Selection of the Most Appropriate Off-Grid Hybrid System for Rural and Coastal Areas in Bangladesh Using Analytical Hierarchy Process (AHP)

The objective of this study is to select the most appropriate hybrid system for reliable and affordable electricity generation for sustainable development. To reach this goal Analytical Hierarchy Process (AHP) model was applied. The methodology was developed and applied considering experts and stakeholder’s judgment based on six criteria such as resource availability, Net Present Cost (NPC), Cost of Electricity (COE), Technical, Environmental and social to determine and prioritize the best alternative among PV-Battery-Wind-Diesel, PV-Battery-Diesel, Wind-Battery-Diesel and PV-Wind-Battery. After the experts and stakeholder’s pair-wise comparison and considering relative weights the most prioritized hybrid system measured is PV-Battery-Wind-Diesel by receiving 31.49% priority. Later an environmental analysis showed that emission from the selected system is around 52% less, compared if, the electricity drawn from the national grid. The second most prioritized system is PV-Wind-battery. Although it is totally environment friendly but due to the magnitude of the alternative resources it cannot reach the goal. In addition, ranking and prioritizing outcomes of these hybrid systems can be implemented in renewable energy policy as a long-term rural electrification plan.

[1]  M. F. Rahman,et al.  Prospects of wind energy in Bangladesh , 1996 .

[2]  Zohrul Kabir,et al.  SELECTION OF RENEWABLE ENERGY SOURCES USING ANALYTIC HIERARCHY PROCESS , 2003 .

[3]  M. Bohanec,et al.  The Analytic Hierarchy Process , 2004 .

[4]  M. J. Khan,et al.  A wind map of Bangladesh , 2004 .

[5]  N. H. Ravindranath,et al.  2006 IPCC Guidelines for National Greenhouse Gas Inventories , 2006 .

[6]  Ishani Mukherjee,et al.  Operational guidance for World Bank Group staff : designing sustainable off-grid rural electrification projects - principles and practices , 2008 .

[7]  T. Daim,et al.  Selection of Renewable Energy Technologies for a Developing County: A Case of Pakistan , 2011 .

[8]  A. K. M. Sadrul Islam,et al.  Application of Wind Resource Assessment (WEA) Tool: A case study in Kuakata, Bangladesh , 2011 .

[9]  A. K. M. Sadrul Islam,et al.  Potential and viability of grid-connected solar PV system in Bangladesh , 2011 .

[10]  Md. Shazib Uddin,et al.  A Feasibility Study of Solar-Wind-Diesel Hybrid System in Rural and Remote Areas of Bangladesh , 2013 .

[11]  A. Azeem,et al.  Selection of the most appropriate package of Solar Home System using Analytic Hierarchy Process model in rural areas of Bangladesh , 2013 .

[12]  Sonali Goel,et al.  Cost Analysis of Solar/Wind/Diesel Hybrid Energy Systems for Telecom Tower by Using HOMER , 2014 .

[13]  Raihan Sayeed Khan,et al.  The Technical and Economic Study of Solar-Wind Hybrid Energy System in Coastal Area of Chittagong, Bangladesh , 2015 .

[14]  M. Joardder,et al.  Energy scarcity and potential of renewable energy in Bangladesh , 2015 .