Economic lot scheduling problem in a remanufacturing system with returns at different quality grades
暂无分享,去创建一个
Xu Chen | Hong Sun | Biyu Liu | Weida Chen | Weida Chen | Biyu Liu | Hong Sun | Xu Chen
[1] Xiuli Chao,et al. Optimal Control of Inventory Systems with Multiple Types of Remanufacturable Products , 2011, Manuf. Serv. Oper. Manag..
[2] Lakdere Benkherouf,et al. Optimal Control of Production, Remanufacturing and Refurbishing Activities in a Finite Planning Horizon Inventory System , 2016, J. Optim. Theory Appl..
[3] Erik Sundin,et al. Core (product) Acquisition Management for remanufacturing: a review , 2015 .
[4] D. Schrady. A deterministic inventory model for reparable items , 1967 .
[5] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[6] Ilkyeong Moon,et al. Scheduling economic lot sizes in deteriorating production systems , 2003 .
[7] M. Jaber,et al. The production, remanufacture and waste disposal model with lost sales , 2009 .
[8] Christos Zikopoulos,et al. Remanufacturing lotsizing with stochastic lead-time resulting from stochastic quality of returns , 2017, Int. J. Prod. Res..
[9] Alcides R. Santander-Mercado,et al. The economic lot scheduling problem: a survey , 2016 .
[10] Ioannis Konstantaras,et al. A note on: Developing an exact solution for an inventory system with product recovery , 2008 .
[11] R. Teunter. Economic ordering quantities for recoverable item inventory systems , 2001 .
[12] Ling Lin,et al. Assembly process control method for remanufactured parts with variable quality grades , 2016 .
[13] Mohamad Y. Jaber,et al. Lot sizing for a recoverable product with inspection and sorting , 2010, Comput. Ind. Eng..
[14] Ruud H. Teunter,et al. Economic Lot Scheduling Problem with Returns , 2006 .
[15] Christos Zikopoulos,et al. Joint optimization of manufacturing/remanufacturing lot sizes under imperfect information on returns quality , 2017, Eur. J. Oper. Res..
[16] L. V. Wassenhove,et al. MANAGING PRODUCT RETURNS FOR REMANUFACTURING , 2001 .
[17] Paul H. Zipkin,et al. Foundations of Inventory Management , 2000 .
[18] Shyamal Kumar Mondal,et al. Imperfect production inventory model with production rate dependent defective rate and advertisement dependent demand , 2017, Comput. Ind. Eng..
[19] Erwin van der Laan,et al. Setting the holding cost rates in a two-product system with remanufacturing , 2007 .
[20] Simone Zanoni,et al. Multi-product economic lot scheduling problem with manufacturing and remanufacturing using a basic period policy , 2012, Comput. Ind. Eng..
[21] Hark Hwang,et al. A generalized ordering and recovery policy for reusable items , 2007, Eur. J. Oper. Res..
[22] Chun Su,et al. Buffer allocation for hybrid manufacturing/remanufacturing system considering quality grading , 2014 .
[23] Ou Tang,et al. Heuristics for the economic lot scheduling problem with returns. [In special section on problems and models of inventories selected papers of the fourteenth International symposium on inventories] , 2009 .
[24] Robert Pellerin,et al. Production rate control for stochastic remanufacturing systems , 2008 .
[25] Mark Ferguson,et al. The Value of Quality Grading in Remanufacturing , 2009 .
[26] R. Teunter,et al. On the non-optimality of the average cost approach for inventory models with remanufacturing , 2002 .
[27] K. Inderfurth,et al. How to set the holding cost rates in average cost inventory models with reverse logistics , 2000 .
[28] Ruud H. Teunter,et al. Lot-sizing for inventory systems with product recovery , 2003, Comput. Ind. Eng..
[29] Ilkyeong Moon,et al. A time-varying lot sizes approach for the economic lot scheduling problem with returns , 2016 .
[30] Robert Pellerin,et al. A production rate control policy for stochastic repair and remanufacturing systems , 2009 .
[31] Jack D. Rogers. A Computational Approach to the Economic Lot Scheduling Problem , 1958 .
[32] Tamer Boyacı,et al. The effect of categorizing returned products in remanufacturing , 2004 .
[33] Xiang Li,et al. Optimal acquisition and production policy in a hybrid manufacturing/remanufacturing system with core acquisition at different quality levels , 2014, Eur. J. Oper. Res..
[34] Ruud H. Teunter,et al. Multi-product economic lot scheduling problem with separate production lines for manufacturing and remanufacturing , 2008, Eur. J. Oper. Res..