Proactive Approach for Reducing Non-Value Adding Activities Due to Time-Space Conflicts
暂无分享,去创建一个
[1] Yvan J. Beliveau,et al. SCaRC: Space-Constrained Resource-Constrained Scheduling System , 1997 .
[2] Gregory A. Howell,et al. Interaction between subcycles: one key to improved methods , 1993 .
[3] Iris D. Tommelein,et al. Space-time characterization for resource management on construction sites , 1992 .
[4] Victor E. Sanvido,et al. A Construction Crew Evaluation Model to Improve Productivity , 1995 .
[5] Iris D. Tommelein,et al. Space Schedule Construction , 1993 .
[6] Iris D. Tommelein,et al. Interactive Dynamic Layout Planning , 1993 .
[7] Oldrich Stradal,et al. Time Space Scheduling Method , 1982 .
[8] Burcu Akinci,et al. Time-Space Conflict Analysis Based on 4-D Production Models , 1998 .
[9] James J. O'Brien. VPM Scheduling for High-Rise Buildings , 1975 .
[10] V. Nandakumar. Enhancing reliability of project duration forecast , 1984 .
[11] Jean-Claude Latombe. Global Path Planning Approaches for Material Movements in a Worksite , 1989 .
[12] Yvan J. Beliveau,et al. Path-Finder: AI-Based Path Planning System , 1992 .
[13] Charles N. Eastman,et al. Spatial Synthesis in Computer-Aided Building Design , 1975 .
[14] H. W. Parker,et al. Productivity improvement in construction , 1988 .
[15] Jean-Claude Latombe,et al. New heuristic algorithms for efficient hierarchical path planning , 1991, IEEE Trans. Robotics Autom..
[16] George S. Birrell. Construction Planning—Beyond the Critical Path , 1980 .
[17] Yvan J. Beliveau,et al. Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings , 1994 .