An Exploration Of Causes For Delay And Cost Overrun In Construction Projects: A Case Study Of Australia, Malaysia & Ghana

Delay and cost overrun are the key problems of any construction projects. These issues are causing the negative impact on the development of country economic growth and prosperity. To overcome these issues, the paper is aimed to ascertain the most impelling factors causing the project delay and cost overrun, and highlight the possible measures so that the impact on construction projects could be reduced. Each country’s quantitative data from past studies was selected to analyse and recommend the effective measures. A questionnaire survey was conducted in all three case studies adopting different data collection strategies. The main reason of selecting three case studies is to outline the comparative analysis of delay factors and to classify these factors into different priority level of influence in project delay from country to country. The findings from three case studies exposed that the most influential factors in Australia are (1) planning and scheduling deficiencies, (2) methods of construction, (3) effective monitoring and feedback process, whereas in Ghana, (1) delay in payment certificates (2) underestimating of project cost, (3) complexity and size of projects are the most influential factors. However, in Malaysia (1) Contractor’s improper planning, (2) poor site management and (3) inadequate contractor’s experience are the most impelling factors causing project delay and cost overrun. This paper has also analysed the average and least impact of the delay factors causing project delay and cost overrun in those countries. The paper concludes that there are diverse groups of delay factors from one country to another country that cause the project delay and cost overrun. It also concludes that there are diverse measures according to the nature of delay factor are necessary to reduce the impact on project delay and cost overrun in the construction industry in both developed and developing countries.

[1]  A. M. Odeh,et al.  Causes of construction delay: traditional contracts , 2002 .

[2]  W J Angelo,et al.  MEGAPROJECTS NEED MORE STUDY UP FRONT TO AVOID COST OVERRUNS , 2002 .

[3]  Ayman H. Al-Momani,et al.  Construction delay: a quantitative analysis , 2000 .

[4]  Murali Sambasivan,et al.  Causes and effects of delays in Malaysian construction industry , 2007 .

[5]  Søren L. Buhl,et al.  How common and how large are cost overruns in transport infrastructure projects? , 2003 .

[6]  Frank Fugar,et al.  Delays in Building Construction Projects in Ghana , 2010 .

[7]  Paul. Olomolaiye,et al.  Attributes of UK construction clients influencing project consultants' performance , 1994 .

[8]  David Greenwood,et al.  Subcontractors’ liability for project delay , 2005 .

[9]  Ernawati,et al.  The significant factors causing delay of building construction projects in Malaysia , 2007 .

[10]  Martin Skitmore,et al.  Causes of delays in Saudi Arabian public sector construction projects , 2009 .

[11]  Syed M. Ahmed,et al.  Risk management trends in the Hong Kong construction industry: a comparison of contractors and owners perceptions , 1999 .

[12]  Charles T. Jahren,et al.  Predictors of Cost‐Overrun Rates , 1990 .

[13]  M. Haseeb,et al.  PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN , 2012, Australian Journal of Business and Management Research.

[14]  Mohan M. Kumaraswamy,et al.  Delays and cost overruns in the construction projects in the Gaza Strip , 2009 .

[15]  Michael T. Callahan,et al.  Construction Delay Claims , 1992 .

[16]  Jacqueline Grennon , 2nd Ed. , 2002, The Journal of nervous and mental disease.

[17]  A. Aljohani,et al.  Cost Overrun in Delivery of Public Projects in the Saudi Construction Industry: A Review , 2015 .

[18]  David Arditi,et al.  Cost overruns in public projects , 1985 .

[19]  Fran Ackermann,et al.  Understanding the causes and consequences of disruption and delay in complex projects: how system dynamics can help , 2009 .

[20]  Sadi Assaf,et al.  Causes of delay in large construction projects , 2006 .

[21]  Peter W. G. Morris,et al.  The Anatomy of Major Projects: A Study of the Reality of Project Management , 1988 .

[22]  Mohan M. Kumaraswamy,et al.  A comparative study of causes of time overruns in Hong Kong construction projects , 1997 .

[23]  Peter W. G. Morris,et al.  The Anatomy of Major Projects , 1987 .

[24]  Richard A. Parker,et al.  Designing and conducting survey research , 2016 .

[25]  T. Mezher,et al.  Causes of delays in the construction industry in Lebanon , 1998 .

[26]  Mundia Muya,et al.  An Overview of Construction Claims: A Case Study of the Zambian Construction Industry , 2012 .

[27]  Ayman H. Al-Momani,et al.  Construction cost prediction for public school buildings in Jordan , 1996 .

[28]  Ralph D. Ellis,et al.  THE ROOT CAUSES OF DELAYS IN HIGHWAY CONSTRUCTION , 2003 .

[29]  Chotchai Charoenngam,et al.  Assessment of cost control systems: a case study of Thai construction organizations , 2001 .

[30]  Amund Bruland,et al.  Causes of Delay in Road Construction Projects , 2012 .

[31]  Ivars Avotos,et al.  Cost-relevance analysis for overrun control , 1983 .

[32]  Janet K. Yates,et al.  Avoiding and Minimizing Construction Delay Claim Disputes in Relational Contracting , 2006 .

[33]  Koleola Tunwase Odusami,et al.  Significant Factors Causing Cost Overruns in Telecommunication Projects in Nigeria , 2010 .

[34]  Albert P.C. Chan,et al.  Factors Affecting the Success of a Construction Project , 2004 .

[35]  Hemanta Doloi,et al.  Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects , 2013 .

[36]  Gary David Holt,et al.  Factors influencing construction time and cost overruns on high-rise projects in Indonesia , 1997 .

[37]  N. Kartam,et al.  Delays and cost increases in the construction of private residential projects in Kuwait , 2005 .