DEVELOPMENT OF PRODUCTIVE SYSTEM UTILIZING STEEL BEAM-PRECAST PRC PILE AND SURFACE SOIL IMPROVEMENT
暂无分享,去创建一个
Authors developed productive system utilizing pre-cast PRC piles, which system is the one-story buildings limitation. On this system pile are driven into the under soil upto the over ground, and integrated columns of the first floor. We can reduce environmental load, particularly since this system can omit footings and foundation garter, that are consequent on soil disposal for earth work, and material consumption for concreting such as reinforcement and formwork.