Research on a layered coupling optimal operation model of the Three Gorges and Gezhouba cascade hydropower stations

Abstract The uncertainty of electricity demands and reservoir inflows makes the optimal operation of hydropower stations extremely difficult. Therefore, it is very important to establish a multi-time-scale coupling model that not only reflects the current inflows of short-term strategies but also adapts to the mid-term and long-term optimal strategies. In this paper, using the Three Gorges and Gezhouba cascade hydropower stations as examples, the principles of the layered coupling on multiple time scales are proposed. The control strategies and mechanisms of information feedback for layered models are also presented. Based on these theories, this study establishes an optimal five-layered coupling operation model of the Three Gorges and Gezhouba cascade hydropower stations with the objective of maximizing the generated energy solved by Incremental Dynamic Programming (IDP). Data from 2009 is used as the case study for the optimization of the cascade system. The results show that the model can preferably take advantage of the forecasted inflows with different levels of precision and coordinate the “control and feedback” relationships between short-term and long-term strategies.

[1]  T. Kristiansen Hydropower scheduling and financial risk management , 2006 .

[2]  David W. Watkins,et al.  LINEAR PROGRAMMING FOR FLOOD CONTROL IN THE IOWA AND DES MOINES RIVERS , 2000 .

[3]  Robert E. Larson,et al.  State increment dynamic programming , 1968 .

[4]  Ahmed El-Shafie,et al.  Integrated Artificial Neural Network (ANN) and Stochastic Dynamic Programming (SDP) Model for Optimal Release Policy , 2013, Water Resources Management.

[5]  K. D. W. Nandalal,et al.  Dynamic Programming Based Operation of Reservoirs: Applicability and Limits , 2007 .

[6]  Li Mo,et al.  Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach , 2013 .

[7]  Chao Ma,et al.  Short-term optimal operation of Three-gorge and Gezhouba cascade hydropower stations in non-flood season with operation rules from data mining , 2013 .

[8]  P. P. Mujumdar,et al.  A Bayesian Stochastic Optimization Model for a Multi-Reservoir Hydropower System , 2007 .

[9]  Hao Wang,et al.  Optimized reservoir operation to balance human and environmental requirements: A case study for the Three Gorges and Gezhouba Dams, Yangtze River basin, China , 2013, Ecol. Informatics.

[10]  Ziqiang Xia,et al.  Impacts of the Gezhouba and Three Gorges reservoirs on the sediment regime in the Yangtze River, China , 2011 .

[11]  Zhang Yan,et al.  A review on risk-constrained hydropower scheduling in deregulated power market , 2008 .

[12]  Christine A. Shoemaker,et al.  Estimating Maximal Annual Energy Given Heterogeneous Hydropower Generating Units with Application to the Three Gorges System , 2013 .

[13]  Lihua Xiong,et al.  Effects of the Three Gorges Reservoir on the hydrological droughts at the downstream Yichang station during 2003–2011 , 2013 .

[14]  John W. Labadie,et al.  Optimal Operation of Multireservoir Systems: State-of-the-Art Review , 2004 .

[15]  Bin Xu,et al.  A risk decision model of the contract generation for hydropower generation companies in electricity markets , 2013 .

[16]  Frank T.-C. Tsai,et al.  Optimization of Large-Scale Hydropower System Operations , 2003 .

[17]  Birger Mo,et al.  Integrated risk management of hydro power scheduling and contract management , 2001 .

[18]  Pan Liu,et al.  Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty , 2010 .

[19]  Huicheng Zhou,et al.  Value of Medium-range Precipitation Forecasts in Inflow Prediction and Hydropower Optimization , 2010 .

[20]  Petter Vegard Hansen Inflow Uncertainty in Hydropower Markets , 2009 .

[21]  R. Molarius,et al.  Creating a climate change risk assessment procedure: Hydropower plant case, Finland , 2010 .