Proposed System for Measuring Project Performance Using Process-Based Key Performance Indicators

Despite some evidence of its usefulness, performance measurement by using Key Performance Indicators (KPIs) in the construction industry also has its critics. Among the shortcomings attributed to existing KPIs is the fact that almost all of them are product oriented. This means that the indicators are mostly used for review purposes after a project is completed and do not provide the opportunity to control the work whilst the project is still in progress. Many researchers have agreed on the need for a new approach that considers the construction process and allows active control. This paper describes the design of a proposed generic system for measuring process performance. As a basis for measuring process performance, the proposed measurement system relies on a series of questions related to both process completeness and process quality. The structure of the measurement system is on the basis of the findings of an earlier stage of the research that had resulted in the development of a number of process-based KPIs and the key issues they encompass. The appropriateness of the proposed measurement system has been tested on two on-going projects. The testing has shown that the proposed system produces relatively accurate indications of actual performance of construction projects. In this research, it was not possible to test the validity or the effectiveness of the proposed measurement system for control in practice. This is because of the long timescales involved in real-life projects and because of the possible influence of control actions taken by project management between the various processes

[1]  Saad H.S. Al-Jibouri,et al.  Identifying key performance indicators for use in control of pre‐project stage process in construction , 2009 .

[2]  A. Sivathanu Pillai,et al.  Performance measurement of R&D projects in a multi-project, concurrent engineering environment , 2002 .

[3]  Fiorenzo Franceschini,et al.  Service quality monitoring by performance indicators: a proposal for a structured methodology , 2009 .

[4]  Carlos T. Formoso,et al.  Improving Performance Through Measurement: The Application of Lean Production and Organisational Learning Principles , 2000 .

[5]  R. Kaplan,et al.  The Balanced Scorecard: Translating Strategy into Action , 1996 .

[6]  Mike Hoxley,et al.  Measuring UK construction professional service quality: the what, how, when and who , 2000 .

[7]  Karen Manley Brite report 2003 , 2003 .

[8]  Rainer Feurer,et al.  Strategy formulation: a learning methodology , 1995 .

[9]  Qiming Li,et al.  Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money , 2009 .

[10]  Kerry London,et al.  Construction Management: New Directions , 2002 .

[11]  Chimay J. Anumba,et al.  A Taxonomy for Communication Facets in Concurrent Life‐Cycle Design and Construction , 1999 .

[12]  Ghassan Aouad,et al.  Performance management in construction: a conceptual framework , 2001 .

[13]  Albert P.C. Chan,et al.  Key performance indicators for measuring construction success , 2004 .

[14]  K Sinthawanarong Measuring construction performance using a comprehensive approach , 2000 .

[15]  Peter Kueng,et al.  Process performance measurement system: A tool to support process-based organizations , 2000 .

[16]  Steven Davis,et al.  Lessons Learnt in Developing Effective Performance Measures for Construction Safety Management , 2004 .

[17]  Andy Neely,et al.  Designing performance measures: a structured approach , 1997 .

[18]  Xiaohua Jin,et al.  Relationship‐based determinants of building project performance in China , 2007 .

[19]  Andrew D.F. Price,et al.  Performance Measurement in Construction , 2004 .

[20]  T. Thorpe,et al.  KPIs: a critical appraisal of their use in construction , 2004 .

[21]  Dayana Bastos Costa,et al.  Performance Measurement Systems for Benchmarking in the Construction Industry , 2004 .

[22]  Shlomo Globerson,et al.  Issues in developing a performance criteria system for an organization , 1985 .

[23]  R. Edward Minchin,et al.  Management of Construction Firm Performance Using Benchmarking , 2007 .

[24]  Raja R. A. Issa,et al.  Management’s Perception of Key Performance Indicators for Construction , 2003 .

[25]  Peter E.D. Love,et al.  BENCHMARKING, BENCHACTION, AND BENCHLEARNING: REWORK MITIGATION IN PROJECTS , 2003 .