The present paper proposes the development of a virtual model simulating an assembly line. Starting from the analysis of the real line, through an incremental approach, a simulation model is created, verified and validated, in order to obtain useful information about:
• productive capacity;
• partial and total lead time;
• Percentage of saturation, Value Added (VA) and Non-Value Added (NVA), for each worker and station.
During the development phase, an important goal has been pursued: the possibility to use and change the model without knowing the creation logic. It is possible to change input parameters through simple tables, which contain times of man-machine operations. You can easily set times in order to move an operation from one station to another or to add/delete a job in a station, according to the technological and ergonomic constraints of the process.
Moreover, the acquisition of scheduling data is extremely easy and starts from the generation of a list of production codes related to different work-cycles.
[1]
Fabio De Felice,et al.
Operating Planning of Production in a Mechanical Industry through Simulation Techniques
,
1998,
ESM.
[2]
Fabrizio Dallari,et al.
Rinnovare la Supply Chain
,
2003
.
[3]
R. P. Davis,et al.
Flexible manufacturing systems: Characteristics and assessment
,
1987
.
[4]
Saifallah Benjaafar.
Intelligent simulation for flexible manufacturing systems: an integrated approach
,
1992
.
[5]
Ivar Jacobson,et al.
The unified modeling language reference manual
,
2010
.
[6]
MengChu Zhou,et al.
Augmented timed petri nets for modeling, simulation, and analysis of robotic systems with breakdowns
,
1994
.
[7]
Averill M. Law,et al.
Simulation Modeling & Analysis
,
1991
.
[8]
K. D. Tocher,et al.
The art of simulation
,
1967
.
[9]
Averill M. Law,et al.
Simulation Modeling and Analysis
,
1982
.