Pooling in manufacturing: do opposites attract?

In a stochastic environment pooling naturally leads to economies of scale, but heterogeneity can also create variability. In this article, we investigate this trade-off in the case of a manufacturing environment. Pooling for queueing systems has been widely investigated while much less attention has been given to manufacturing systems where jobs are given a due date upon arrival. In such system it is not the elapsed time until the actual completion of the job that counts, but rather the lead time that can be promised to the customer in order to guarantee a high service level. In this paper, we study the benefits of pooling stochastic systems in such manufacturing setting with multiple customer types. Our results demonstrate that, in stark contrast with what was previously observed in service environments, heterogeneity is generally not deteriorating performance. Furthermore, our analytical and simulation studies reveal that the benefits of pooling in terms of the expected sojourn time can serve as a good prediction for the benefits of pooling on the average due-date lead time in a wide range of situations.

[1]  M. Fleurbaey,et al.  A Theory of Fairness and Social Welfare , 2011 .

[2]  James H. Bookbinder,et al.  Setting Job-Shop Due-Dates with Service-Level Constraints , 1985 .

[3]  Apurva Jain,et al.  Value of capacity pooling in supply chains with heterogeneous customers , 2007, Eur. J. Oper. Res..

[4]  Stephen C. Graves,et al.  Process Flexibility in Supply Chains , 2003, Manag. Sci..

[5]  Koen Decancq,et al.  What do normative indices of multidimensional inequality really measure , 2015 .

[6]  Luc BAUWENS,et al.  Handbook of Volatility Models and Their Applications , 2012 .

[7]  V. Vinod,et al.  Simulation modeling and analysis of due-date assignment methods and scheduling decision rules in a dynamic job shop production system , 2011 .

[8]  Ramandeep S. Randhawa,et al.  Optimal Flexibility Configurations in Newsvendor Networks: Going Beyond Chaining and Pairing , 2010, Manag. Sci..

[9]  T.C.E. Cheng,et al.  Survey of scheduling research involving due date determination decisions , 1989 .

[10]  Saifallah Benjaafar,et al.  Performance bounds for the effectiveness of pooling in multi-processing systems , 1995 .

[11]  Kent Wang,et al.  Can federal reserve policy deviation explain response patterns of financial markets over time , 2013 .

[12]  S. Barman The impact of priority rule combinations on lateness and tardiness , 1998 .

[13]  Jwm Will Bertrand,et al.  A dynamic priority rule for scheduling against due-dates , 1982 .

[14]  John A. Buzacott,et al.  Commonalities in Reengineered Business Processes: Models and Issues , 1996 .

[15]  Avishai Mandelbaum,et al.  On Pooling in Queueing Networks , 1998 .

[16]  Per J. Agrell,et al.  Unobserved Heterogeneous Effects in the Cost Efficiency Analysis of Electricity Distribution Systems , 2013 .

[17]  Y. Nesterov,et al.  First-order methods with inexact oracle: the strongly convex case , 2013 .

[18]  William C. Jordan,et al.  Principles on the benefits of manufacturing process flexibility , 1995 .

[19]  Erik Schokkaert,et al.  Differing types of medical prevention appeal to different individuals , 2013, The European Journal of Health Economics.

[20]  Laurent Massoulié,et al.  Resource pooling in congested networks: proportional fairness and product form , 2009, Queueing Syst. Theory Appl..

[21]  Ananth V. Iyer,et al.  Modeling the Impact of Merging Capacity in Production-Inventory Systems , 2004, Manag. Sci..

[22]  S. Tayur,et al.  Due Date Management Policies , 2004 .

[23]  Christos Koulamas,et al.  Single-machine scheduling with waiting-time-dependent due dates , 2008, Eur. J. Oper. Res..

[24]  Susana Peralta,et al.  Local Taxation of Global Corporations: A Simple Solution , 2013 .

[25]  François Maniquet,et al.  Equality Of Opportunity: The Economics Of Responsibility , 2012 .

[26]  Ward Whitt,et al.  Understanding the Efficiency of Multi-Server Service Systems , 1992 .

[27]  Emre A. Veral Computer simulation of due-date setting in multi-machine job shops , 2001 .

[28]  Jacques-François Thisse,et al.  Economic Geography and the Unequal Development of Regions , 2012 .

[29]  Hubertus Th. Jongen,et al.  On implicit functions in nonsmooth analysis , 2013 .

[30]  N. M. vanDijk,et al.  To Pool or Not to Pool in Call Centers , 2008 .

[31]  Jan A. Van Mieghem,et al.  A Little Flexibility is All You Need : Optimality of Tailored Chaining and Pairing * , 2008 .

[32]  Diwakar Gupta,et al.  Quantifying Operational Synergies in a Merger/Acquisition , 2002, Manag. Sci..

[33]  Wallace J. Hopp,et al.  Quoting manufacturing due dates subject to a service level constraint , 2000 .

[34]  Yurii Nesterov,et al.  Universal gradient methods for convex optimization problems , 2015, Math. Program..

[35]  A. Ruszczynski Stochastic Programming Models , 2003 .

[36]  Michael H. Rothkopf,et al.  Perspectives on Queues: Combining Queues is Not Always Beneficial , 1987, Oper. Res..

[37]  Saifallah Benjaafar,et al.  Machine Sharing in Manufacturing Systems: Total Flexibility versus Chaining , 1998 .

[38]  Saif Benjaafar,et al.  Modeling and analysis of flexible queueing systems , 2004 .

[39]  Saif Benjaafar,et al.  On the Benefits of Pooling in Production-Inventory Systems , 2005, Manag. Sci..

[40]  Lawrence M. Wein,et al.  A broader view of the job-shop scheduling problem , 1992 .

[41]  Xiaoming Li,et al.  Improving delivery reliability by a new due-date setting rule , 2008, Eur. J. Oper. Res..

[42]  Shaler Stidham,et al.  On the Optimality of Single-Server Queuing Systems , 1970, Oper. Res..

[43]  Jacques H. Dreze,et al.  Fiscal Integration and Growth Stimulation in Europe , 2014, Recherches économiques de Louvain.

[44]  W. Whitt,et al.  Resource sharing for efficiency in traffic systems , 1981, The Bell System Technical Journal.

[45]  Wallace J. Hopp,et al.  Pooling strategies for call center agent cross-training , 2009 .

[46]  M. Grabisch,et al.  Anonymous Social Influence , 2013 .

[47]  Pierre M. Picard,et al.  Trade, economic geography and the choice of product quality , 2015 .

[48]  Jing-Sheng Song,et al.  Price, delivery time guarantees and capacity selection , 1998, Eur. J. Oper. Res..

[49]  Thierry Bréchet,et al.  Climate Policies: A Burden, or a Gain? , 2013, SSRN Electronic Journal.

[50]  S. T. Enns,et al.  Lot size optimisation under pooled and unpooled scenarios in batch production system , 2010 .

[51]  M. Grabisch,et al.  Ordered Weighted Averaging in Social Networks , 2012 .

[52]  Lawrence M. Wein,et al.  Due-date Setting and Priority Sequencing in a Multiclass M/G/1 Queue , 2015 .

[53]  E. Schokkaert,et al.  Empirical Social Choice , 2011 .