Buffalo Field High-Pressure Air Injection Projects 1977 to 2007: Technical Performance and Operational Challenges
暂无分享,去创建一个
Dubert Gutierrez | Vinodh Kumar | Ronald J. Miller | Archie R. Taylor | Pete Thies | Archie R. Taylor | Vinodh Kumar | Ronald J. Miller
[1] Dubert Gutierrez,et al. Air Injection and Waterflood Performance Comparison of Two Adjacent Units in the Buffalo Field , 2008 .
[2] G. A. Huffman,et al. Pressure Maintenance by In-Situ Combustion, West Heidelberg Unit, Jasper County, Mississippi , 1983 .
[3] V. K. Kumar,et al. Estimation of Recovery Factor in Light-Oil Air-Injection Projects , 1997 .
[4] Dubert Gutierrez,et al. Recovery Factors in High-Pressure Air Injection Projects Revisited , 2008 .