Formalization and Automation of Time-Space Conflict Analysis
暂无分享,去创建一个
[1] David R. Riley,et al. Space Planning for Mechanical, Electrical, Plumbing and Fire Protection Trades in Multi-story Building Construction , 1997 .
[2] V. Nandakumar. Enhancing reliability of project duration forecast , 1984 .
[3] Averill M. Law,et al. Simulation Modeling and Analysis , 1982 .
[4] Burcu Akinci,et al. Representing Work Spaces Generically in Construction Method Models , 2002 .
[5] Ming C. Lin,et al. Collision Detection between Geometric Models: A Survey , 1998 .
[6] Gregory A. Howell,et al. Factors affecting project success in the piping function , 1997 .
[7] Iris D. Tommelein,et al. Time-space tradeoff strategies for space-schedule construction , 1994 .
[8] Jed Hartman,et al. The VRML 2.0 handbook - building moving worlds on the web , 1996 .
[9] William J. Clancey,et al. Heuristic Classification , 1986, Artif. Intell..
[10] Burcu Akinci,et al. Time-Space Conflict Analysis Based on 4-D Production Models , 1998 .
[11] Martin Fischer,et al. Automated Generation of Work Spaces Required by Construction Activities , 2002 .
[12] Iris D. Tommelein,et al. Exchanging layout and schedule data in a real-time distributed environment , 1993 .
[13] Yvan J. Beliveau,et al. Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings , 1994 .
[14] Burcu Akinci,et al. 4-D Workplanner: A Prototype System for Automated Generation of Construction Spaces and Analysis of Time-Space Conflicts , 2000 .
[15] H. W. Parker,et al. Productivity improvement in construction , 1988 .