Scheduling Technique for Remodeling Project of Inhabited Condition

Abstract This paper presents a scheduling technique that reflects variou s constraints in remodeling project of inhabitedcondition. The remodeling project of inhabited condition is req uired more detailed planning and control due to claimsby noise, vibration, dust, smells, limited lift capacity, and l imited temporary stock area. Because of the constraints,complexity in scheduling is increased and earlier completion is required to reduce the possibility of safety andenvironment accidents. Especially, in case of inhabited conditi on, the scheduling should be linked day-time/night-time/weekend work. This paper proposes a structured scheduling technique to incorporate those constraints inremodeling of inhabited condition. This scheduling technique co nsiders not only remodeling process but alsodismantling, newly-construction, and residents movement. Proces s expression method using MS-Project alsopresented to keep connectivity with existing scheduling system.Keywords :Inhabited Condition, Remodeling, Scheduling