Formalization and Automation of Time-Space Conflict Analysis

With increasing pressure for shorter delivery schedules, space is a critical resource at construction sites. Current industry practice lacks a formalized approach or tool to help project managers analyze spatial conflicts between activities prior to construction. Consequently, time-space conflicts occur frequently and significantly impact construction processes. Time-space conflicts have three characteristics that impede the detection and analysis of time-space conflicts prior to construction: (1) They have a temporal aspect; (2) they have different forms creating different problems; and (3) multiple types of spatial conflicts can exist between a pair of conflicting activities. This research formalizes time-space conflict analysis as a classification task and addresses these challenges by automatically (1) detecting conflicts in four dimensions; (2) categorizing the conflicts according to a taxonomy of time-space conflicts that is developed; and (3) prioritizing the multiple types of conflicts between the...

[1]  David R. Riley,et al.  Space Planning for Mechanical, Electrical, Plumbing and Fire Protection Trades in Multi-story Building Construction , 1997 .

[2]  V. Nandakumar Enhancing reliability of project duration forecast , 1984 .

[3]  Averill M. Law,et al.  Simulation Modeling and Analysis , 1982 .

[4]  Burcu Akinci,et al.  Representing Work Spaces Generically in Construction Method Models , 2002 .

[5]  Ming C. Lin,et al.  Collision Detection between Geometric Models: A Survey , 1998 .

[6]  Gregory A. Howell,et al.  Factors affecting project success in the piping function , 1997 .

[7]  Iris D. Tommelein,et al.  Time-space tradeoff strategies for space-schedule construction , 1994 .

[8]  Jed Hartman,et al.  The VRML 2.0 handbook - building moving worlds on the web , 1996 .

[9]  William J. Clancey,et al.  Heuristic Classification , 1986, Artif. Intell..

[10]  Burcu Akinci,et al.  Time-Space Conflict Analysis Based on 4-D Production Models , 1998 .

[11]  Martin Fischer,et al.  Automated Generation of Work Spaces Required by Construction Activities , 2002 .

[12]  Iris D. Tommelein,et al.  Exchanging layout and schedule data in a real-time distributed environment , 1993 .

[13]  Yvan J. Beliveau,et al.  Modeling Work Space to Schedule Repetitive Floors in Multistory Buildings , 1994 .

[14]  Burcu Akinci,et al.  4-D Workplanner: A Prototype System for Automated Generation of Construction Spaces and Analysis of Time-Space Conflicts , 2000 .

[15]  H. W. Parker,et al.  Productivity improvement in construction , 1988 .