Predicting On-Time Line-Haul Performance in Scheduled Railroad Operations
暂无分享,去创建一个
[1] A. J. Taylor,et al. A Structured Model for Rail Line Simulation and Optimization , 1982 .
[2] Ronald W. Wolff,et al. Predicting Dispatching Delays on a Low Speed, Single Track Railroad , 1988, Transp. Sci..
[3] Patrick T. Harker,et al. Improving railroad on-time performance: models, algorithms and applications , 1989 .
[4] Michel Gendreau,et al. Approximate Formulas for the Computation of Connection Delays under Capacity Restrictions in Rail Freight Transportation , 1986 .
[5] E. R. Petersen. Over-the-Road Transit Time for a Single Track Railway , 1974 .
[6] Richard L. Sauder,et al. Computer aided train dispatching: decision support through optimization , 1983 .
[7] Patrick T. Harker,et al. Optimal Pacing of Trains in Freight Railroads: Model Formulation and Solution , 1991, Oper. Res..
[8] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[9] Ove Frank. Two-Way Traffic on a Single Line of Railway , 1966, Oper. Res..
[10] M. Ben-Akiva,et al. Discrete choice analysis , 1989 .
[11] Seok-Woo Hong,et al. TWO MOMENTS ESTIMATION OF THE DELAY ON A PARTIALLY DOUBLE-TRACK RAIL LINE WITH SCHEDULED TRAFFIC , 1990 .
[12] R. Kellogg,et al. Pathways to solutions, fixed points, and equilibria , 1983 .
[13] M E Smith. KEEPING TRAINS ON SCHEDULE: ON-LINE PLANNING SYSTEMS FOR THE ADVANCED RAILROAD ELECTRONICS SYSTEM (ARES) , 1990 .
[14] C D Martland,et al. ESTIMATING THE IMPACT OF ADVANCED DISPATCHING SYSTEMS ON TERMINAL PERFORMANCE , 1990 .
[15] R. D. Murphy,et al. Iterative solution of nonlinear equations , 1994 .
[16] J. E. Glynn,et al. Numerical Recipes: The Art of Scientific Computing , 1989 .
[17] Patrick T. Harker,et al. MANAGEMENT AND INFORMATION SYSTEMS COMPONENTS OF SUCCESSFUL ATCS , 1991 .
[18] Patrick T. Harker,et al. A DECISION SUPPORT SYSTEM FOR TRAIN DISPATCHING: AN OPTIMIZATION-BASED METHODOLOGY , 1990 .
[19] Patrick T. Harker,et al. Tactical Scheduling of Rail Operations: The SCAN I System , 1991, Transp. Sci..
[20] Patrick T. Harker. Services and Technology: Reengineering the Railroads , 1995 .
[21] James M. Ortega,et al. Iterative solution of nonlinear equations in several variables , 2014, Computer science and applied mathematics.
[22] Patrick T Harter. USE OF ADVANCED TRAIN CONTROL SYSTEMS IN SCHEDULING AND OPERATING RAILROADS: MODELS, ALGORITHMS, AND APPLICATIONS , 1990 .
[23] Patrick T. Harker,et al. Two Moments Estimation of the Delay on Single-Track Rail Lines with Scheduled Traffic , 1990, Transp. Sci..
[24] Robert S. Kaplan,et al. Burlington Northern: The ARES Decision (A) , 1991 .