Predicting On-Time Line-Haul Performance in Scheduled Railroad Operations

This paper considers the problem of predicting on-time performance on a partially double-tracked rail line with scheduled traffic. In particular, the model presented herein explicitly incorporates the uncertainty in train departure times along with more complex line structures than have been considered previously. Extensive Monte Carlo simulations are used to validate the predictions made by the proposed model under an optimal meet/pass planning process.

[1]  A. J. Taylor,et al.  A Structured Model for Rail Line Simulation and Optimization , 1982 .

[2]  Ronald W. Wolff,et al.  Predicting Dispatching Delays on a Low Speed, Single Track Railroad , 1988, Transp. Sci..

[3]  Patrick T. Harker,et al.  Improving railroad on-time performance: models, algorithms and applications , 1989 .

[4]  Michel Gendreau,et al.  Approximate Formulas for the Computation of Connection Delays under Capacity Restrictions in Rail Freight Transportation , 1986 .

[5]  E. R. Petersen Over-the-Road Transit Time for a Single Track Railway , 1974 .

[6]  Richard L. Sauder,et al.  Computer aided train dispatching: decision support through optimization , 1983 .

[7]  Patrick T. Harker,et al.  Optimal Pacing of Trains in Freight Railroads: Model Formulation and Solution , 1991, Oper. Res..

[8]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[9]  Ove Frank Two-Way Traffic on a Single Line of Railway , 1966, Oper. Res..

[10]  M. Ben-Akiva,et al.  Discrete choice analysis , 1989 .

[11]  Seok-Woo Hong,et al.  TWO MOMENTS ESTIMATION OF THE DELAY ON A PARTIALLY DOUBLE-TRACK RAIL LINE WITH SCHEDULED TRAFFIC , 1990 .

[12]  R. Kellogg,et al.  Pathways to solutions, fixed points, and equilibria , 1983 .

[13]  M E Smith KEEPING TRAINS ON SCHEDULE: ON-LINE PLANNING SYSTEMS FOR THE ADVANCED RAILROAD ELECTRONICS SYSTEM (ARES) , 1990 .

[14]  C D Martland,et al.  ESTIMATING THE IMPACT OF ADVANCED DISPATCHING SYSTEMS ON TERMINAL PERFORMANCE , 1990 .

[15]  R. D. Murphy,et al.  Iterative solution of nonlinear equations , 1994 .

[16]  J. E. Glynn,et al.  Numerical Recipes: The Art of Scientific Computing , 1989 .

[17]  Patrick T. Harker,et al.  MANAGEMENT AND INFORMATION SYSTEMS COMPONENTS OF SUCCESSFUL ATCS , 1991 .

[18]  Patrick T. Harker,et al.  A DECISION SUPPORT SYSTEM FOR TRAIN DISPATCHING: AN OPTIMIZATION-BASED METHODOLOGY , 1990 .

[19]  Patrick T. Harker,et al.  Tactical Scheduling of Rail Operations: The SCAN I System , 1991, Transp. Sci..

[20]  Patrick T. Harker Services and Technology: Reengineering the Railroads , 1995 .

[21]  James M. Ortega,et al.  Iterative solution of nonlinear equations in several variables , 2014, Computer science and applied mathematics.

[22]  Patrick T Harter USE OF ADVANCED TRAIN CONTROL SYSTEMS IN SCHEDULING AND OPERATING RAILROADS: MODELS, ALGORITHMS, AND APPLICATIONS , 1990 .

[23]  Patrick T. Harker,et al.  Two Moments Estimation of the Delay on Single-Track Rail Lines with Scheduled Traffic , 1990, Transp. Sci..

[24]  Robert S. Kaplan,et al.  Burlington Northern: The ARES Decision (A) , 1991 .