Game theoretic modelling of the integrated production and preventive maintenance scheduling problem in permutation flowshops
暂无分享,去创建一个
[1] Garrison W. Greenwood,et al. Workforce-constrained Preventive Maintenance Scheduling Using Evolution Strategies , 2000, Decis. Sci..
[2] Herbert Hamers,et al. Proportionate flow shop games , 2006, J. Sched..
[3] Xingsheng Gu,et al. Research on Flow Shop Scheduling Problem with Multi-customer and Fuzzy Due Date Based on Non-cooperative Games , 2008, 2008 IEEE International Symposium on Knowledge Acquisition and Modeling Workshop.
[4] Hideo Tanaka,et al. Genetic algorithms for flowshop scheduling problems , 1996 .
[5] Noureddine Zerhouni,et al. Joint scheduling of jobs and Preventive Maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies , 2011, Int. J. Manuf. Res..
[6] É. Taillard. Some efficient heuristic methods for the flow shop sequencing problem , 1990 .
[7] Chengbin Chu,et al. A survey of scheduling with deterministic machine availability constraints , 2010, Comput. Ind. Eng..
[8] Rubén Ruiz,et al. Considering scheduling and preventive maintenance in the flowshop sequencing problem , 2007, Comput. Oper. Res..
[9] Günter Schmidt,et al. Scheduling with limited machine availability , 2000, Eur. J. Oper. Res..
[10] Fatima Benbouzid-Si Tayeb,et al. Towards an artificial immune system for scheduling jobs and preventive maintenance operations in flowshop problems , 2014, 2014 IEEE 23rd International Symposium on Industrial Electronics (ISIE).
[11] Ravi Sethi,et al. The Complexity of Flowshop and Jobshop Scheduling , 1976, Math. Oper. Res..
[12] Fatima Benbouzid-Sitayeb,et al. An ant colony optimisation approach considering jointly scheduling and preventive maintenance in the flowshop sequencing problem , 2010 .
[13] Inyong Ham,et al. A heuristic algorithm for the m-machine, n-job flow-shop sequencing problem , 1983 .
[14] Mostafa Zandieh,et al. Incorporating periodic preventive maintenance into flexible flowshop scheduling problems , 2011, Appl. Soft Comput..
[15] Éric D. Taillard,et al. Benchmarks for basic scheduling problems , 1993 .
[16] R. Barlow,et al. Optimum Preventive Maintenance Policies , 1960 .
[17] Xingsheng Gu,et al. Research on no-wait flow shop scheduling problem with fuzzy due date based on evolution games , 2009, 2009 2nd IEEE International Conference on Computer Science and Information Technology.
[18] Herbert Hamers,et al. Sequencing games : A survey , 2002 .
[19] N. Zerhouni,et al. An integrated ACO approach for the joint production and preventive maintenance scheduling problem in the flowshop sequencing problem , 2008, 2008 IEEE International Symposium on Industrial Electronics.
[20] Liang Gao,et al. Application of game theory based hybrid algorithm for multi-objective integrated process planning and scheduling , 2012, Expert Syst. Appl..