Parametric analysis of Mixed-Model Assembly Lines using max-plus algebra

Abstract Mixed-Model Assembly Lines (MMALs) are widely used in industries where high variety of products is required in addition to low cost and high responsiveness. When a certain product mix is demanded and different variants require different assembly times on different stations, the sequence of variants on the line highly affects the line performance. Although assembly tasks in MMALs are usually manual, most sequencing algorithms assume deterministic times for these tasks rendering the obtained results unreliable. Max-plus algebra is a mathematical tool that can model discrete event systems in linear equations analogous to traditional state space dynamic equations. Modeling MMALs with max-plus equations would enable comparing sequences over ranges of values of assembly times thus increasing the robustness and reliability of obtained results. MMALs with both closed and open stations are modeled using max-plus algebra and the produced models are used to compare possible sequences and to analyze various performance measures of the lines while varying some system parameters. Two numerical examples are presented to demonstrate different analyses that can be performed using the developed model. In the first example, three possible sequences where compared and regions of optimality for each sequence determined. In the second example, the effect of changing launching rate of work units on line performance is studied.

[1]  Nils Boysen,et al.  Sequencing mixed-model assembly lines to minimise the number of work overload situations , 2011 .

[2]  Mikell P. Groover,et al.  Automation, Production Systems, and Computer-Integrated Manufacturing , 1987 .

[3]  Yu-Chi Ho,et al.  Introduction to special issue on dynamics of discrete event systems , 1989, Proc. IEEE.

[4]  J. Quadrat,et al.  A linear-system-theoretic view of discrete-event processes , 1983, The 22nd IEEE Conference on Decision and Control.

[5]  H. Lorenz,et al.  Jena Research Papers in Business and Economics Sequencing Mixed-Model Assembly Lines : Survey , Classification and Model Critique , 2007 .

[6]  Yeongho Kim,et al.  A genetic alorithm for multiple objective sequencing problems in mixed model assembly lines , 1998 .

[7]  Bart De Schutter,et al.  Model predictive control for max-plus-linear discrete event systems , 2001, Autom..

[8]  Nils Boysen,et al.  Assembly line balancing: Which model to use when? , 2006 .

[9]  Jean-Louis Boimond,et al.  Just in Time Control of Constrained (max,+)-Linear Systems , 2007, Discret. Event Dyn. Syst..

[10]  延原 肇 Bernd Heidergott, Olsder Jan Geert, and Jacob van der Woude著, Max Plus at Work-Modeling and Analysis of Synchronized Systems : A Course on Max-Plus Algebra and Its Applications, 出版社:Princeton Univ Press, ISBN:0691117632, 発行日:2005年11月, 第1版, 213p, 6,395円(参考価格) , 2006 .

[11]  G. Ranga Janardhana,et al.  Modular modelling and performance evaluation of manufacturing systems using Max–Plus Algebra , 2009 .

[12]  M. Tan,et al.  Timed event graph-based cyclic reconfigurable flow shop modelling and optimization , 2007 .

[13]  Hadi Gökçen,et al.  Binary integer formulation for mixed-model assembly line balancing problem , 1998 .

[14]  A. Imaev,et al.  Hierarchial modeling of manufacturing systems using max-plus algebra , 2008, 2008 American Control Conference.

[15]  A. Di Febbraro,et al.  Performance optimization in manufacturing systems by use of max-plus algebraic techniques , 1994, Proceedings of IEEE International Conference on Systems, Man and Cybernetics.

[16]  Jochen Deuse,et al.  Systematic procedure for leveling of low volume and high mix production , 2013 .

[17]  J. Miltenberg,et al.  Level schedules for mixed-model assembly lines in just-in-time production systems , 1989 .

[18]  Nick T. Thomopoulos,et al.  Line Balancing-Sequencing for Mixed-Model Assembly , 1967 .

[19]  Avraham Shtub,et al.  An analytic framework for sequencing mixed model assembly lines , 1992 .

[20]  Mohsen Salehi,et al.  Sequencing the mixed-model assembly line to minimize the total utility and idle costs with variable launching interval , 2009 .

[21]  Parviz Fattahi,et al.  Sequencing Mixed-Model Assembly Line under a JIT-Approach , 2011 .

[22]  Mohammad Kamal Uddin,et al.  An integrated approach to mixed‐model assembly line balancing and sequencing , 2010 .

[23]  Geert Jan Olsder,et al.  Max Plus at Work: Modeling and Analysis of Synchronized Systems: A Course on Max-Plus Algebra and Its Applications , 2005 .

[24]  Kurt Matyas,et al.  Combination of planning methods in a comprehensive production planning approach for sequenced production lines , 2012 .

[25]  George Chryssolouris,et al.  Assembly system design and operations for product variety , 2011 .