The FNAL Injector Upgrade Status

The new FNAL H- injector upgrade is currently being tested before installation in the Spring 2012 shutdown of the accelerator complex. This line consists of an H- source, low energy beam transport (LEBT), 200 MHz RFQ and medium energy beam transport (MEBT). Beam measurements have been performed to validate the design before installation. The results of the beam measurements are presented in this paper.