Proactive Approach for Reducing Non-Value Adding Activities Due to Time-Space Conflicts

Time-space conflicts are one of the major causes of productivity losses at construction sites, and they are preventable and manageable if identified prior to construction. Current industry practice and project management tools and techniques do not support proactive time-space conflict management. Our research focuses on formalizing and automating time-space conflict analysis to assist construction managers to proactively manage spatial conflicts between activities at their sites. In this paper, we describe a case that highlights the challenges involved in time-space conflict analysis and discuss an initial framework showing the factors that determine the schedule impacts of spatial conflicts between activities. Using the presented framework, a construction manager can assess the type of a time-space conflict and predict the schedule impacts of spatial conflicts. Realizing the schedule impacts of time-space conflicts before they occur at a construction site, s/he can proactively manage spatial conflicts between activities and eliminate non-value adding activities that occur at construction sites due to time-space conflicts.

[1]  Yvan J. Beliveau,et al.  SCaRC: Space-Constrained Resource-Constrained Scheduling System , 1997 .

[2]  Gregory A. Howell,et al.  Interaction between subcycles: one key to improved methods , 1993 .

[3]  Iris D. Tommelein,et al.  Space-time characterization for resource management on construction sites , 1992 .

[4]  Victor E. Sanvido,et al.  A Construction Crew Evaluation Model to Improve Productivity , 1995 .

[5]  Iris D. Tommelein,et al.  Space Schedule Construction , 1993 .

[6]  Iris D. Tommelein,et al.  Interactive Dynamic Layout Planning , 1993 .

[7]  Oldrich Stradal,et al.  Time Space Scheduling Method , 1982 .

[8]  Burcu Akinci,et al.  Time-Space Conflict Analysis Based on 4-D Production Models , 1998 .

[9]  James J. O'Brien VPM Scheduling for High-Rise Buildings , 1975 .

[10]  V. Nandakumar Enhancing reliability of project duration forecast , 1984 .

[11]  Jean-Claude Latombe Global Path Planning Approaches for Material Movements in a Worksite , 1989 .

[12]  Yvan J. Beliveau,et al.  Path-Finder: AI-Based Path Planning System , 1992 .

[13]  Charles N. Eastman,et al.  Spatial Synthesis in Computer-Aided Building Design , 1975 .

[14]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .

[15]  Jean-Claude Latombe,et al.  New heuristic algorithms for efficient hierarchical path planning , 1991, IEEE Trans. Robotics Autom..

[16]  George S. Birrell Construction Planning—Beyond the Critical Path , 1980 .

[17]  Yvan J. Beliveau,et al.  Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings , 1994 .