SCHEDULING OF HEAD-SENSITIVE CASCADED HYDRO SYSTEMS : A COMPARISON BASED ON NUMERICAL SIMULATION RESULTS
暂无分享,去创建一个
[1] J. Barquin,et al. Under-relaxed iterative procedure for feasible short-term scheduling of a hydro chain , 2003, 2003 IEEE Bologna Power Tech Conference Proceedings,.
[2] Christiano Lyra,et al. A multiobjective approach to the short-term scheduling of a hydroelectric power system , 1995 .
[3] Peter B. Luh,et al. An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraints , 1997 .
[4] D. Sjelvgren,et al. Mixed-integer programming applied to short-term planning of a hydro-thermal system , 1995, Proceedings of Power Industry Computer Applications Conference.
[5] Luís Ferreira,et al. Planificación de la Operación de Corto Plazo de Sistemas de Energía Hidroeléctrica , 2006 .
[6] Antonio J. Conejo,et al. Self-Scheduling of a Hydro Producer in a Pool-Based Electricity Market , 2002, IEEE Power Engineering Review.
[7] J. Waight,et al. Experiences with Mixed Integer Linear Programming-Based Approaches in Short-Term Hydro Scheduling , 2001, IEEE Power Engineering Review.
[8] Allen J. Wood,et al. Power Generation, Operation, and Control , 1984 .
[9] Luís Ferreira,et al. Short-term resource scheduling in multi-area hydrothermal power systems , 1989 .
[10] A.I. Cohen,et al. Optimization-based methods for operations scheduling , 1987, Proceedings of the IEEE.
[11] G. Sheblé,et al. Power generation operation and control — 2nd edition , 1996 .
[12] Xiaohong Guan,et al. Scheduling hydro power systems with restricted operating zones and discharge ramping constraints , 1999 .
[13] O. Nilsson,et al. Mixed-integer programming applied to short-term planning of a hydro-thermal system , 1995 .
[14] M. Piekutowski,et al. Optimal short-term scheduling for a large-scale cascaded hydro system , 1993 .
[15] Xiaohong Guan,et al. Scheduling hydrothermal power systems with cascaded and head-dependent reservoirs , 1999 .