cost models , 2000 .

[18]  Peter E.D. Love,et al.  Overcoming the problems associated with quality certification , 2000 .

[19]  Peter E.D. Love,et al.  Quantifying the causes and costs of rework in construction , 2000 .

[20]  Peter E. D. Love,et al.  Construction business performance measurement: the SPM alternative , 2000, Bus. Process. Manag. J..

[21]  Peter E.D. Love,et al.  Modelling the dynamics of design error induced rework in construction , 2000 .

[22]  Mike Hoxley,et al.  Are competitive fee tendering and construction professional service quality mutually exclusive? , 2000 .

[23]  C. Tomkins,et al.  Quality failure costs in civil engineering projects , 2000 .

[24]  G. D. Holt,et al.  The learning organisation: toward a paradigm for mutually beneficial strategic construction alliances , 2000 .

[25]  J. L. Ashford,et al.  The Management of Quality in Construction , 2002 .

[26]  Peter E.D. Love,et al.  Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects , 2002 .