Two Control Areas Reliability Assessment Method based on the State Enumeration Method Considering Mass Penetration of Intermittent Generation

[1]  Roy Billinton,et al.  Pseudo-chronological simulation for composite reliability analysis with time varying loads , 2000 .

[2]  A.M.L. da Silva,et al.  Generating Capacity Reliability Evaluation Based on Monte Carlo Simulation and Cross-Entropy Methods , 2010, IEEE Transactions on Power Systems.

[3]  Hiroyuki Kita,et al.  Generation Expansion Planning Considering Mass Penetration of Renewable Energy Generation and Supply Reliability , 2014 .

[4]  P. Jirutitijaroen,et al.  Reliability constrained multi-area adequacy planning using stochastic programming with sample-average approximations , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.

[5]  Peng Wang,et al.  Reliability Evaluation of Power Systems Considering Restructuring and Renewable Generators , 2012, IEEE Transactions on Power Systems.

[6]  Rong-fu Sun,et al.  Capacity benefit margin assessment based on multi-area generation reliability exponential analytic model , 2008 .

[7]  R. Billinton,et al.  Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment , 2006, IEEE Transactions on Energy Conversion.

[8]  R. Billinton,et al.  A Reliability Test System for Educational Purposes-Basic Data , 1989, IEEE Power Engineering Review.

[9]  M. Shahidehpour,et al.  Coordination of Short-Term Operation Constraints in Multi-Area Expansion Planning , 2012, IEEE Transactions on Power Systems.