Performance of peak shaving policies for quay cranes at container terminals with double cycling
暂无分享,去创建一个
Ming Qin | Guolei Tang | Zhuoyao Zhao | Jingjing Yu | Chen Shen | G. Tang | Minglei Qin | Jingjing Yu | Zhuoyao Zhao | Chen Shen
[1] Giuseppe Parise,et al. Comprehensive Peak-Shaving Solutions for Port Cranes , 2017 .
[2] L. Martirano,et al. Wise port & business energy management: Portfacilities, electrical power distribution , 2014, 2014 IEEE Industry Application Society Annual Meeting.
[3] Anne Goodchild,et al. Crane double cycling in container ports: Planning methods and evaluation , 2007 .
[4] Harry Geerlings,et al. Opportunities for peak shaving the energy demand of ship-to-shore quay cranes at container terminals , 2018 .
[5] Gabriel Lodewijks,et al. Energy-aware control for automated container terminals using integrated flow shop scheduling and optimal control , 2014 .
[6] Ali H. Diabat,et al. A simulation-based Genetic Algorithm approach for the quay crane scheduling under uncertainty , 2016, Simul. Model. Pract. Theory.
[7] Kap Hwan Kim,et al. Maximizing the number of dual-cycle operations of quay cranes in container terminals , 2009, Comput. Ind. Eng..
[8] Rui Zhang,et al. Optimization for two-stage double-cycle operations in container terminals , 2015, Comput. Ind. Eng..
[9] Lixin Tang,et al. Modeling and solution of the joint quay crane and truck scheduling problem , 2014, Eur. J. Oper. Res..
[10] L. Martirano,et al. Optimization of Peak Load Shaving in STS Group Cranes Based on PSO Algorithm , 2018, 2018 IEEE International Conference on Environment and Electrical Engineering and 2018 IEEE Industrial and Commercial Power Systems Europe (EEEIC / I&CPS Europe).
[11] Chengbin Chu,et al. Optimal Algorithm for the General Quay Crane Double-Cycling Problem , 2015, Transp. Sci..
[12] Anne V. Goodchild,et al. Double-Cycling Strategies for Container Ships and Their Effect on Ship Loading and Unloading Operations , 2006, Transp. Sci..
[13] Tao Zhang,et al. Scheduling optimization of yard cranes with minimal energy consumption at container terminals , 2017, Comput. Ind. Eng..
[14] Keisuke Nagasawa,et al. Robust flow shop scheduling with random processing times for reduction of peak power consumption , 2015, Simul. Model. Pract. Theory.
[15] Feng Chu,et al. A polynomial-time heuristic for the quay crane double-cycling problem with internal-reshuffling operations , 2015 .
[16] Ying-En Ge,et al. Modeling assignment of quay cranes using queueing theory for minimizing CO 2 emission at a container terminal , 2017, Transportation Research Part D: Transport and Environment.
[17] Youfang Huang,et al. Yard crane scheduling in a container terminal for the trade-off between efficiency and energy consumption , 2015, Adv. Eng. Informatics.
[18] Anne Goodchild,et al. Reducing Train Turn Times with Double Cycling in New Terminal Designs , 2011 .
[19] Qian Zhang,et al. A simulation optimization approach for solving the dual-cycling problem in container terminals , 2015 .
[20] Qingcheng Zeng,et al. Modeling the productivity and stability of a terminal operation system with quay crane double cycling , 2019, Transportation Research Part E: Logistics and Transportation Review.
[21] Guolei Tang,et al. Multi-agent microscopic simulation based layout design for Lushun Ro-Pax terminal , 2019, Simul. Model. Pract. Theory.
[22] Youfang Huang,et al. Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumption , 2015, Expert Syst. Appl..
[23] J.H.R. van Duin,et al. Cooling down: A simulation approach to reduce energy peaks of reefers at terminals , 2018, Journal of Cleaner Production.
[24] Yue Wu,et al. Modelling of dual-cycle strategy for container storage and vehicle scheduling problems at automated container terminals , 2015 .