Optimal production planning in pull flow lines with multiple products
暂无分享,去创建一个
[1] Qing Zhang,et al. Hierarchical Decision Making in Stochastic Manufacturing Systems , 1994 .
[2] Paul H. Zipkin. Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem , 1991, Oper. Res..
[3] Suresh P. Sethi,et al. Optimal Production Planning in a Multi-Product Stochastic Manufacturing System with Long-Run Average Cost , 1998, Discret. Event Dyn. Syst..
[4] S. Elmaghraby. The Economic Lot Scheduling Problem (ELSP): Review and Extensions , 1978 .
[5] Hong Chen,et al. Dynamic Scheduling of a Multiclass Fluid Network , 1993, Oper. Res..
[6] Suresh P. Sethi,et al. Stability of Real-Time Lot Scheduling Policies for an Unreliable Machine , 1992 .
[7] J. R. Perkins,et al. Optimal control of pull manufacturing systems , 1995 .
[8] Stanley B. Gershwin,et al. Manufacturing Systems Engineering , 1993 .
[9] Qing Zhang,et al. Optimal Production Planning in a Stochastic Manufacturing System with Long-Run Average Cost , 1997 .
[10] Suresh P. Sethi,et al. Optimal Feedback Controls in Deterministic Dynamic Two-Machine Flowshops , 1996, Oper. Res. Lett..
[11] W. Fleming,et al. Controlled Markov processes and viscosity solutions , 1992 .
[12] Houmin Yan,et al. Using stochastic optimization to determine threshold values for the control of unreliable manufacturing systems , 1994 .
[13] Rajan Suri,et al. On using continuous flow lines for performance estimation of discrete production lines , 1991, 1991 Winter Simulation Conference Proceedings..