A Jackknife technique to estimate the standard deviation in a project risk severity data analysis

In the last years, a project risk analysis has become increasingly important because it has proved to be a valuable tool, e.g., in interpreting project data provided by experimental judgments. Project risk data cannot be answered in a parametric framework easily; moreover, original risk data sizes are too small to estimate the standard deviation of risk data. When parametric modeling and theoretical analysis are difficult, the Jackknife is good alternative to calculate the standard deviation for estimator. Therefore, in this paper, a new approach based on a non-parametric Jackknife technique is proposed to analyze risk data in order to reduce the standard deviation of project risk data. An example of risk data (probability and impact) is used to show the applicability of the proposed technique.

[1]  Rupert G. Miller An Unbalanced Jackknife , 1974 .

[2]  D. Hinkley Jackknifing in Unbalanced Situations , 1977 .

[3]  Stephen Grey,et al.  Project Risk Management Guidelines: Managing Risk in Large Projects and Complex Procurements , 2004 .

[4]  M. H. Quenouille Approximate tests of correlation in time-series 3 , 1949, Mathematical Proceedings of the Cambridge Philosophical Society.

[5]  S. Alborzi,et al.  An analysis of project risks using the non-parametric bootstrap technique , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[6]  B. Efron The jackknife, the bootstrap, and other resampling plans , 1987 .

[7]  B. Efron Bootstrap Methods: Another Look at the Jackknife , 1979 .

[8]  S. M. Mousavi,et al.  A Non-Parametric Statistical Approach for Analyzing Risk Factor Data in Risk Management Process , 2009 .

[9]  John F. MacGregor,et al.  Jackknife and bootstrap methods in the identification of dynamic models , 2001 .

[10]  R. Tibshirani,et al.  An Introduction to the Bootstrap , 1995 .

[11]  M. H. Quenouille NOTES ON BIAS IN ESTIMATION , 1956 .

[12]  S. Ebrahimnejad,et al.  A fuzzy BOT project risk evaluation model in iranian power plant industry , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[13]  M. H. Quenouille Approximate Tests of Correlation in Time‐Series , 1949 .

[14]  Dale F. Cooper Project risk management guidelines : managing risk in large projects and complex procurements , 2005 .

[15]  A. Aminian,et al.  Fuzzy Group Decision Making: A case using FTOPSIS in mega project risk identification and analysis concurrently , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[16]  J. Shao,et al.  A General Theory for Jackknife Variance Estimation , 1989 .

[17]  Robert J. Chapman,et al.  The controlling influences on effective risk identification and assessment for construction design management , 2001 .

[18]  J. U. M. Smith,et al.  Project Risk Management: Processes, Techniques and Insights , 1998, J. Oper. Res. Soc..