An improved instrumentation method for PHC piles
暂无分享,去创建一个
Nie Rusong | Y. Frank Chen | Wuming Leng | Yang Qi | Wu-ming Leng | Yang Qi | Nie Rusong | Y. Chen
[1] John P. Turner,et al. Drilled Shafts: Construction Procedures and LRFD Design Methods: NHI Course No. 132014:Geotechnical Engineering Circular No. 10 , 2010 .
[2] Qi Yang,et al. Experimental measurement of dynamic load parameters for pier pile caps of high-speed railway bridges , 2017 .
[3] Kazunori Tabe,et al. A Transparent Water-Based Polymer for Simulating Multiphase Flow , 2010 .
[4] Frank Rausche,et al. DESIGN AND CONSTRUCTION OF DRIVEN PILE FOUNDATIONS - VOLUME I , 1997 .
[5] Richard J. Jardine,et al. Field axial cyclic loading experiments on piles driven in sand , 2012 .
[6] Rodrigo Salgado,et al. Load Testing of a Closed-Ended Pipe Pile Driven in Multilayered Soil , 2009 .
[7] L. G. Tham,et al. Behaviour of jacked and driven piles in sandy soil , 2006 .
[8] J. Briaud,et al. Cyclic axial loads on piles: Analysis of existing data , 1986 .
[9] Daniele Inaudi,et al. Pile Monitoring with Fiber Optic Sensors During Axial Compression, Pullout, and Flexure Tests , 2002 .
[10] F. Rocher-Lacoste,et al. Effect of Cyclic Axial Loading on the Distribution of Load along a Pile , 2012 .
[11] John Dunnicliff,et al. Geotechnical Instrumentation for Monitoring Field Performance , 1988 .