Optimizing Postdisaster Reconstruction Planning for Damaged Transportation Networks

The limited availability of reconstruction resources is one of the main challenges that often confront postdisaster recovery of damaged transportation networks. This requires an effective and efficient deployment and utilization of these limited resources in order to minimize both the performance loss of the damaged transportation network and the reconstruction costs. This paper presents the development of a robust model for planning postdisaster reconstruction efforts that is capable of: (1) optimizing the allocation of limited reconstruction resources to competing recovery projects; (2) assessing and quantifying the overall functional loss of damaged transportation networks during the recovery efforts; (3) evaluating the impact of limited availability of resources on the reconstruction costs; and (4) minimizing the performance loss of transportation networks and reconstruction costs. The model utilizes the user equilibrium algorithm to enable the assessment of the transportation network performance losses and a multiobjective genetic algorithm to enable the generation of optimal tradeoffs between the two recovery planning objectives. An application example is analyzed to demonstrate the use and capabilities of the recovery planning model.

[1]  Yanyan Chen,et al.  Post-Earthquake Road Unblocked Reliability Estimation Based on an Analysis of Randomicity of Traffic Demands and Road Capacities , 2003 .

[2]  Dan M. Frangopol,et al.  Optimal planning of retrofitting interventions on bridges in a highway network , 1998 .

[3]  Michael G.H. Bell,et al.  Transportation Network Analysis: Bell/Transportation Network Analysis , 1997 .

[4]  J. G. Wardrop,et al.  Some Theoretical Aspects of Road Traffic Research , 1952 .

[5]  Nobuoto Nojima MEASURING LIFELINE SYSTEM PERFORMANCE: HIGHWAY TRANSPORTATION SYSTEMS IN RECENT EARTHQUAKES , 1998 .

[6]  James E. Moore,et al.  Integrated Planning Information Systems: Disaster Planning Analysis , 1995 .

[7]  Khaled A El-Rayes,et al.  Minimizing Construction-Related Hazards in Airport Expansion Projects , 2006 .

[8]  Gwo-Hshiung Tzeng,et al.  Multicriteria Planning of Post‐Earthquake Sustainable Reconstruction , 2002 .

[9]  Frank Kozin,et al.  System Study of Urban Response and Reconstruction due to Earthquake , 1990 .

[10]  Edsger W. Dijkstra,et al.  A note on two problems in connexion with graphs , 1959, Numerische Mathematik.

[11]  Khaled A El-Rayes,et al.  Trade-off between Safety and Cost in Planning Construction Site Layouts , 2005 .

[12]  George W. Housner,et al.  The Continuing Challenge: Report on the Performance of State Bridges in the Northridge Earthquake , 1995 .

[13]  Stephanie E. Chang,et al.  Measuring post-disaster transportation system performance: the 1995 Kobe earthquake in comparative perspective , 2001 .

[14]  Jacob P. Kovel,et al.  Using GIS in Emergency Management Operations , 2000 .

[15]  Kalyanmoy Deb,et al.  A fast and elitist multiobjective genetic algorithm: NSGA-II , 2002, IEEE Trans. Evol. Comput..

[16]  David E. Goldberg,et al.  Genetic Algorithms in Search Optimization and Machine Learning , 1988 .

[17]  James H. Lambert,et al.  PRIORITIZATION OF SCHEDULE DEPENDENCIES IN HURRICANE RECOVERY OF TRANSPORTATION AGENCY , 2002 .

[18]  Roozbeh Kangari,et al.  Planning for Disaster-Relief Construction , 1995 .

[19]  Y Iida,et al.  Transportation Network Analysis , 1997 .

[20]  Khaled A El-Rayes,et al.  Time-Cost-Quality Trade-Off Analysis for Highway Construction , 2005 .