R&D project planning with multiple trials in uncertain environments

We study project scheduling when individual activities carry a risk of failure, and where an activity's failure may lead to the project's overall failure. In the project planning and scheduling literature, this technological uncertainty has typically been ignored and project plans are developed only for scenarios in which the project succeeds. To mitigate the risk that an activity's failure jeopardizes the entire project, more than one alternative may exist for obtaining certain results, and these alternatives can be implemented either in parallel or sequentially, allowing to model the pursuit of alternative technologies.

[1]  Jiun-Yu Yu,et al.  Software for managing the risks and improving the profitability of pharmaceutical research , 2007 .

[2]  S. Creemers,et al.  Project scheduling for maximum NPV with variable activity durations and uncertain activity outcomes , 2008, 2008 IEEE International Conference on Industrial Engineering and Engineering Management.

[3]  Erik Demeulemeester,et al.  RanGen: A Random Network Generator for Activity-on-the-Node Networks , 2003, J. Sched..

[4]  Christoph H. Loch,et al.  Parallel and Sequential Testing of Design Alternatives , 2001, Manag. Sci..

[5]  R. Nelson Uncertainty, Learning, and the Economics of Parallel Research and Development Efforts , 1961 .

[6]  Christoph H. Loch,et al.  Selectionism and Learning in Projects with Complexity and Unforeseeable Uncertainty , 2004, Manag. Sci..

[7]  Vidyadhar G. Kulkarni,et al.  Markov and Markov-Regenerative pert Networks , 1986, Oper. Res..

[8]  Ignacio E. Grossmann,et al.  Optimization Models for the Scheduling of Testing Tasks in New Product Development , 1996 .

[9]  Erik Demeulemeester,et al.  Project network models with discounted cash flows a guided tour through recent developments , 1997, Eur. J. Oper. Res..

[10]  Franz Josef Radermacher,et al.  Preselective strategies for the optimization of stochastic project networks under resource constraints , 1983, Networks.

[11]  Meir J. Rosenblatt,et al.  Activity Delay in Stochastic Project Networks , 1997, Oper. Res..

[12]  Vipul Jain,et al.  Resource-Constrained Scheduling of Tests in New Product Development , 1999 .

[13]  Joseph G. Szmerekovsky,et al.  Scheduling projects with stochastic activity duration to maximize expected net present value , 2009, Eur. J. Oper. Res..

[14]  Tonguç Ünlüyurt,et al.  Sequential testing of complex systems: a review , 2004, Discret. Appl. Math..

[15]  Vidyadhar G. Kulkarni,et al.  A classified bibliography of research on stochastic PERT networks: 1966-1987 , 1989 .

[16]  Marc Lambrecht,et al.  Scheduling Markovian PERT networks with maximum-NPV objective , 2008 .

[17]  William J. Abernathy,et al.  Parallel Strategies in Development Projects , 1969 .

[18]  Roel Leus,et al.  R&D project scheduling when activities may fail , 2007 .

[19]  John C. Gittins,et al.  Models and software for improving the profitability of pharmaceutical research , 2008, Eur. J. Oper. Res..