Final report for tank 241-AP-101, grab samples 1AP-95-1, 1AP-95-2, 1AP-95-3, 1AP-95-4, 1AP-95-5, and 1AP-95-6
暂无分享,去创建一个
Six supernate grab samples (1AP-95-1 through 6) and one field blank (1AP-95-7) were taken from tank 241-AP-101, on Nov. 10 and 13, 1995. Analyses were performed in support of the Safety Screening and the Waste Compatibility Safety programs. All analytical results were within the action limits stated in the TSAP.