Parametric analysis of Mixed-Model Assembly Lines using max-plus algebra
暂无分享,去创建一个
[1] Nils Boysen,et al. Sequencing mixed-model assembly lines to minimise the number of work overload situations , 2011 .
[2] Mikell P. Groover,et al. Automation, Production Systems, and Computer-Integrated Manufacturing , 1987 .
[3] Yu-Chi Ho,et al. Introduction to special issue on dynamics of discrete event systems , 1989, Proc. IEEE.
[4] J. Quadrat,et al. A linear-system-theoretic view of discrete-event processes , 1983, The 22nd IEEE Conference on Decision and Control.
[5] H. Lorenz,et al. Jena Research Papers in Business and Economics Sequencing Mixed-Model Assembly Lines : Survey , Classification and Model Critique , 2007 .
[6] Yeongho Kim,et al. A genetic alorithm for multiple objective sequencing problems in mixed model assembly lines , 1998 .
[7] Bart De Schutter,et al. Model predictive control for max-plus-linear discrete event systems , 2001, Autom..
[8] Nils Boysen,et al. Assembly line balancing: Which model to use when? , 2006 .
[9] Jean-Louis Boimond,et al. Just in Time Control of Constrained (max,+)-Linear Systems , 2007, Discret. Event Dyn. Syst..
[10] 延原 肇. Bernd Heidergott, Olsder Jan Geert, and Jacob van der Woude著, Max Plus at Work-Modeling and Analysis of Synchronized Systems : A Course on Max-Plus Algebra and Its Applications, 出版社:Princeton Univ Press, ISBN:0691117632, 発行日:2005年11月, 第1版, 213p, 6,395円(参考価格) , 2006 .
[11] G. Ranga Janardhana,et al. Modular modelling and performance evaluation of manufacturing systems using Max–Plus Algebra , 2009 .
[12] M. Tan,et al. Timed event graph-based cyclic reconfigurable flow shop modelling and optimization , 2007 .
[13] Hadi Gökçen,et al. Binary integer formulation for mixed-model assembly line balancing problem , 1998 .
[14] A. Imaev,et al. Hierarchial modeling of manufacturing systems using max-plus algebra , 2008, 2008 American Control Conference.
[15] A. Di Febbraro,et al. Performance optimization in manufacturing systems by use of max-plus algebraic techniques , 1994, Proceedings of IEEE International Conference on Systems, Man and Cybernetics.
[16] Jochen Deuse,et al. Systematic procedure for leveling of low volume and high mix production , 2013 .
[17] J. Miltenberg,et al. Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .
[18] Nick T. Thomopoulos,et al. Line Balancing-Sequencing for Mixed-Model Assembly , 1967 .
[19] Avraham Shtub,et al. An analytic framework for sequencing mixed model assembly lines , 1992 .
[20] Mohsen Salehi,et al. Sequencing the mixed-model assembly line to minimize the total utility and idle costs with variable launching interval , 2009 .
[21] Parviz Fattahi,et al. Sequencing Mixed-Model Assembly Line under a JIT-Approach , 2011 .
[22] Mohammad Kamal Uddin,et al. An integrated approach to mixed‐model assembly line balancing and sequencing , 2010 .
[23] Geert Jan Olsder,et al. Max Plus at Work: Modeling and Analysis of Synchronized Systems: A Course on Max-Plus Algebra and Its Applications , 2005 .
[24] Kurt Matyas,et al. Combination of planning methods in a comprehensive production planning approach for sequenced production lines , 2012 .
[25] George Chryssolouris,et al. Assembly system design and operations for product variety , 2011 .