Downtime variability: the impact of duration–frequency on the performance of serial production systems

It is intuitively appealing to measure downtime in terms of total time lost (i.e. frequency times duration). However, the same total downtime can be produced by an infinite number of frequency/duration combinations. This study reports the findings of a computer simulation study on the impact of varying combinations of downtime frequency/duration pairs on performance of serial production systems. The research reported here clearly shows that different downtime frequency/duration combinations affect serial production lines differently even when the total downtime remains equal. Analysis suggests that long duration, infrequently occurring variation has a much more negative impact on system performance than short duration, frequently occurring variation.

[1]  門田 安弘,et al.  Toyota production system : practical approach to production management , 1983 .

[2]  L. E. Davis,et al.  PACING EFFECTS ON MANNED ASSEMBLY LINES , 1965 .

[3]  William L. Maxwell,et al.  The Role of Work-in-Process Inventory in Serial Production Lines , 1988, Oper. Res..

[4]  B. J. Berkley,et al.  A REVIEW OF THE KANBAN PRODUCTION CONTROL RESEARCH LITERATURE , 2009 .

[5]  M. Michael Umble,et al.  Synchronous Manufacturing: Principles for World Class Excellence , 1995 .

[6]  R. Conrad,et al.  The rate of "paced" man-machine systems , 1954 .

[7]  Satya S. Chakravorty,et al.  Does Protective Capacity Assist Managers in Competing Along Time-Based Dimensions? , 1994 .

[8]  J. A. Buzacott,et al.  AUTOMATIC TRANSFER LINES WITH BUFFER STOCKS , 1967 .

[9]  Wallace J. Hopp,et al.  Factory physics : foundations of manufacturing management , 1996 .

[10]  R. Schonberger Japanese manufacturing techniques : nine hidden lessons simplicity , 1982 .

[11]  Gordon C. Hunt,et al.  Sequential Arrays of Waiting Lines , 1956 .

[12]  Satya S. Chakravorty,et al.  A comparative study of line design approaches for serial production systems , 1996 .

[13]  Anthony L. Patti,et al.  A comparison of JIT and TOC buffering philosophies on system performance with unplanned machine downtime , 2008 .

[14]  Lorraine R. Gardiner,et al.  Drum‐Buffer‐Rope and Buffer Management: Impact on Production Management Study and Practices , 1993 .

[15]  J. Little A Proof for the Queuing Formula: L = λW , 1961 .

[16]  Michael A. Zazanis,et al.  Push and Pull Production Systems: Issues and Comparisons , 1992, Oper. Res..

[17]  Richard J. Schonberger Applications of Single-Card and Dual-Card Kanban , 1983 .

[18]  John H. Blackstone,et al.  The evolution of a management philosophy: The theory of constraints , 2007 .

[19]  H. Popper,et al.  The goal. , 1967, Journal of the Mount Sinai Hospital, New York.