Exact and Heuristic Scheduling Algorithms for Multiple Earth Observation Satellites Under Uncertainties of Clouds
暂无分享,去创建一个
Erik Demeulemeester | Xuejun Hu | Dishan Qiu | Jin Liu | Jianjiang Wang | Jianjiang Wang | E. Demeulemeester | Dishan Qiu | Jin Liu | Xuejun Hu
[1] Vincenzo Piuri,et al. An optimization approach to the planning of Earth observing satellites , 2004 .
[2] Gilbert Laporte,et al. Maximizing the value of an Earth observation satellite orbit , 2005, J. Oper. Res. Soc..
[3] Al Globus,et al. A Comparison of Techniques for Scheduling Fleets of Earth-Observing Satellites , 2003 .
[4] Imtiaz Ahmad,et al. A metaheuristic algorithm to solve satellite broadcast scheduling problem , 2015, Inf. Sci..
[5] Erik Demeulemeester,et al. A pure proactive scheduling algorithm for multiple earth observation satellites under uncertainties of clouds , 2016, Comput. Oper. Res..
[6] Shi-Chung Chang,et al. Hybrid algorithms for satellite imaging scheduling , 2005, 2005 IEEE International Conference on Systems, Man and Cybernetics.
[7] Thomas Schiex,et al. Russian Doll Search for Solving Constraint Optimization Problems , 1996, AAAI/IAAI, Vol. 1.
[8] Daniel Vanderpooten,et al. Enumeration and interactive selection of efficient paths in a multiple criteria graph for scheduling an earth observing satellite , 2002, Eur. J. Oper. Res..
[9] Fabrizio Marinelli,et al. A Lagrangian heuristic for satellite range scheduling with resource constraints , 2011, Comput. Oper. Res..
[10] Jin Liu,et al. A two-phase scheduling method with the consideration of task clustering for earth observing satellites , 2013, Comput. Oper. Res..
[11] Lloyd Greenwald,et al. ON THE NEED FOR DYNAMIC SCHEDULING OF IMAGING SATELLITES , 2002 .
[12] Giovanni Righini,et al. Planning and scheduling algorithms for the COSMO-SkyMed constellation , 2008 .
[13] Thierry Benoist,et al. Upper bounds for revenue maximization in a satellite scheduling problem , 2004, 4OR.
[14] Jun Li,et al. A data transmission scheduling algorithm for rapid-response earth-observing operations , 2014 .
[15] Grégory Beaumet,et al. FEASIBILITY OF AUTONOMOUS DECISION MAKING ON BOARD AN AGILE EARTH‐OBSERVING SATELLITE , 2011, Comput. Intell..
[16] Sanjay Kumar,et al. Multi-Satellite Scheduling Using Genetic Algorithms , 2004 .
[17] Xiaomin Zhu,et al. Towards dynamic real-time scheduling for multiple earth observation satellites , 2015, J. Comput. Syst. Sci..
[18] Leo Liberti,et al. Branching and bounds tighteningtechniques for non-convex MINLP , 2009, Optim. Methods Softw..
[19] Nicolas Jozefowiez,et al. A multi-objective local search heuristic for scheduling Earth observations taken by an agile satellite , 2015, Eur. J. Oper. Res..
[20] Haibo Wang,et al. Scheduling Earth Observing Satellites with Hybrid Ant Colony Optimization Algorithm , 2009, 2009 International Conference on Artificial Intelligence and Computational Intelligence.
[21] G. Righini. A Mathematical Programming Algorithm for Planning and Scheduling an Earth Observing SAR Constellation , 2006 .
[22] Rui Xu,et al. Priority-based constructive algorithms for scheduling agile earth observation satellites with total priority maximization , 2016, Expert Syst. Appl..
[23] Fatos Xhafa,et al. A Comparison Study on Meta-Heuristics for Ground Station Scheduling Problem , 2014, 2014 17th International Conference on Network-Based Information Systems.
