Manufacturing intelligence to forecast and reduce semiconductor cycle time

Semiconductor manufacturing is one of the most complicated production processes with the challenges of dynamic job arrival, job re-circulation, shifting bottlenecks, and lengthy fabrication process. Owing to the lengthy wafer fabrication process, work in process (WIP) usually affects the cycle time and throughput in the semiconductor fabrication. As the applications of semiconductor have reached the era of consumer electronics, time to market has played an increasingly critical role in maintaining a competitive advantage for a semiconductor company. Many past studies have explored how to reduce the time of scheduling and dispatching in the production cycle. Focusing on real settings, this study aims to develop a manufacturing intelligence approach by integrating Gauss-Newton regression method and back-propagation neural network as basic model to forecast the cycle time of the production line, where WIP, capacity, utilization, average layers, and throughput are rendered as input factors for indentifying effective rules to control the levels of the corresponding factors as well as reduce the cycle time. Additionally, it develops an adaptive model for rapid response to change of production line status. To evaluate the validity of this approach, we conducted an empirical study on the demand change and production dynamics in a semiconductor foundry in Hsinchu Science Park. The approach proved to be successful in improving forecast accuracy and realigning the desired levels of throughput in production lines to reduce the cycle time.

[1]  John Miltenburg,et al.  Managing and reducing total cycle time: models and analysis , 1996 .

[2]  L. Sattler Using queueing curve approximations in a fab to determine productivity improvements , 1996, IEEE/SEMI 1996 Advanced Semiconductor Manufacturing Conference and Workshop. Theme-Innovative Approaches to Growth in the Semiconductor Industry. ASMC 96 Proceedings.

[3]  Robert C. Leachman,et al.  Special Issue: Franz Edelman Award for Achievement in Operations Research and the Management Sciences: SLIM: Short Cycle Time and Low Inventory in Manufacturing at Samsung Electronics , 2002, Interfaces.

[4]  Chen-Fu Chien,et al.  Manufacturing intelligence for semiconductor demand forecast based on technology diffusion and product life cycle , 2010 .

[5]  G.E. Moore,et al.  Cramming More Components Onto Integrated Circuits , 1998, Proceedings of the IEEE.

[6]  Russ M. Dabbas,et al.  Mining semiconductor manufacturing data for productivity improvement - an integrated relational database approach , 2001, Comput. Ind..

[7]  Chen-Fu Chien,et al.  Using genetic algorithms (GA) and a coloured timed Petri net (CTPN) for modelling the optimization-based schedule generator of a generic production scheduling system , 2007 .

[8]  R. Atherton,et al.  Signature Analysis: Simulation of Inventory, Cycle Time, and Throughput Trade-Offs in Wafer Fabrication , 1986 .

[9]  James R. Morrison,et al.  Practical Extensions to Cycle Time Approximations for the $G/G/m$-Queue With Applications , 2007, IEEE Transactions on Automation Science and Engineering.

[10]  Han-Pang Huang,et al.  On-line learning delivery decision support system for highly product mixed semiconductor foundry , 2002 .

[11]  Gerald T. Mackulak,et al.  Efficient cycle time-throughput curve generation using a fixed sample size procedure , 2001 .

[12]  Kuldeep Kumar,et al.  A comparative study for the estimation of parameters in nonlinear models , 1996 .

[13]  Hong Chen,et al.  Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication , 1988, Oper. Res..

[14]  Chen-Fu Chien,et al.  CONSTRUCTING SEMICONDUCTOR MANUFACTURING PERFORMANCE INDEXES AND APPLYING DATA MINING FOR MANUFACTURING DATA ANALYSIS , 2004 .

[15]  Chen-Fu Chien,et al.  Manufacturing Intelligence to Exploit the Value of Production and Tool Data to Reduce Cycle Time , 2011, IEEE Transactions on Automation Science and Engineering.

[16]  H. T. Papadopoulos,et al.  Minimizing WIP inventory in reliable production lines , 2001 .

[17]  G. Seber,et al.  Nonlinear Regression: Seber/Nonlinear Regression , 2005 .