An ISM approach to analyse interaction between barriers of transition to Flexible Manufacturing System

Manufacturing companies have realised the importance of flexible manufacturing systems (FMS) due to ever changing customer demands and growing international competition. But, implementation of this universally accepted and challenging technology is not an easy task. There are certain barriers which not only influence the implementation process but also influence each other. The purpose of this paper is to identify and analyse these barriers. A questionnaire based survey was conducted to rank these barriers. The results of this survey and Interpretive Structural Modelling (ISM) approach have been used for converging to some key barriers and their managerial implications.

[1]  Hing Kai Chan,et al.  Analysis of dynamic control strategies of an FMS under different scenarios , 2004 .

[2]  Ravi Shankar,et al.  An ant algorithm for the single row layout problem in flexible manufacturing systems , 2005, Comput. Oper. Res..

[3]  Prem Vrat,et al.  Impact of indirect relationships in classification of variables—a micmac analysis for energy conservation , 1990 .

[4]  Sushil,et al.  The objectives of waste management in India: A futures inquiry , 1995 .

[5]  Mustafa Özbayrak,et al.  A knowledge-based decision support system for the management of parts and tools in FMS , 2003, Decis. Support Syst..

[6]  Hing Kai Chan,et al.  A comprehensive survey and future trend of simulation study on FMS scheduling , 2004, J. Intell. Manuf..

[7]  József Váncza,et al.  Automating fixture design—from imitating practice to understanding principles , 1990 .

[8]  F. T. S. Chan *,et al.  Fuzzy goal-programming model with an artificial immune system (AIS) approach for a machine tool selection and operation allocation problem in a flexible manufacturing system , 2005 .

[9]  S. Deshmukh,et al.  Vendor Selection Using Interpretive Structural Modelling (ISM) , 1994 .

[10]  Nebil Buyurgan,et al.  Tool allocation in flexible manufacturing systems with tool alternatives , 2004 .

[11]  Felix T.S. Chan,et al.  A holistic approach to manufacturing cell formation: Incorporation of machine flexibility and machine aggregation , 2004 .

[12]  Kwasi Amoako-Gyampah,et al.  Failure rate distributions for flexible manufacturing systems: An empirical study , 1999, Eur. J. Oper. Res..

[13]  F. Musharavati RECONFIGURABLE MANUFACTURING SYSTEMS , 2010 .

[14]  J. S. Evans STRATEGIC FLEXIBILITY FOR HIGH TECHNOLOGY MANOEUVRES: A CONCEPTUAL FRAMEWORK , 1991 .

[15]  R. Shankar,et al.  An interpretive structural modeling of knowledge management in engineering industries , 2003 .

[16]  Michael J. Shaw Information-Based Manufacturing with the Web , 2000 .

[17]  Felix T.S. Chan,et al.  Ant colony optimization approach to a fuzzy goal programming model for a machine tool selection and operation allocation problem in an FMS , 2006 .

[18]  Mikell P. Groover,et al.  CAD/CAM: Computer-Aided Design and Manufacturing , 1983 .

[19]  Wai-Ki Ching,et al.  Iterative methods for flexible manufacturing systems , 2003, Appl. Math. Comput..

[20]  V. Grover,et al.  An assessment of survey research in POM: from constructs to theory , 1998 .

[21]  Mark Goh,et al.  Production scheduling in a flexible manufacturing system under random demand , 2004, Eur. J. Oper. Res..

[22]  Mansour E. Abou Gamila,et al.  A modeling technique for loading and scheduling problems in FMS , 2003 .

[23]  Kathryn E. Stecke,et al.  Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems , 1983 .

[24]  S. Nagalingam,et al.  Latest developments in CIM , 1999 .

[25]  Sushil,et al.  Scenario building: A critical study of energy conservation in the Indian cement industry , 1992 .

[26]  William A. Miller,et al.  An evolutionary algorithm-based decision support system for managing flexible manufacturing , 2004 .

[27]  Henry Y. K. Lau,et al.  An object-oriented rule-based framework for the specification of flexible manufacturing systems , 1999 .

[28]  Hongnian Yu,et al.  Combined Petri net modelling and AI-based heuristic hybrid search for flexible manufacturing systems-part I: Petri net modelling and heuristic search , 2003 .

[29]  Felix T.S. Chan,et al.  Impact of operation flexibility and dispatching rules on the performance of a flexible manufacturing system , 2004 .

[30]  Z. Irani,et al.  Quantification of flexibility in advanced manufacturing systems using fuzzy concept , 2004 .

[31]  Hing Kai Chan,et al.  Real time fuzzy scheduling rules in FMS , 2003, J. Intell. Manuf..

[32]  John N. Warfield,et al.  Developing Interconnection Matrices in Structural Modeling , 1974, IEEE Trans. Syst. Man Cybern..

[33]  Ludo Gelders,et al.  An age-based replacement policy with non-zero repair times for a continuous production process , 1995 .

[34]  Mahmut Parlar,et al.  A survey of maintenance models for multi-unit systems , 1991 .

[35]  Joseph Sarkis,et al.  An empirical analysis of productivity and complexity for flexible manufacturing systems , 1997 .