[24] William J. Wolfe,et al. Three Scheduling Algorithms Applied to the Earth Observing Systems Domain , 2000 .
[25] Al Globus,et al. Scheduling Earth Observing Fleets Using Evolutionary Algorithms: Problem Description and Approach , 2002 .
[26] Da-Yin Liao,et al. Imaging Order Scheduling of an Earth Observation Satellite , 2007, IEEE Transactions on Systems, Man, and Cybernetics, Part C (Applications and Reviews).
[27] Nicholas G. Hall,et al. Maximizing the value of a space mission , 1994 .
[28] Minqiang Xu,et al. Rescheduling of observing spacecraft using fuzzy neural network and ant colony algorithm , 2014 .
[29] Djamal Habet. Tabu Search to Solve Real-Life Combinatorial Optimization Problems: A Case of Study , 2009, Foundations of Computational Intelligence.
[30] N. Bataille,et al. DEALING WITH UNCERTAINTY WHEN MANAGING AN EARTH OBSERVATION SATELLITE , 1999 .
[31] Djamal Habet,et al. Solving the selecting and scheduling satellite photographs problem with a consistent neighborhood heuristic , 2004, 16th IEEE International Conference on Tools with Artificial Intelligence.
[32] Gilbert Laporte,et al. A heuristic for the multi-satellite, multi-orbit and multi-user management of Earth observation satellites , 2007, Eur. J. Oper. Res..
[33] Alireza Bagheri,et al. New tabu search heuristic in scheduling earth observation satellites , 2010, 2010 2nd International Conference on Software Technology and Engineering.
[34] Jin-Kao Hao,et al. A “Logic-Constrained” Knapsack Formulation and a Tabu Algorithm for the Daily Photograph Scheduling of an Earth Observation Satellite , 2001, Comput. Optim. Appl..
[35] Wei-Chen Lin,et al. A tabu search algorithm for satellite imaging scheduling , 2004, 2004 IEEE International Conference on Systems, Man and Cybernetics (IEEE Cat. No.04CH37583).
[36] Djamal Habet,et al. Bounding the optimum for the problem of scheduling the photographs of an Agile Earth Observing Satellite , 2010, Comput. Optim. Appl..
[37] Thomas Schiex,et al. Solution Reuse in Dynamic Constraint Satisfaction Problems , 1994, AAAI.
[38] Wei-Cheng Lin,et al. Daily imaging scheduling of an Earth observation satellite , 2003, IEEE Transactions on Systems, Man, and Cybernetics - Part A: Systems and Humans.
[39] Xiaomin Zhu,et al. Dynamic Scheduling for Emergency Tasks on Distributed Imaging Satellites with Task Merging , 2014, IEEE Transactions on Parallel and Distributed Systems.
[40] L. Darrell Whitley,et al. Scheduling Space–Ground Communications for the Air Force Satellite Control Network , 2004, J. Sched..
[41] Cécile Murat,et al. MATHEMATICAL PROGRAMMING FOR EARTH OBSERVATION SATELLITE MISSION PLANNING , 2003 .
[42] Nicolas Zufferey,et al. Graph colouring approaches for a satellite range scheduling problem , 2008, J. Sched..
[43] Virginie Gabrel. Strengthened 0-1 linear formulation for the daily satellite mission planning , 2006, J. Comb. Optim..
[44] Dae-woo Lee,et al. Satellite mission scheduling using genetic algorithm , 2008, 2008 SICE Annual Conference.
[45] Jin-Kao Hao,et al. Upper Bounds for the SPOT 5 Daily Photograph Scheduling Problem , 2003, J. Comb. Optim..
[46] Gérard Verfaillie,et al. How to Manage the New Generation of Agile Earth Observation Satellites , 2007 .
[47] Gérard Verfaillie,et al. Selecting and scheduling observations of agile satellites , 2002 .