A cumulative not-first/not-last filtering algorithm in O(n2log(n))

[1]  Joseph D. Scott,et al.  A quadratic edge-finding filtering algorithm for cumulative resource constraints , 2011, Constraints.

[2]  Armin Wolf,et al.  A New O(n2logn) Not-First/Not-Last Pruning Algorithm for Cumulative Resource Constraints , 2010, CP.

[3]  Petr Vilím,et al.  Edge Finding Filtering Algorithm for Discrete Cumulative Resources in O(kn log n){\mathcal O}(kn {\rm log} n) , 2009, CP.

[4]  Petr Vilím,et al.  Max Energy Filtering Algorithm for Discrete Cumulative Resources , 2009, CPAIOR.

[5]  Petr Vilím,et al.  Global Constraints in Scheduling , 2007 .

[6]  Armin Wolf,et al.  Not-First and Not-Last Detection for Cumulative Scheduling in O(n3logn) , 2005, INAP.

[7]  Edward P. K. Tsang,et al.  Constraint Based Scheduling: Applying Constraint Programming to Scheduling Problems , 2003, J. Sched..

[8]  Pierre Lopez,et al.  On Not-First/Not-Last conditions in disjunctive scheduling , 2000, Eur. J. Oper. Res..

[9]  Philippe Baptiste,et al.  Constraint Propagation and Decomposition Techniques for Highly Disjunctive and Highly Cumulative Project Scheduling Problems , 1997, Constraints.

[10]  Rainer Kolisch,et al.  PSPLIB - A project scheduling problem library: OR Software - ORSEP Operations Research Software Exchange Program , 1997 .

[11]  François Laburthe,et al.  Improved CLP Scheduling with Task Intervals , 1994, ICLP.

[12]  Pascal Van Hentenryck,et al.  Edge Finding for Cumulative Scheduling , 2008, INFORMS J. Comput..

[13]  Philippe Baptiste,et al.  Constraint - based scheduling : applying constraint programming to scheduling problems , 2001 .

[14]  Wpm Wim Nuijten,et al.  Time and resource constrained scheduling : a constraint satisfaction approach , 1994 .