Two Control Areas Reliability Assessment Method based on the State Enumeration Method Considering Mass Penetration of Intermittent Generation
暂无分享,去创建一个
[1] Roy Billinton,et al. Pseudo-chronological simulation for composite reliability analysis with time varying loads , 2000 .
[2] A.M.L. da Silva,et al. Generating Capacity Reliability Evaluation Based on Monte Carlo Simulation and Cross-Entropy Methods , 2010, IEEE Transactions on Power Systems.
[3] Hiroyuki Kita,et al. Generation Expansion Planning Considering Mass Penetration of Renewable Energy Generation and Supply Reliability , 2014 .
[4] P. Jirutitijaroen,et al. Reliability constrained multi-area adequacy planning using stochastic programming with sample-average approximations , 2008, 2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century.
[5] Peng Wang,et al. Reliability Evaluation of Power Systems Considering Restructuring and Renewable Generators , 2012, IEEE Transactions on Power Systems.
[6] Rong-fu Sun,et al. Capacity benefit margin assessment based on multi-area generation reliability exponential analytic model , 2008 .
[7] R. Billinton,et al. Considering load-carrying capability and wind speed correlation of WECS in generation adequacy assessment , 2006, IEEE Transactions on Energy Conversion.
[8] R. Billinton,et al. A Reliability Test System for Educational Purposes-Basic Data , 1989, IEEE Power Engineering Review.
[9] M. Shahidehpour,et al. Coordination of Short-Term Operation Constraints in Multi-Area Expansion Planning , 2012, IEEE Transactions on Power Systems.