Albacora Leste Field Development- FPSO P-50 Mooring System Concept and Installation
暂无分享,去创建一个
F.E.N. Brandão | Cecília Henriques | J. B. Araújo | O.C.G. Ferreira | C. dos Santos Amaral | Cecília Henriques | J. B. Araújo | O.C.G. Ferreira | C. Amaral | J. B. Araujo | F. Brandaõ | C.C.D. Henriques | O.C.G. Ferreira
[1] D. True. Undrained vertical penetration into ocean bottom soils , 1976 .
[2] Aldemir Bonfim dos Santos,et al. Improvements Achieved in the Project of FPSO P-50 , 2004 .