On the effect of downtime costs and budget constraint on preventive and replacement policies
暂无分享,去创建一个
[1] David J. Edwards,et al. Modelling the magnitude of plant downtime: a tool for improving plant operations management , 2001 .
[2] A. Saltelli,et al. Reliability Engineering and System Safety , 2008 .
[3] Haldun Cor. Using Simulation to Quantify the Impacts of Changes In Construction Work , 1998 .
[4] David J. Edwards,et al. A model for predicting plant maintenance costs , 2000 .
[5] A. K. S. Jardine,et al. Maintenance, Replacement, and Reliability , 2021 .
[6] Serge Fougerousse,et al. Pratique de la maintenance industrielle par le coût global , 1992 .
[7] Rommert Dekker,et al. On the impact of optimisation models in maintenance decision making: the state of the art , 1998 .
[8] J. Jeon,et al. The development of a hybrid intelligent maintenance optimisation system (HIMOS) , 2001, J. Oper. Res. Soc..
[9] Nikolaos V. Sahinidis,et al. Global optimization of mixed-integer nonlinear programs: A theoretical and computational study , 2004, Math. Program..
[10] Kari Komonen,et al. A cost model of industrial maintenance for profitability analysis and benchmarking , 2002 .
[11] David Arditi,et al. Innovation in construction equipment and its flow into the construction industry , 1997 .
[12] Gianpaolo Pulcini,et al. Inference and test in modeling the failure/repair process of repairable mechanical equipments , 2000, Reliab. Eng. Syst. Saf..
[13] Sebastian Martorell,et al. Age-dependent reliability model considering effects of maintenance and working conditions , 1999 .
[14] Moonseo Park,et al. Downtime model development for construction equipment management , 2004 .
[15] Rommert Dekker,et al. A Dynamic Policy for Grouping Maintenance Activities , 1997 .
[16] Hongzhou Wang,et al. A survey of maintenance policies of deteriorating systems , 2002, Eur. J. Oper. Res..
[17] Jesus M. de la Garza,et al. CONSEQUENTIAL EQUIPMENT COSTS ASSOCIATED WITH LACK OF AVAILABILITY AND DOWNTIME , 1990 .
[18] Zane Windsor Mitchell,et al. A Statistical Analysis Of Construction Equipment Repair Costs Using Field Data & The Cumulative Cost Model. , 1998 .
[19] Michael C. Vorster,et al. Model for retiring replacing or reassigning construction equipment , 1987 .
[20] Rommert Dekker,et al. A review of multi-component maintenance models with economic dependence , 1997, Math. Methods Oper. Res..
[21] Jaime Ortega Palma,et al. Optimal replacement and overhaul decisions with imperfect maintenance and warranty contracts , 2006 .
[22] V. Pathmanathan. Construction Equipment Downtime Costs , 1980 .
[23] Rolando Quintana,et al. Increasing the effectiveness and cost‐efficiency of corrective maintenance using relay‐type assignment , 2002 .
[24] Joseph D. Novak,et al. Learning How to Learn , 1984 .
[25] David J. Edwards,et al. Modelling the magnitude of plant downtime: a tool for improving plant operations management , 2001 .
[26] David J. Edwards,et al. Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry , 2002 .
[27] Khairy A.H. Kobbacy,et al. Towards An Intelligent Maintenance Optimization System , 1995 .
[28] Laeeque K. Daneshmend,et al. ECONOMIES OF SCALE IN MINING – ASSESSING UPPER BOUNDS WITH SIMULATION , 2000 .
[29] Philip A. Scarf,et al. On the application of mathematical models in maintenance , 1997 .
[30] Paul S. Ray,et al. A knowledge-based approach to maintenance project planning , 2002, Expert Syst. J. Knowl. Eng..
[31] Fan Zhang,et al. Optimal maintenance models with minimal repair, periodic overhaul and complete renewal , 1998 .
[32] I. Grossmann. Review of Nonlinear Mixed-Integer and Disjunctive Programming Techniques , 2002 .