ExpoMmport of Spinning Reserve in Interconnected Generation Systems
暂无分享,去创建一个
[1] T. N. Saha,et al. An Application of a Direct Method to the Optimal Scheduling of Hydrothermal System , 1978, IEEE Transactions on Power Apparatus and Systems.
[2] Roy Billinton,et al. Unit commitment in interconnected generating systems using a probabilistic technique , 1990 .
[3] P. G. Lowery,et al. Generating Unit Commitment by Dynamic Programming , 1966 .
[4] Dimitri Bertsekas,et al. Optimal Scheduling Of Large Hydrothermal Power Systems , 1985, IEEE Transactions on Power Apparatus and Systems.
[5] Nurul Amin Chowdhury. SPINNING RESERVE ASSESSMENT IN INTERCONNECTED GENERATION SYSTEMS , 1989 .
[6] K. Hara,et al. A Method for Planning Economic Unit Commitment and Maintenance of Thermal Power Systems , 1966 .
[7] Roy Billinton,et al. Operating reserve assessment in interconnected generating systems , 1988 .
[8] I. Hano,et al. An Application of the Maximum Principle to the Most Economical Operation of Power Systems , 1966 .
[9] Walter O. Stadlin. Economic Allocation of Regulating Margin , 1971 .
[10] Richard C. Wilson,et al. An Application of Mixed-Integer Programming Duality to Scheduling Thermal Generating Systems , 1968 .
[11] R. H. Kerr,et al. Unit commitment , 1966, Mathematical Programming for Power Systems Operation with Applications in Python.
[12] H. H. Happ,et al. Large Scale Hydro-Thermal Unit Commitment-Method and Results , 1971 .
[13] R. Billinton,et al. Assessment of Spinning Reserve in Interconnected Generation Systems with Export/Import Constraints , 1989, IEEE Power Engineering Review.
[14] Roy Billinton,et al. Risk constrained economic load dispatch in interconnected generating systems , 1990 .