A Fuzzy AHP and PROMETHEE method-based heuristic for disassembly line balancing problems

Nowadays, new products have been introduced in the market at an ever increasing pace due to rapid technology advancement. Consequently, products are becoming outdated and discarded faster than ever before. Since the demand for new solutions to economically deal with such outdated products begun to rise, the disassembly line has emerged as a viable solution to this problem. The disassembly line has been considered as a viable choice for automated disassembly of returned products. The problem of sequence generation in disassembly is complex due to its NP-Hard nature and therefore the heuristically solutions are most preferable for these types of problems. In this paper, a heuristic has been proposed to assign the disassembly tasks/parts to the work stations under its precedence constraints. It incorporates Fuzzy analytic hierarchy process (Fuzzy AHP) and PROMETHEE method for the selection of tasks for assignment to the disassembly line. The Fuzzy AHP has been used to find the relative importance of each criteria and PROMETHEE method has been used for prioritising the tasks for assignment. The proposed heuristics has been illustrated with an example and the results have been compared to the heuristic proposed by McGovern and Gupta. The proposed heuristic performs well and has shown improvements in terms of cycle time and idle time of the workstations.

[1]  R. Jain Prioritization of Supplier Selection Criteria: A Fuzzy-AHP Approach , 2013 .

[2]  Cathy Macharis,et al.  THE STRATEGIC EVALUATION OF NEW TECHNOLOGIES THROUGH MULTICRITERIA ANALYSIS: THE ADVISORS CASE. IN: ECONOMIC IMPACTS OF INTELLIGENT TRANSPORTATION SYSTEMS: INNOVATIONS AND CASE STUDIES , 2004 .

[3]  Constantin Zopounidis,et al.  A multicriteria classification approach based on pairwise comparisons , 2004, Eur. J. Oper. Res..

[4]  J Climaco,et al.  THE APPLICABILITY OF MULTICRITERIA-ANALYSIS TO THE EVALUATION OF INTELLIGENT TRANSPORT SYSTEMS (ITS) , 2004 .

[5]  Paul G. Ranky,et al.  Dynamic scheduling and line balancing methods, and software tools for lean and reconfigurable disassembly cells and lines , 2003, IEEE International Symposium on Electronics and the Environment, 2003..

[6]  Surendra M. Gupta,et al.  Ant colony optimization for disassembly sequencing with multiple objectives , 2006 .

[7]  Alfred J.D. Lambert,et al.  Methods for optimum and near optimum disassembly sequencing , 2008 .

[8]  Hepu Deng,et al.  Multicriteria analysis with fuzzy pairwise comparison , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[9]  L. C. Leung,et al.  On consistency and ranking of alternatives in fuzzy AHP , 2000, Eur. J. Oper. Res..

[10]  Manoj Kumar Tiwari,et al.  Global supplier selection: a fuzzy-AHP approach , 2008 .

[11]  Surendra M. Gupta,et al.  Combinatorial optimization analysis of the unary NP-complete disassembly line balancing problem , 2007 .

[12]  Manoj Kumar Tiwari,et al.  A collaborative ant colony algorithm to stochastic mixed-model U-shaped disassembly line balancing and sequencing problem , 2008 .

[13]  Hepu Deng Multicriteria analysis with fuzzy pairwise comparison , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[14]  P. Vincke,et al.  Note-A Preference Ranking Organisation Method: The PROMETHEE Method for Multiple Criteria Decision-Making , 1985 .

[15]  Ihsan Sabuncuoglu,et al.  Two exact formulations for disassembly line balancing problems with task precedence diagram construction using an AND/OR graph , 2009 .

[16]  Rajeev Jain,et al.  Robust strategies for mitigating operational and disruption risks: a fuzzy AHP approach , 2012 .

[17]  Laurence Turcksin,et al.  A Combined AHP-PROMETHEE Approach for Selecting the Most Appropriate Policy Scenario to Stimulate a Clean Vehicle Fleet , 2011 .

[18]  Surendra M. Gupta,et al.  Disassembly sequence plan generation using a branch-and-bound algorithm , 2001 .

[19]  Surendra M. Gupta,et al.  2-opt heuristic for the disassembly line balancing problem , 2004, SPIE Optics East.

[20]  Surendra M. Gupta,et al.  Comparison of economic benefits of sensor embedded products and conventional products in a multi-product disassembly line , 2010, Comput. Ind. Eng..

[21]  Rahul Rai,et al.  A Petri Net based approach to determine the disassembly strategy of a product , 2002 .

[22]  Yixiong Feng,et al.  A new multi-objective ant colony algorithm for solving the disassembly line balancing problem , 2010 .

[23]  MengChu Zhou,et al.  A systematic approach to design and operation of disassembly lines , 2006, IEEE Trans Autom. Sci. Eng..

[24]  J. Buckley,et al.  Fuzzy hierarchical analysis , 1999, FUZZ-IEEE'99. 1999 IEEE International Fuzzy Systems. Conference Proceedings (Cat. No.99CH36315).

[25]  Andrew J. Higgins,et al.  A comparison of multiple criteria analysis techniques for water resource management , 2008, Eur. J. Oper. Res..

[26]  Arthur C. Sanderson,et al.  AND/OR graph representation of assembly plans , 1986, IEEE Trans. Robotics Autom..

[27]  Levent Kandiller,et al.  Profit-oriented disassembly-line balancing , 2008 .

[28]  Tsai C. Kuo,et al.  Environmentally conscious design and manufacturing: A state-of-the-art survey , 1997 .

[29]  Surendra M. Gupta,et al.  A balancing method and genetic algorithm for disassembly line balancing , 2007, Eur. J. Oper. Res..

[30]  Shankar Chakraborty,et al.  Facility Location Selection using PROMETHEE II Method , 2010 .

[31]  Surendra M. Gupta,et al.  Combinatorial optimization methods for disassembly line balancing , 2004, SPIE Optics East.

[32]  Ajd Fred Lambert,et al.  Disassembly sequencing: A survey , 2003 .

[33]  Alfred J.D. Lambert,et al.  Linear programming in disassembly/clustering sequence generation , 1999 .

[34]  Surendra M. Gupta,et al.  Disassembly line in product recovery , 2002 .