Judicious order acceptance and order release in make-to-order manufacturing systems

This paper explores a two-stage input control system for fixed capacity make-to-order manufacturing systems (with heavy job tardiness penalties), that selectively accepts incoming orders and holds the accepted ones in a pre-shop queue prior to releasing them to the shop floor. Single-stage input control systems that only allow orders to be delayed in a pre-shop queue (i.e. they do not allow some orders to be rejected) have been previously investigated and found to negatively impact overall due-date performance. The hypothesis motivating this research is that judiciously rejecting a subset of incoming orders can prevent the order release queue from being overloaded when a surge of demand occurs. The input control system is evaluated via experiments using a discrete-event simulation model of a fixed capacity manufacturing system. The experiments reported here suggest that holding orders in the pre-shop queue does not improve due date performance, and that judiciously rejecting orders on its own is a viable alternative mechanism of input control that can deliver improved performance.

[1]  Steven A. Melnyk,et al.  ORDER REVIEW/RELEASE AND ITS IMPACT ON THE SHOP FLOOR. , 1988 .

[2]  S. S. Ackerman Even-Flow, A Scheduling Method for Reducing Lateness in Job Shops , 1963 .

[3]  Lawrence D. Fredendall,et al.  Assessing the impact of reducing demand variance through improved planning on the performance of a dual resource constrained job shop , 1995 .

[4]  Hans A. ten Kate,et al.  Towards a Better Understanding of Order Acceptance , 1994 .

[5]  P. M. Bobrowski,et al.  Work release strategies in a dual resource constrained job shop , 1989 .

[6]  Vincent A. Mabert,et al.  AN EVALUATION OF ORDER RELEASE MECHANISMS IN A JOB-SHOP ENVIRONMENT , 1988 .

[7]  D. R. Denzler,et al.  Evaluating variance control, order review/release and dispatching: a regression analysis , 1994 .

[8]  Steven A. Lippman,et al.  Applying a New Device in the Optimization of Exponential Queuing Systems , 1975, Oper. Res..

[9]  Kenneth R. Baker,et al.  Sequencing Rules and Due-Date Assignments in a Job Shop , 1984 .

[10]  Jwm Will Bertrand,et al.  The use of workload information to control job lateness in controlled and uncontrolled release production systems , 1983 .

[11]  J. J. Kanet Load-limited order release in job shop scheduling systems , 1988 .

[12]  Michael J. Magazine,et al.  A Classified Bibliography of Research on Optimal Design and Control of Queues , 1977, Oper. Res..

[13]  Richard H. Deane,et al.  A Loading and Balancing Methodology for Job Shop Control , 1974 .

[14]  Whm Henk Zijm,et al.  Order acceptance strategies in a production-to-order environment with setup times and due-dates , 1992 .

[15]  Steven A. Melnyk,et al.  Order review/release: research issues and perspectives , 1989 .

[16]  Meckinley Scott A Queueing Process with Some Discrimination , 1969 .

[17]  Timothy D. Fry,et al.  Capacity-based order review/release strategies to improve manufacturing performance , 1992 .

[18]  R. C. St. John,et al.  D-Optimality for Regression Designs: A Review , 1975 .

[19]  Hiroshi Awane,et al.  Input scheduling and load balance control for a job shop , 1984 .

[20]  Bruce L. Miller,et al.  A Queueing Reward System with Several Customer Classes , 1969 .

[21]  Reha Uzsoy,et al.  Scheduling and order release in a single-stage production system , 1995 .