Research on Production Scheduling Based on the Production of Logistics Bottleneck

Aiming at the problem of production scheduling in the factory,in order to get the minimization of production delivery time and completion time as the optimization of target.And according to the definition of the bottleneck,the paper took work shop as study object to identify its bottleneck.During the identification process,the maximum equipment utilization was defined as the production logistics bottleneck.At the same time,the genetic algorithm based on the logistics bottleneck was put forward for the scheduler of production system by the method of the path and the process technology segmentation.Finally the superiority of genetic algorithm based on logistics bottleneck in solving large-scale work shop scheduling problems was verified by the example.